Category:Construction Manual
Jump to navigation
Jump to search
(previous page) (next page)
Construction Manual
Subcategories
This category has the following 23 subcategories, out of 23 total.
C
D
N
S
Pages in category "Construction Manual"
The following 200 pages are in this category, out of 232 total.
(previous page) (next page)1
- 1001 - Concrete Production Equipment and Facilities
- 1002 - Contractor Quality Control for Concrete
- 1003 - Quality Assurance (Acceptance) for Concrete
- 1004 - Portland Cement Concrete Mixtures
- 1005 - Mortar and Grout Mixtures
- 1006 - Patching, Repair, & Overlay Mixtures
- 101 - Terms, Format, and Conditions
- 102.01 Prequalification of Bidders
- 102.02 Contents of Proposal - Progress Clause
- 102.03 Interpretation of Bid Items in the Proposal
- 102.04 Examination of Plans, Specifications, and Work Site
- 102.05 Preparation of Bid Items in the Proposal
- 102.06 Irregular Bids
- 102.07 Delivery of Bid
- 102.08 Withdrawal or Revision of Bid
- 102.09 Downloading of Bids
- 102.10 Bid Review
- 102.11 Bid Rejection
- 102.12 Bid Rejection Appeal
- 102.13 Consideration of Bids
- 102.14 Execution and Award of Contract
- 102.15 Requirements of Contract Bonds
- 102.16 Bid Guaranty Payment
- 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)
- 102.18 - OJT Program
- 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 103.01 Intent of the Contract
- 103.02 Contract Revisions
- 103.03 Contractor Engineer Communication
- 104.01 Authority of the Department
- 104.02 Plans and Working Drawings
- 104.03 Deviations from the Plans
- 104.04 Conformity with the Contrat
- 104.05 Removal of Unauthorized Work
- 104.06 Coordination of Drawing Dimensions and Contract Documentation
- 104.07 Contractor Obligations
- 104.08 Cooperation by the Contractor
- 104.09 Lines, Grades, and Elevations
- 104.10 Claim for Extra Compensation or Extension of Time
- 104.11 Work Zone Safety and Mobility
- 104.12 Approval for Use of the Right of Way
- 105.01 Quality and Scope of Supply
- 105.02 Natural Material Sources Found Within the Excavation Limits
- 105.03 Borrow Materials
- 105.04 Miscellameous Quantities
- 105.05 Approval of Materials Incorporated into the Work
- 105.06 Storage of Materials
- 105.07 Handling and Transporting Materials
- 105.08 Nonconforming Materials
- 105.09 Materials not Incorporated into the Work
- 105.10 Buy America Source of Steel and Iron
- 106 - Quality Assurance Acceptance Program
- 107.01 Laws to be Observed
- 107.02 Permits and Licenses
- 107.03 Patented Process and Materials
- 107.04 Federal Aid Participation
- 107.05 Sanitary Provisions
- 107.06 Furnishing Right-of-Way
- 107.07 Protection and Restoration of Property
- 107.08 Land Monuments and Property Corners
- 107.09 Archeological and Historical Findings
- 107.10 Indemnification, Damage Liability, and Insurance
- 107.11 Contractor's Responsibility for the Work
- 107.12 Contractor's Responsibility for Utility Property and Services
- 107.13 Personal Liability of Public Officials
- 107.14 No Waiver of Legal Rights
- 107.15 Compliance with Laws; Environmental Protection
- 107.16 Forest Protection
- 107.17 Use of Explosives
- 107.18 Work over Navigable Waters
- 107.19 Hauling on Local Roads and Streets
- 107.20 Private Railroad Crossing for Haul Purposes
- 107.21 Open to Traffic
- 108.01 Subcontracting of Contract Work
- 108.02 Limitations of Operations
- 108.03 Competence of Workers
- 108.04 Adequacy of Methods and Equipment
- 108.05 Progress Schedule
- 108.06 Determination of Contract Time for Work Day Contracts
- 108.07 Extension of Time on Work Day Contracts
- 108.08 Extension of Time on Calendar Day Contracts
- 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
- 108.10 Liquidated Damages
- 108.11 Default of Contract
- 108.12 Termination of Contract
- 109.01 Measurement of Quantities
- 109.02 Scope of Payment
- 109.03 Payments for Increased or Decreased Quantities
- 109.04 Progress and Partial Payments
- 109.05 Payment for Contract Revisions
- 109.06 Source of Supply and Carrier Rates on Materials
- 109.07 Final Inspection, Acceptance, and Final Payment
- 109.08 Prompt Payment
- 150 - Mobilization
2
- 201 - Clearing
- 202 - Removing Trees, Stumps, and Corduroy
- 203 - Removing Drainage Structures, Culverts, and Sewers
- 204 - Removing Miscellaneous Structures and Materials
- 205 - Roadway Earthwork
- 206 - Excavation and Backfill for Structures
- 207 - Obliterating Roadway
- 208 - Soil Erosion and Sedimentation Control (NPDES)
- 209 - Project Cleanup
3
4
5
7
- 700 - Closure of Unsafe Structures
- 701 - Portland Cement Concrete for Structures
- 702 - Mortar and Grout
- 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes
- 704 - Steel Sheet Piling and Cofferdams
- 705 - Foundation Piling
- 706 - Structural Concrete
- 707 - Structural Steel
- 708 - Prestressed Concrete
- 709 - Timber Sturctures
- 710 - Waterproofing and Protective Covers
- 711 - Bridge Railings
- 712 - Bridge Rehabilitation, Concrete
- 713 - Bridge Rehabilitation, Steel
- 714 - Temporary Structures and Approaches
- 715 - Cleaning and Coating Existing Structural Steel
- 716 - Shop Cleaning and Coating Structural Steel
- 717 - Downspouts and Drains
- 718 - Drilled Shafts
- 719 - Earth Retaining Structures
8
- 801 - Concrete Driveways
- 802 - Concrete Curb, Gutter, and Dividers
- 803 - Concrete Sidewalk, Ramps, and Steps
- 804 - Concrete Barriers and Glare Screens
- 805 - Hot Mix Asphalt Curb
- 806 - Bicycle Paths
- 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts
- 808 - Fencing
- 809 - Field Office
- 810 - Permanent Traffic Signs and Supports
- 811 - Permanent Pavement Markings
- 812 - Temporary Traffic Control for Construction Zone Operations
- 813 - Slope Protection
- 814 - Paved Ditches
- 815 - Landscaping
- 816 - Turf Establishment
- 817 - Landscape Mowing
- 819 - Electrical and Lighting
- 820 - Traffic Signals
- 821 - Preservation of Land Monuments and Property Corners
- 822 - Ground or Cut Centerline and Shoulder Corrugations
- 823 - Water Mains
- 824 - Contractor Staking
- 825 - Sanitary Sewer Systems
- 826 – Intelligent Transportation Systems
C
- Certified Engineer Process
- Certified Office Technician Process
- Commentary - Special Provision for Quality Control and Acceptance of Portland Cement Concrete 12SP604(B)
- Construction Field Services Indirect Testing Charges
- CONSTRUCTION MANUAL CONTENT TEMPLATE
- Construction Value Engineering Change Proposal (VECP)
- Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects
- Contract Administration and Oversight Guidelines for Projects Containing Warranty Work
- Contractor's Equipment and Traffic Control
D
- Digital Calculations for Payment
- Disadvantaged Business Enterprises (DBE)
- Dispute Review Board (DRB)
- Division 2 Supplemental Information
- Division 3 Supplemental Information
- Division 4 Supplemental Information
- Division 7 Supplemental - Bridge and Bridge Deck Construction Inspection & Documentation
- Division 7 Supplemental - Hydrodemolition and Bridge Deck Overlay Construction Inspection
- Division 7 Supplemental Information