Search results

Jump to navigation Jump to search
  • ...funded construction project. The same procedures for inspection, pay item documentation, quality control/quality assurance testing, and materials testing must be f
    1 KB (157 words) - 09:42, 3 January 2018
  • ...portance. Failure to follow the procedures can result in loss of State and/or Federal-Aid funding for the projects. ...intain current certification. All existing office technician certification or similarly titled certifications expire after four (4) years unless stated o
    2 KB (218 words) - 09:59, 3 April 2024
  • ==Interim Project Documentation Reviews== ...s early in the active portion of the project as practical to ensure proper documentation throughout the remainder of the project. Document all interim review findi
    4 KB (556 words) - 15:47, 6 May 2021
  • ...ions from established MDOT procedures are required related to construction documentation the Engineer must document a Letter to the File explaining the situation, r #A description of the issue/deficiency, deviation from contract or MDOT Construction Manual, including quantities and costs
    3 KB (387 words) - 15:48, 6 May 2021
  • -- Configuration for Module:Documentation -- Here you can set the values of the parameters and messages used in Module:Documentation to
    18 KB (2,100 words) - 09:28, 3 July 2014
  • ...ly funded project’s limits are proposed to be extended, regardless of cost or oversight responsibilities. '''''Failure to obtain environmental clearance ...ineer of Construction and Technology will notify the requestor of a denial or acceptance within five business days.
    4 KB (572 words) - 14:54, 19 January 2022
  • ===[[#Documentation|Documentation]]=== ...e to be removed or reduced to smaller diameter particles with a jackhammer or similar device.
    4 KB (536 words) - 14:18, 16 February 2022
  • ...warranty special provision still require inspection staffing and complete documentation prior to payment, including MDOT materials certifications, MDOT yield check ...ing projects, including those that contain special provisions 03SP502D and/or 03SP502E. These tasks include:
    6 KB (848 words) - 14:44, 19 January 2022
  • Perhaps the single most important type of project documentation is the Inspector’s Daily Report (IDR) and its variations. Because of the ...ntities by underlining, underlining in red, recording in a different color or some other method.
    3 KB (456 words) - 14:09, 28 January 2013
  • ...uing pay item adjustments can be found in the applicable special provision or the Standard Specifications for Construction. ...opriately evaluates potential negative assessments, rejection of material, or removal of material in a timely manner. The review will promote efficient
    9 KB (1,226 words) - 10:05, 2 May 2023
  • ...ion-635.123 23 CFR 635.123] outlines the regulations for determination and documentation of pay quantities. Materials specifically produced or purchased for the project and stockpiled for use on the project may be paid
    4 KB (456 words) - 09:22, 11 July 2023
  • ...erial on unstable, saturated or rutted subgrade and that placement methods or equipment do not distort (rut) the existing subgrade. ...obtained. This information needs to be recorded in a field book or other documentation.
    3 KB (427 words) - 14:12, 16 February 2022
  • ...h any request for an extension to the durations, whether by the Contractor or the Department, documented in writing. ...notified of claim prior to settlement and have opportunity to review claim documentation prior to settlement. Regulations concerning FHWA participation in claims c
    4 KB (643 words) - 12:08, 12 March 2024
  • ...tion 109.05.C. When negotiating price(s), the engineer should include one or more of the following applicable details during the analysis and justificat ...it prices on other projects in the area, weighted average unit prices, and/or historical prices for similar work.
    6 KB (868 words) - 13:19, 6 June 2023
  • ...subcontract attachments, in their office or project files (either in paper or electronic format). Subcontracting requirements do not affect the required ...FS) subcontract compliance analyst to schedule and perform the interim and/or post construction reviews. The review is performed to ensure the subcontrac
    5 KB (744 words) - 17:38, 12 January 2022
  • #Changed Condition Utility Delay - Utility delays and/or extras resulting from the department’s design phase utility coordination ...uction defines compensable delays. Although this section includes utility or railroad interference within the project limits, the delays caused by [http
    9 KB (1,295 words) - 10:58, 4 May 2022
  • ...ce Assessment Program (CAP) review noted several findings related to field documentation on construction projects. FHWA and MDOT [[media:CAP Action Plan MAD JUN1720 ...nspector Daily Reports, calculations, forms, reporting requirements, field documentation, etc. This procedure will be incorporated into the MDOT Construction Manua
    3 KB (453 words) - 15:43, 6 May 2021
  • local namespace = getNamespace(args) or 'other' -- "other" avoids nil table keys local params = mappings[namespace] or {}
    6 KB (836 words) - 09:28, 3 July 2014
  • ...incorporated into the project, regardless if they are defined as temporary or not, must meet the requirements in the Special Provision for Source of Stee * Steel or iron products used in pavements, bridges, tunnels or other structures, which include, but are not limited to, the following: fab
    14 KB (2,171 words) - 07:32, 19 September 2023
  • ..., and creating egress and ingress for temporary batch plants. When ingress or egress is added to a current interstate, MDOT must request written permissi ...-approved during the design process, but any new breaks, location changes, or other modifications occurring after letting will need to follow the guidanc
    4 KB (581 words) - 11:59, 22 May 2023
  • ...sponsible for the project documentation regardless of who is on their team or how long they have been in charge of the project. Certified engineers who a ** Current Office Technician Certificate of Completion OR
    10 KB (1,464 words) - 13:56, 29 November 2023
  • ...nal requirements at a less cost or improve value or service at no increase or a minor increase in cost. The net savings of each proposal is usually share ...of maintenance, desired appearance, impact on utilities and right-of-way, or the design and safety standards.
    9 KB (1,297 words) - 14:57, 11 October 2022
  • If the HMA surface removed is 5 inches (130 mm) or less in thickness, the surface is considered part of the underlying materia ...in thickness and overlying a material such as concrete, masonry, aggregate or earth that is also removed, it will be measured and paid for as '''Pavement
    10 KB (1,390 words) - 10:07, 13 September 2023
  • ...e. Conversely a particular section might have topics that are unique and/or supplementary to the template.'' ...section should also describe why the work is done or what purpose the item or work serves in general. (IE Paint marking helps drivers delineate traffic
    14 KB (2,089 words) - 09:11, 11 April 2024
  • ...staked by project personnel with assistance of the Region Resource Analyst or Roadside Development personnel. ...on or species on the plans. This record will fulfill the requirements for documentation of location of the various plants. This report is subject to revision to c
    6 KB (797 words) - 17:08, 27 March 2023
  • ...cy:</u> A file deficiency that can be corrected with proper documentation or a letter to the file. *Documentation added to the file
    13 KB (1,768 words) - 11:05, 13 July 2023
  • ...ng documentation for this pay item is to be an IDR posted by the engineer (or their representative) and placed in the project file. The IDR is to be gen
    2 KB (256 words) - 17:42, 12 January 2022
  • ...on/index.php/Certified_Engineer_Process MDOT’s Certified Engineer Program] or is not eligible to obtain certification under this program. The non-certif ...he FPR is to verify that final contract quantities are supported by proper documentation and have been paid in accordance with contract documents and MDOT’s Stand
    19 KB (2,779 words) - 17:01, 6 November 2023
  • -- This module implements {{documentation}}. local cfg = mw.loadData('Module:Documentation/config')
    35 KB (4,418 words) - 09:28, 3 July 2014
  • ...ing, testing and acceptance can be referred to the Region materials staff, or to the Construction and Technology Support Area staff. ...e during their preparation, storage and use regardless of previous testing or manufacturer certifications. This applies to materials such as HMA and con
    5 KB (767 words) - 14:44, 21 September 2023
  • ...color, religion (in the context of employment), sex, national origin, age, or disability. ...is MDOT’s Title VI Coordinator. Orlando can be contacted at 517-241-7462 or at [mailto:CurryO@michigan.gov Orlando Curry] for any issues related to civ
    16 KB (2,309 words) - 14:51, 21 March 2024
  • ...ate to a category of projects, capital program administrative testing, and/or to perform testing related work for an un-programmed project wherein the ac *Construction season closing process, including preparation of forms, documentation, manual updates, etc. (salary and travel).
    5 KB (701 words) - 08:12, 16 October 2023
  • ...ication should be documented accordingly by means of IDR, or other project documentation. ...he material delivered to the project against the materials source list and/or FieldBook associations.
    4 KB (611 words) - 16:09, 25 May 2022
  • ...n Engineering || Provide full or as needed construction administration and/or inspection services. ...onnection and processing of multiple sub-systems data, and the display and/or control in a Traffic Operations Center (TOC). A TOC is a physical location
    17 KB (2,411 words) - 15:12, 19 June 2017
  • ...ges– These types of changes will not require additional approval processes or assembly of review teams. ...e program either monetarily, staffing, equipment, procedural, material and documentation requirements. Type 3 Major Changes are noted in the Major Changes Table on
    5 KB (787 words) - 14:52, 19 December 2023
  • ...s will be applicable for trunkline projects with final completion dates on or after June 5, 2024. ...-compliance may assist the Contract Performance Evaluation Review Team and/or MDOT’s Prequalification Committee when reviewing patterns and trends. Th
    20 KB (2,842 words) - 13:29, 4 October 2023
  • ...ade mix designs and provide them to the Engineer along with the supporting documentation (temperature, slump, air content and compressive strength) from each trial ...pecifications include either non-standard (MDOT specified) concrete mixes, or ones that are known to generate compressive strengths substantially higher
    26 KB (3,908 words) - 11:41, 10 January 2024
  • ...and diligent in promptly submitting material documentation and supporting documentation per the specifications and special provisions in the contract. If they have #The contractor should have a quality assurance check on documentation submittals to ensure that the submittals are in the correct format with ide
    28 KB (4,153 words) - 15:37, 11 January 2024
  • ...ls used in MDOT’s construction and maintenance projects must be tested and/or approved before incorporation into the project. Materials are approved bas Proprietary materials or products previously evaluated and approved by C&T. Approved materials and
    21 KB (3,052 words) - 16:41, 22 November 2023
  • ...and Technology Environmental Compliance Group by telephone at 517-322-1205 or Fax at 517-322-5664. Other backup numbers to call are 517-322-1647 and 517 ** Verification that the tank is located within MDOT or local agency ROW.
    9 KB (1,330 words) - 14:21, 23 September 2021
  • ...and understanding the Contractor's work with other projects working within or near the contract limits. * Is required to resolve construction disputes and/or claims concerning contract time.
    8 KB (1,206 words) - 14:27, 29 February 2024
  • ...ers directly at the construction sites and later transferred to a network, or desktop computer, located in the field office responsible for managing the ...er and FieldBook Tutorials, FieldManager User’s Guide, Trns*port interface or technical questions, please contact the Help Desk [mailto:MDOT-Construction
    25 KB (3,668 words) - 12:17, 1 May 2024
  • ...-of-way (ROW) agreements should also be checked for any special provisions or agreements. ...n on the plans. Stumps and roots need not be removed from peat excavation or disposal areas. Stumps may be buried with a minimum cover of 2 feet (700 m
    8 KB (1,133 words) - 12:01, 28 March 2023
  • ...not reasonably be determined, the work starts before prices are negotiated or other payment methods for compensation are impractical. Any work started b ...eer must approve the additional work (Approval can be documented on an IDR or an e-mail).
    41 KB (6,267 words) - 17:31, 6 June 2023
  • ...nstruction and maintenance projects by the department, railroad companies, or private industry are the basis for most railroad-highway projects. ...ment, field, and operations personnel to facilitate safety recommendations or activities related to proposed projects. Non-trunkline on-site inspections
    12 KB (1,772 words) - 17:35, 14 December 2023
  • MDOT will not sample, nor test for quality control or assist in controlling the Contractor’s production operations. However, c ...Engineer records of QC tests and inspections within 24 hours after testing or inspection in a format acceptable to the Engineer.
    30 KB (4,172 words) - 17:23, 3 January 2024
  • Progress clause documentation must also take this 12 month acceptance period into account for final proje ...imes associated with unique special provisions where certain manufacturers or products are specified. More information regarding steel superstructure is
    14 KB (2,146 words) - 13:54, 29 November 2023
  • <b>Local Public Agency (LPA):</b> The Michigan Public Act 51 city, village, or county road commission/department who applied, thru MDOT, for funds to perf ...te project signatory responsibilities to MDOT staff of an equivalent level or higher.
    30 KB (4,182 words) - 18:40, 13 December 2023
  • ...treams. Any work below the ordinary high-water elevation of an inland lake or stream requires an Inland Lakes and Streams Permit. ...ny construction, enlargement, repair, reconstruction, alteration, removal, or abandonment of any dam requires a Dam Safety Permit.
    19 KB (2,830 words) - 17:02, 15 February 2024
  • ...Engineer. The Engineer has 30 days to address all deficiencies and submit documentation once the Final Project Review Report is received. ...details are fresh and personnel are readily available. When all work and documentation is complete then the Final Project Review can be completed.
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...be required of all Contractors having a contract which is funded in whole or in part with federal funds. The Contractor may, after award, request a waiver or modification of the DBE participation goal. The Contractor must submit evid
    27 KB (4,137 words) - 14:31, 17 April 2024
  • ...mpactive effort would only drive the backfill into the remaining material, or where it is not desirable to impound water in impervious soils that would t ...ground is not a pay item in this instance. Density tests are required for documentation.
    7 KB (1,044 words) - 10:08, 13 September 2023
  • ...equipment when inside containments or when exposed to dust containing lead or solvent and paint fumes. At a minimum, MDOT is required to provide a medica ...l notify the Engineer of the employee’s test results if the results are at or above 15 µg/dL.
    33 KB (4,797 words) - 11:46, 25 April 2023
  • ==BRIDGE CONSTRUCTION AND BRIDGE DECK CONSTRUCTION INSPECTION AND DOCUMENTATION== ...rcement, wet and dry bridge deck concrete depth measurements, and required documentation for bridge construction inspection. This document must be coordinated with
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ...dge Elements and Systems (PBES) other than beams, and sound wall posts and/or panels. ...g and refer to whether the strands are tensioned before concrete placement or after concrete placement, respectively.
    27 KB (4,105 words) - 11:45, 19 January 2022
  • ...the past would have been covered with sod are now being treated with mulch or mulch blanket, as well as topsoil, seed and fertilizer. The amount of sod ...be dressed to plan tolerance. Plans will usually show areas requiring sod or mulch blanket. A permit to place should be issued before work begins.
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ...orporated in the work. Materials should be checked for damage in shipment or storage and to insure conformity to the required dimension, appearance and ...duction, manufacture or supplier's storage by the Bureau of Field Services or an appointed representative. The project office should receive the resulti
    15 KB (2,322 words) - 11:43, 19 January 2022
  • ...ssed for any revisions to the contract that alters the nature, scope, cost or schedule of the project. ...fication. Contract revisions may be positive or negative in dollar value, or even have no dollar value associated. The criteria for determining approva
    50 KB (7,380 words) - 16:11, 1 April 2024
  • ...e typically used on MDOT projects, column type supports from below, hanger or suspension type supports from above, and diaphragm types, where the hydraul ...emporary hanger rods are used, reject any rods with notches, nicks, welds, or excessive corrosion. Each length of bar used to make hanger rods must be sa
    14 KB (2,289 words) - 17:29, 10 April 2023
  • ...onduit or pipe that is constructed to convey treated water for consumption or to provide water for emergency services such as Fire Departments. The pipes ...ide of the pipe. Each section of pipe can either come with push-on joints or be bolted mechanically. Note that there may be additional material require
    18 KB (2,799 words) - 14:01, 27 September 2023
  • ...following standard naming convention for naming and organizing electronic documentation created during the administration of state and federally funded constructio '''Format: | FFFF or Variable | XXX | YYYY-MM-DD | XXXX | RX | Variable | XXXXXX'''
    57 KB (6,809 words) - 11:51, 1 May 2024
  • ...may result in heavy vehicles or construction equipment turning on the line or tracking material over a recessed area. ...is includes multiple applications applied in late fall, winter months, and/or early spring prior to durable markings being placed, being mindful of seaso
    56 KB (7,443 words) - 17:48, 9 October 2023
  • ...-ConstructionSoftware@michigan.gov MDOT-ConstructionSoftware@michigan.gov] or the FieldManager Helpdesk email [mailto:FieldManager-Admin@michigan.gov Fie ..., & updated flow chart. Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k||[https://mdotwiki.state.mi.us/construct
    68 KB (8,802 words) - 12:10, 1 May 2024
  • ...ype of joints specified. Pavement includes mainline pavement, base course or concrete shoulders. * Concrete pavement condition survey or project log
    23 KB (3,714 words) - 10:16, 13 September 2023
  • ...perly constructed & installed correctly in the proper location. Misplaced or irregular signs can create a critical hazard to traffic. ...hall be complete and cover all materials which are identified on the plans or in the specifications. The Materials source list and documentations shall b
    19 KB (2,827 words) - 15:38, 2 April 2024
  • ...orkers whose duties are primarily administrative, executive, professional, or clerical, rather than manual. The required contract clauses exerting prevai ...that must be met or exceeded to comply with the requirements. A contractor or subcontractor performing work subject to a DBRA wage determination may sati
    63 KB (9,521 words) - 14:09, 1 April 2024
  • ...ted into the finished work at least 3 feet below the surface of the ground or is entirely under water. ...rent requirements of the National Ready Mixed Concrete Association (NRMCA) or other Department approved certification programs for automatic control and
    36 KB (5,127 words) - 13:21, 26 July 2022
  • ...cify treated timber piles. Foundation piles provide support for the bridge or structure when the existing soils do not provide adequate bearing capacity ...iles are battered no flatter than 3V:1H. This can be increased to 2.5V:1H or even 2V:1H where soil conditions are not good enough to provide sufficient
    32 KB (5,122 words) - 14:16, 29 February 2024
  • ...ons for Construction. Structural steel may be in the form of plate, rolled or bent shapes, hollow structural shapes, tube railing, steel deck grating, mo ...ngs are generally scheduled when the fabrication is more complex in nature or the fabricator is new to working with the Department but can be held for an
    45 KB (7,017 words) - 13:22, 26 July 2022
  • ...be incorporated in the pavement have been approved for use through testing or via pre-approved products lists as required for the contract. Most material ...rify that the assemblies were built in accordance with the standard plans. Documentation of Acceptance by Region materials personnel is required. Figures 602-1 and
    87 KB (13,988 words) - 15:30, 8 May 2024
  • ...rrow material. The Contractor will not remove borrow from the highway ROW or from MDOT-owned excess property unless authorized by the Engineer. Prior t ...remove borrow material from outside the grading limits (and either inside or outside the ROW), a statement disclaiming the quality and usefulness of the
    78 KB (12,236 words) - 14:45, 21 September 2023
  • ...and know how to perform the assigned tasks. Everyone, regardless of title or job function, must be aware of the need for safe work practices. Occupatio ...ed on one side with respect to a reference surface such as an adjacent mat or cut. It is used to match the profile of the edge of a mat to that of the a
    139 KB (21,114 words) - 15:08, 30 January 2024
  • ...ecking into a known elevation; alignment operations, such as bridge layout or sewer staking, are not to be left before checking into known control points ...rs are acceptable. Data generated with data collectors and total stations or GPS units must be downloaded and a hard copy provided. It must be provided
    201 KB (30,214 words) - 14:43, 19 June 2017
  • ...on, grouting, and carbon fiber wrapping. These rehabilitation techniques, or any combination of them, are used to improve the existing condition, and in ...eas of concrete removal, saw cutting the boundaries, hand chipping shallow or hand chipping deep, patch preparation and placing of the new concrete. Dec
    84 KB (13,299 words) - 11:46, 19 January 2022