User contributions
Jump to navigation
Jump to search
- 09:21, 18 April 2023 diff hist 0 N File:Figure 101.04-1 stamp example.png
- 09:01, 18 April 2023 diff hist -4 FieldManager →Inspector's Daily Report (IDR)
- 08:59, 18 April 2023 diff hist 0 N File:Figure 101.04-1cont stamp.png current
- 08:55, 18 April 2023 diff hist 0 File:Figure 101.04-1cont E-Signed.png Clarkj25 uploaded a new version of File:Figure 101.04-1cont E-Signed.png current
- 08:52, 18 April 2023 diff hist 0 File:Figure 101.04-1cont E-Signed.png Clarkj25 uploaded a new version of File:Figure 101.04-1cont E-Signed.png
- 08:47, 18 April 2023 diff hist 0 File:Figure 101.04-1cont E-Signed.png Clarkj25 uploaded a new version of File:Figure 101.04-1cont E-Signed.png
- 16:27, 13 April 2023 diff hist -197 Certified Engineer Process →Certified Engineer Application Requirements
- 09:03, 13 April 2023 diff hist +59 Certified Engineer Process →Certified Engineer Application Requirements
- 17:29, 10 April 2023 diff hist -74 713 - Bridge Rehabilitation, Steel →Column Type current
- 17:28, 10 April 2023 diff hist +31 713 - Bridge Rehabilitation, Steel →Column Type
- 15:50, 6 April 2023 diff hist -362 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts →Routing of Form 1100A current
- 09:24, 6 April 2023 diff hist -31 205 - Roadway Earthwork →Controlled Density Method
- 09:23, 6 April 2023 diff hist +166 205 - Roadway Earthwork →Controlled Density Method
- 11:42, 5 April 2023 diff hist +87 Force Account Work →Guidelines to submit Force Account Work – Contractor’s Field Documentation
- 11:38, 5 April 2023 diff hist +35 Force Account Work →FORCE ACCOUNT WORK
- 11:37, 5 April 2023 diff hist -848 109.05 Payment for Contract Revisions
- 11:31, 5 April 2023 diff hist -40,984 109.05 Payment for Contract Revisions →FORCE ACCOUNT WORK
- 11:27, 5 April 2023 diff hist +35 109.05 Payment for Contract Revisions →FORCE ACCOUNT WORK
- 11:05, 5 April 2023 diff hist +125 Prevailing Wage →Jobsite Postings
- 09:18, 4 April 2023 diff hist +2 Prevailing Wage →Additional Information
- 14:09, 3 April 2023 diff hist +5 FieldManager →FieldManager
- 14:07, 3 April 2023 diff hist 0 Prevailing Wage →Multiple Wage Decisions
- 08:52, 3 April 2023 diff hist +48 Final Project Review →Final Project Review Package
- 08:49, 3 April 2023 diff hist +30 Final Project Review →Review Findings
- 08:46, 3 April 2023 diff hist -9 Final Project Review →Materials Review
- 08:45, 3 April 2023 diff hist +4 Final Project Review →Review Teams
- 11:44, 29 March 2023 diff hist -722 812 - Temporary Traffic Control for Construction Zone Operations →CONSTRUCTION current
- 11:36, 29 March 2023 diff hist +1 208 - Soil Erosion and Sedimentation Control (NPDES) →Contractor Obligation
- 10:25, 29 March 2023 diff hist 0 File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx current
- 10:24, 29 March 2023 diff hist 0 File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx current
- 12:21, 28 March 2023 diff hist +87 204 - Removing Miscellaneous Structures and Materials →CONSTRUCTION
- 12:07, 28 March 2023 diff hist +96 203 - Removing Drainage Structures, Culverts, and Sewers →CONSTRUCTION
- 12:05, 28 March 2023 diff hist +204 202 - Removing Trees, Stumps, and Corduroy →MEASUREMENT AND PAYMENT
- 12:01, 28 March 2023 diff hist +204 201 - Clearing →CONSTRUCTION current
- 11:59, 28 March 2023 diff hist +247 201 - Clearing →GENERAL
- 11:52, 28 March 2023 diff hist +182 201 - Clearing →GENERAL
- 10:04, 28 March 2023 diff hist 0 File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 10:03, 28 March 2023 diff hist 0 File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 17:08, 27 March 2023 diff hist +117 815 - Landscaping →GENERAL current
- 17:05, 27 March 2023 diff hist 0 815 - Landscaping →Unacceptable Plants
- 17:03, 27 March 2023 diff hist +33 815 - Landscaping →CONSTRUCTION
- 16:48, 27 March 2023 diff hist +66 815 - Landscaping →Unacceptable Plants
- 14:07, 23 March 2023 diff hist +79 109.05 Payment for Contract Revisions →Statements
- 17:17, 22 March 2023 diff hist -9 Certified Engineer Process →Current Certified Engineers
- 17:16, 22 March 2023 diff hist 0 N File:Engineer certification list - MARCH 2023.jpg current
- 17:11, 22 March 2023 diff hist 0 N File:Engineer certification list - MARCH 2023.pdf current
- 16:02, 20 March 2023 diff hist -9 Prevailing Wage →Additional Information
- 16:01, 20 March 2023 diff hist 0 N File:107.01 Laws to be Observed - MDOT Deficient-Notice-1.docx current
- 14:44, 20 March 2023 diff hist +364 Main Page →Recent Major Changes
- 14:39, 20 March 2023 diff hist -14 E-Signature →Guidance for Non-MDOT Users
- 14:38, 20 March 2023 diff hist +59 E-Signature →Guidance for Non-MDOT Users
- 14:38, 20 March 2023 diff hist -327 E-Signature →Guidance for Non-MDOT Users
- 14:35, 20 March 2023 diff hist -1,855 E-Signature →Adoption at MDOT and Acceptable Uses
- 14:17, 20 March 2023 diff hist +1 Main Page →Recent Major Changes
- 14:16, 20 March 2023 diff hist +286 Main Page →Recent Major Changes
- 14:13, 20 March 2023 diff hist +20 Preconstruction Meeting →Trunkline Boilerplate Preconstruction Meeting Minutes
- 14:13, 20 March 2023 diff hist 0 N File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 14:12, 20 March 2023 diff hist +11 Preconstruction Meeting →LAP Project Considerations
- 14:11, 20 March 2023 diff hist 0 N File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 13:10, 20 March 2023 diff hist -99 Prevailing Wage →Additional Information
- 13:04, 20 March 2023 diff hist -8 Prevailing Wage →Additional Information
- 12:58, 20 March 2023 diff hist +152 Prevailing Wage →Additional Information
- 15:59, 15 March 2023 diff hist -79 MDOT Construction Manual Content Revision Procedures →Construction Manual Change Process
- 15:32, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 15:31, 15 March 2023 diff hist 0 N File:2023 ACEC Presentation - Contract Mods2.pdf current
- 13:04, 15 March 2023 diff hist +52 Final Project Review →Further Information on Final Project Review
- 11:41, 15 March 2023 diff hist 0 N File:2023 ACEC Presentation - File Reviews.pdf current
- 11:09, 15 March 2023 diff hist +209 Final Project Review →FAQs for Final Project Review
- 09:34, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 09:31, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 09:28, 15 March 2023 diff hist +7 103.02 Contract Revisions →General Contract Modification Information
- 09:27, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 09:27, 15 March 2023 diff hist +48 103.02 Contract Revisions →General Contract Modification Information
- 09:24, 15 March 2023 diff hist -2 103.02 Contract Revisions →General Contract Modification Information
- 09:23, 15 March 2023 diff hist +48 103.02 Contract Revisions →General Contract Modification Information
- 09:21, 15 March 2023 diff hist +199 103.02 Contract Revisions →Generating Contract Modifications
- 09:17, 15 March 2023 diff hist 0 N File:2023 ACEC Presentation - Contract Mods.pdf current
- 16:02, 8 March 2023 diff hist -15 Dev Page →Recent Minor Changes current
- 10:02, 8 March 2023 diff hist +462 Main Page →Recent Major Changes
- 09:54, 8 March 2023 diff hist -7,588 108.07 Extension of Time on Work Day Contracts Replaced content with "<span style=color:red>There is no further content, see Spec Book and 108.09_Request_for_Time_Extensions_on_Work_Day,_Calendar_Day,_and_Calendar_Date_Contracts.</span>..." current Tag: Replaced
- 09:52, 8 March 2023 diff hist +98 108.08 Extension of Time on Calendar Day Contracts current
- 09:49, 8 March 2023 diff hist +77 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts →LAP Project Considerations
- 09:48, 8 March 2023 diff hist +7,729 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
- 09:39, 8 March 2023 diff hist +8 Main Page →Recent Minor Changes
- 09:39, 8 March 2023 diff hist +360 Main Page →Recent Minor Changes
- 09:32, 8 March 2023 diff hist 0 104.10 Claim for Extra Compensation or Extension of Time →General
- 13:59, 7 March 2023 diff hist -11 Main Page →Recent Minor Changes
- 13:59, 7 March 2023 diff hist +397 Main Page →Recent Minor Changes
- 13:51, 7 March 2023 diff hist +3 m 103.02 Contract Revisions →Contract Revisions - See Also
- 13:50, 7 March 2023 diff hist 0 N File:Appendix A - Approval Path Flow Chart UPDATED 3-7-23 Final.pdf current
- 17:10, 2 March 2023 diff hist -726 108.07 Extension of Time on Work Day Contracts →Routing of Form 1100A
- 09:42, 1 March 2023 diff hist +5 103.02 Contract Revisions →Contract Revisions - See Also
- 09:41, 1 March 2023 diff hist 0 N File:Appendix A - Approval Path Flow Chart UPDATED 2022 ver2.pdf current
- 09:36, 1 March 2023 diff hist 0 N File:Appendix A-2023.jpg current
- 11:44, 16 February 2023 diff hist +25 103.02 Contract Revisions →Contract Revisions - See Also
- 11:42, 16 February 2023 diff hist 0 N File:Appendix A - Approval Path Flow Chart UPDATED 2022.pdf current
- 18:32, 23 January 2023 diff hist 0 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 18:30, 23 January 2023 diff hist 0 N File:MI S&O RPI S O Plan Mound INFRA Zachary 2023.pdf current
- 18:24, 23 January 2023 diff hist -4 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 18:23, 23 January 2023 diff hist 0 N File:FHWA RBPI 2023.jpg current
- 18:19, 23 January 2023 diff hist +149 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:15, 12 January 2023 diff hist +476 Main Page
- 09:29, 12 December 2022 diff hist +377 107.09 Archeological and Historical Findings
- 14:15, 5 December 2022 diff hist -33 Certified Engineer Process →Certified Engineer Renewal Process
- 14:14, 5 December 2022 diff hist -1 Certified Engineer Process →Certified Engineer Review Audits
- 14:14, 5 December 2022 diff hist -32 Certified Engineer Process →Certified Engineer Application Requirements
- 14:13, 5 December 2022 diff hist +2 Certified Engineer Process →Certified Engineer Renewal Process
- 14:12, 5 December 2022 diff hist +83 Certified Engineer Process →Certified Engineer Application Requirements
- 14:11, 5 December 2022 diff hist +15 Certified Engineer Process →Certified Engineer Application Requirements
- 14:09, 5 December 2022 diff hist +17 Certified Engineer Process →Certified Engineer Application Requirements
- 16:51, 23 November 2022 diff hist -58 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 10:47, 22 November 2022 diff hist -226 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:32, 10 November 2022 diff hist +363 Main Page →Recent Minor Changes
- 13:25, 10 November 2022 diff hist +704 109.05 Payment for Contract Revisions →Labor
- 12:51, 2 November 2022 diff hist +22 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 12:47, 2 November 2022 diff hist +4 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 12:47, 2 November 2022 diff hist +11 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 12:46, 2 November 2022 diff hist -2 Force Account Work
- 12:44, 2 November 2022 diff hist +1 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 12:42, 2 November 2022 diff hist +135 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 12:40, 2 November 2022 diff hist 0 N File:CFS Blue Book.jpg current
- 17:30, 13 October 2022 diff hist +533 Prevailing Wage →LCPtracker
- 14:02, 11 October 2022 diff hist +347 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:59, 11 October 2022 diff hist 0 N File:PW Folder All RBPI.jpg current
- 13:50, 11 October 2022 diff hist +348 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:46, 11 October 2022 diff hist 0 N File:JN 128908 Bay (Lafayette Bascule) - RBPI S&O Plan.pdf current
- 13:46, 11 October 2022 diff hist 0 N File:FHWA RBPI Actions.jpg current
- 13:43, 11 October 2022 diff hist -46 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:42, 11 October 2022 diff hist 0 N File:PW Folder.jpg current
- 10:56, 5 October 2022 diff hist +397 Main Page →Recent Minor Changes
- 10:52, 5 October 2022 diff hist -650 811 - Permanent Pavement Markings →Uniform Price Adjustment, Regular Dry Paint and Low Temperature Waterborne Paint
- 10:50, 5 October 2022 diff hist +216 m 811 - Permanent Pavement Markings →MEASUREMENT AND PAYMENT
- 15:12, 3 October 2022 diff hist -40 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →Disadvantaged Business Enterprise (DBE) Participation as Regular Dealers of Liquid Asphalt
- 09:54, 26 September 2022 diff hist +250 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 09:53, 26 September 2022 diff hist +53 N File:00 Michigan Risk Based Project Involvement Guidance September 2021 FINAL.pdf FHWA Michigan Division Guidance on RBPI current
- 14:28, 7 September 2022 diff hist +202 109.07 Final Inspection, Acceptance, and Final Payment →Final Marked Plans
- 10:00, 30 August 2022 diff hist -43 FieldManager →MDOT Read-Only Files for Consultant Contracts
- 09:59, 30 August 2022 diff hist +40 FieldManager →Inspector's Daily Report (IDR)
- 09:58, 30 August 2022 diff hist +35 FieldManager →FieldManager
- 09:57, 30 August 2022 diff hist +38 FieldManager →FieldManager
- 09:54, 30 August 2022 diff hist +41 Main Page →AASHTOWare Project Construction & Materials Software Manual
- 09:53, 30 August 2022 diff hist +48 Main Page →AASHTOWare Project Construction & Materials Software Manual
- 09:49, 30 August 2022 diff hist +84 Main Page →AASHTOWare Project Construction & Materials Software Manual
- 12:26, 22 August 2022 diff hist 0 Help:Contents →Sign Up for Updates current
- 09:14, 17 August 2022 diff hist +29 Local Agency Program (LAP) →Construction Engineering Requirements
- 09:11, 17 August 2022 diff hist +14 Local Agency Program (LAP) →Construction Engineering Requirements
- 14:53, 16 August 2022 diff hist +352 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 14:44, 16 August 2022 diff hist +302 104.10 Claim for Extra Compensation or Extension of Time →General
- 15:15, 2 August 2022 diff hist +184 Construction Value Engineering Change Proposal (VECP)
- 15:08, 2 August 2022 diff hist -3,761 103.02 Contract Revisions
- 14:57, 2 August 2022 diff hist -3,397 103.02 Contract Revisions
- 14:52, 2 August 2022 diff hist +6,179 103.02 Contract Revisions
- 14:41, 2 August 2022 diff hist +3 103.02 Contract Revisions →Construction Contract Modification Process Overview
- 14:36, 2 August 2022 diff hist +151 103.02 Contract Revisions →Revisions to the Contract
- 14:26, 2 August 2022 diff hist +180 103.02 Contract Revisions →Construction Contract Modification Process Overview
- 14:22, 2 August 2022 diff hist -167 103.02 Contract Revisions →LAP Project Considerations
- 14:15, 2 August 2022 diff hist -141 103.02 Contract Revisions →FHWA Approval
- 14:14, 2 August 2022 diff hist -4,448 103.02 Contract Revisions →Requirements for FHWA Review on Projects of Division Interest (PoDI)
- 14:13, 2 August 2022 diff hist +554 N FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) Created page with "FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) Various Federal Highway Administration (FHWA) involvement activities may be necessary..."
- 14:09, 2 August 2022 diff hist +2,904 103.02 Contract Revisions →Revisions to the Contract
- 13:58, 2 August 2022 diff hist +14 103.02 Contract Revisions →Construction Contract Modification Process Overview
- 13:57, 2 August 2022 diff hist +760 103.02 Contract Revisions →Construction Contract Modification Process Overview
- 10:17, 27 July 2022 diff hist +82 811 - Permanent Pavement Markings
- 10:14, 27 July 2022 diff hist +82 811 - Permanent Pavement Markings →Moisture Test
- 10:13, 27 July 2022 diff hist +238 811 - Permanent Pavement Markings →Binder and Bead Plate Sample
- 10:12, 27 July 2022 diff hist +165 811 - Permanent Pavement Markings →Field Inspection Checklist
- 10:11, 27 July 2022 diff hist +160 811 - Permanent Pavement Markings →Pavement Marking Inspection Frequently Asked Questions
- 10:10, 27 July 2022 diff hist +164 811 - Permanent Pavement Markings →Construction Guidance for Pavement Marking Projects
- 10:01, 27 July 2022 diff hist +548 108.10 Liquidated Damages current
- 09:57, 27 July 2022 diff hist +76 108.10 Liquidated Damages
- 09:52, 27 July 2022 diff hist -22 108.10 Liquidated Damages
- 13:51, 26 July 2022 diff hist +56 108.05 Progress Schedule →Progress Schedule
- 13:39, 26 July 2022 diff hist +64 Materials Quality Assurance Procedures Manual →2019 Summary of Revisions to the MQAP
- 13:38, 26 July 2022 diff hist +65 Materials Quality Assurance Procedures Manual →2019 Summary of Revisions to the MQAP
- 13:37, 26 July 2022 diff hist -5 Materials Quality Assurance Procedures Manual →2021 Summary of Revisions to the MQAP
- 13:35, 26 July 2022 diff hist -9 Digital Calculations for Payment →Digital Calculations for Payment
- 13:22, 26 July 2022 diff hist -5 103.02 Contract Revisions →Construction Contract Modification Process Overview
- 13:22, 26 July 2022 diff hist -5 707 - Structural Steel →Additional Specifications current
- 13:21, 26 July 2022 diff hist -10 Section 601 - Portland Cement Concrete for Pavements current
- 13:21, 26 July 2022 diff hist -27 Dev Page →Preamble
- 13:20, 26 July 2022 diff hist -4 109.05 Payment for Contract Revisions →Subcontracting or Hiring Services by Others
- 13:20, 26 July 2022 diff hist -4 109.05 Payment for Contract Revisions →Equipment not listed on Blue Book (EquipmentWatch)
- 13:20, 26 July 2022 diff hist -5 109.05 Payment for Contract Revisions →Equipment listed in the Blue Book (EquipmentWatch)
- 13:19, 26 July 2022 diff hist -5 109.05 Payment for Contract Revisions →FORCE ACCOUNT WORK
- 13:18, 26 July 2022 diff hist -4 Force Account Work →Subcontracting or Hiring Services by Others
- 13:18, 26 July 2022 diff hist -4 Force Account Work →Equipment not listed on Blue Book (EquipmentWatch)
- 13:18, 26 July 2022 diff hist -5 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 13:17, 26 July 2022 diff hist -5 Force Account Work →FORCE ACCOUNT WORK
- 13:16, 26 July 2022 diff hist -10 811 - Permanent Pavement Markings →Field Inspection Checklist
- 13:16, 26 July 2022 diff hist -5 811 - Permanent Pavement Markings →Binder and Bead Plate Sample
- 13:15, 26 July 2022 diff hist -6 811 - Permanent Pavement Markings →Recertification after Revocation
- 13:15, 26 July 2022 diff hist -6 811 - Permanent Pavement Markings →Step 3
- 13:15, 26 July 2022 diff hist -5 811 - Permanent Pavement Markings →Equipment Certification Guidelines
- 13:14, 26 July 2022 diff hist -10 Local Agency Program (LAP) →Local Agency Cost Reimbursement for Liquidated Damages
- 13:13, 26 July 2022 diff hist +12 Final Project Review →Review Findings
- 13:12, 26 July 2022 diff hist -4 816 - Turf Establishment →Use of Soluble and Insoluble Fertilizers current
- 13:11, 26 July 2022 diff hist -10 Section 701 - Portland Cement Concrete for Structures current
- 14:04, 25 July 2022 diff hist +21 104.10 Claim for Extra Compensation or Extension of Time
- 11:32, 21 July 2022 diff hist 0 Disadvantaged Business Enterprises (DBE) →Questions
- 11:31, 21 July 2022 diff hist -1 Construction Value Engineering Change Proposal (VECP)
- 11:30, 21 July 2022 diff hist 0 Disadvantaged Business Enterprises (DBE) →Questions
- 13:29, 17 May 2022 diff hist +15 Main Page →Current News
- 13:24, 17 May 2022 diff hist -292 Main Page →Current News
- 13:21, 17 May 2022 diff hist +68 Main Page →Current News
- 13:19, 17 May 2022 diff hist +131 Main Page →New FieldManager Helpdesk Number
- 10:58, 4 May 2022 diff hist +201 Project Delays Due to a Utility Company current
- 15:35, 11 April 2022 diff hist +17 Notice of Non-Compliance with Contract Requirements
- 15:33, 11 April 2022 diff hist 0 Notice of Non-Compliance with Contract Requirements
- 13:05, 7 April 2022 diff hist -80 m Main Page
- 14:04, 23 March 2022 diff hist +1 E-Signature →Adoption at MDOT and Acceptable Uses
- 14:04, 23 March 2022 diff hist +231 E-Signature →Guidance for Non-MDOT Users
- 13:57, 23 March 2022 diff hist +67 E-Signature
- 13:55, 23 March 2022 diff hist +379 E-Signature
- 10:17, 16 March 2022 diff hist +304 m Main Page →Recent Major Changes
- 12:33, 14 March 2022 diff hist 0 Holiday Traffic Safety Provisions current
- 12:27, 14 March 2022 diff hist -3 Holiday Traffic Safety Provisions
- 12:08, 14 March 2022 diff hist 0 Holiday Traffic Safety Provisions
- 12:03, 14 March 2022 diff hist 0 Holiday Traffic Safety Provisions
- 12:02, 14 March 2022 diff hist +1,270 Holiday Traffic Safety Provisions
- 11:29, 10 March 2022 diff hist -51 Holiday Traffic Safety Provisions
- 11:27, 10 March 2022 diff hist -1,520 m Holiday Traffic Safety Provisions
- 17:13, 14 February 2022 diff hist +21 m 208 - Soil Erosion and Sedimentation Control (NPDES) minor edit change MDOT to Construction engineer */
- 12:36, 13 January 2022 diff hist +10 N Category:Division 5 Created page with "Division 5"
- 11:46, 21 December 2021 diff hist +6 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 11:45, 21 December 2021 diff hist -23 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 11:43, 21 December 2021 diff hist +112 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 11:41, 21 December 2021 diff hist +41 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 11:32, 21 December 2021 diff hist +139 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 11:29, 21 December 2021 diff hist +41 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 15:04, 14 December 2021 diff hist -146 208 - Soil Erosion and Sedimentation Control (NPDES)
- 17:13, 30 November 2021 diff hist -1 208 - Soil Erosion and Sedimentation Control (NPDES) →Sediment Discharge into Waters of the State of Michigan
- 11:27, 26 October 2021 diff hist -43 105.10 Buy America Source of Steel and Iron
- 11:26, 26 October 2021 diff hist +83 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →Disadvantaged Business Enterprise (DBE) Participation as Regular Dealers of Liquid Asphalt
- 11:24, 26 October 2021 diff hist +81 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →Disadvantaged Business Enterprise (DBE) Participation as Regular Dealers of Liquid Asphalt
- 11:23, 26 October 2021 diff hist +83 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →Prompt Payment
- 11:21, 26 October 2021 diff hist -21 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)
- 11:20, 26 October 2021 diff hist +79 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →DISADVANTAGED BUSINESS ENTERPRISES (DBE’s)
- 11:19, 26 October 2021 diff hist +101 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →DBE Commercially Useful Function (CUF) Requirements
- 11:17, 26 October 2021 diff hist +80 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →SUBLETTING CONTRACT WORK TO DISADVANTAGED BUSINESS ENTERPRISES (DBE)
- 11:15, 26 October 2021 diff hist +74 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →SUBLETTING CONTRACT WORK TO DISADVANTAGED BUSINESS ENTERPRISES (DBE)
- 11:13, 26 October 2021 diff hist +118 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →DISADVANTAGED BUSINESS ENTERPRISES (DBE’s)
- 11:10, 26 October 2021 diff hist +77 109.05 Payment for Contract Revisions →Small Tools
- 11:04, 26 October 2021 diff hist -4 Local Agency Program (LAP) →MDOT Construction Oversight of Local Agency Program (LAP) Projects
- 11:03, 26 October 2021 diff hist -44 Materials Quality Assurance Procedures Manual
- 11:00, 26 October 2021 diff hist -45 108.01 Subcontracting of Contract Work →SUBCONTRACTING OF CONTRACT WORK
- 11:58, 25 October 2021 diff hist 0 109.05 Payment for Contract Revisions
- 11:28, 25 October 2021 diff hist -1 Force Account Work →Small Tools
- 11:26, 25 October 2021 diff hist -11 104.10 Claim for Extra Compensation or Extension of Time
- 11:23, 25 October 2021 diff hist 0 109.04 Progress and Partial Payments
- 10:53, 25 October 2021 diff hist 0 m 109.08 Prompt Payment