Search results

Jump to navigation Jump to search
  • ==[[#LOCAL AGENCY PROJECTS|'''LOCAL AGENCY PROJECTS''']]== ==[[#RAIL PROJECTS|'''RAIL PROJECTS''']]==
    2 KB (163 words) - 15:53, 2 April 2024
  • ...procedures can result in loss of State and/or Federal-Aid funding for the projects. ...agency, MDOT, and/or their consultant representative including maintenance projects that are let through the MDOT letting system. Certification expiration noti
    2 KB (218 words) - 09:59, 3 April 2024
  • All (MDOT and Local Agency) preconstruction meetings are to be held after award. Preconstruction meeti ...ect Engineer or their representative, sent to all attendees, and placed in projects ProjectWise construction folder in file 107 Preconstruction and Progress Me
    2 KB (320 words) - 11:18, 14 September 2023
  • ...The first full scale data entry was completed in early 2010 for pavement projects constructed during 2009. Feedback discussions were held with most regions, ...ce forces (MDOT and local) on MDOT routes, and permit work. Work on local agency routes is not entered in the PHD system.
    2 KB (253 words) - 09:37, 3 January 2018
  • ...taining_Warranty_Work Contract Administration and Oversight Guidelines for Projects Containing Warranty Work]<br /> ...tion and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects]<br />
    7 KB (921 words) - 15:18, 26 July 2022
  • ...re brief descriptions of quality adjustments commonly used on construction projects. The following pay item codes and descriptions must be used on MDOT let projects. Several of these items will be specified prior to letting when establishi
    9 KB (1,226 words) - 10:05, 2 May 2023
  • ...Per the use statement for this FUSP, this will be applicable for trunkline projects with final completion dates on or after June 5, 2024. ...will continue to utilize the CPE process. This will be applicable to local agency jobs and MDOT jobs with final completion dates before June 5, 2024.
    3 KB (385 words) - 15:22, 26 September 2023
  • ...E_ACCOUNT_GUIDANCE_INCL_FHWA_ORDER_050417_560873_7.pdf LAP Instructions to Local Agencies for Preparing Federal Aid Project to Bid through MDOT] located at ...they should forward their comments to the LAP Staff Engineer and the local agency.
    7 KB (1,055 words) - 11:29, 14 July 2020
  • ...specific, such as certification and verification of materials used in MDOT projects, stockpile testing, and non-project specific testing functions that are req ...ding of local activities is described in the Charging Time to Local Agency Projects section.
    5 KB (701 words) - 08:12, 16 October 2023
  • ...is the responsibility of the local agency to recover utility delay costs. Local agencies should be advised to pursue cost recovery directly from the respec ...ity delays are to be processed on a contract modification with 100 percent local funding.
    9 KB (1,295 words) - 10:58, 4 May 2022
  • ==[[#Railroad Highway Projects|Railroad Highway Projects]]== ...oad companies, or private industry are the basis for most railroad-highway projects.
    12 KB (1,772 words) - 17:35, 14 December 2023
  • ...federal dollars shall comply with these federal regulations. Local agency projects with oversight requirements will need to meet federal regulation for federa ...tematic approach as to how we quantify items used the construction of MDOT projects. Construction forces will quantify units in length, area, volume, and weig
    14 KB (2,089 words) - 09:11, 11 April 2024
  • ...the job being reviewed and should be noted as such. Unique or non-typical projects may require special review consideration to ensure compliance. The use of ...ed if a local agency makes a request, or if MDOT believes the Local Public Agency (LPA) would benefit in understanding documentation requirements. An Interi
    4 KB (556 words) - 15:47, 6 May 2021
  • ::a. Trunkline projects must have copies of letter sent to: ::b. Local Agency Projects must have copies of the letter sent to:
    3 KB (387 words) - 15:48, 6 May 2021
  • ...independent of where the engineer works and will be transferable to other projects, offices, and teams where the engineer oversees the project construction ad ...nd one active project for review that have occurred in the past two years. Projects eligible for engineer certification application must meet the following cri
    10 KB (1,464 words) - 13:56, 29 November 2023
  • ...m (LAP) Projects|MDOT Construction Oversight of Local Agency Program (LAP) Projects]]== ...nd state funding participation. This is accomplished through MDOT’s Local Agency Program.
    30 KB (4,182 words) - 18:40, 13 December 2023
  • ...reservation requirements, in accordance with applicable federal, state and local laws, regulations and rules, including the National Environmental Protectio * Contacting the appropriate law enforcement/medical agency in the case of human remains discovery in compliance with [http://www.legis
    5 KB (738 words) - 13:42, 1 April 2024
  • ...ironmental issues that are commonly associated with construction earthwork projects. There is no comparable section of the standard specifications at this tim ...construction. This requirement also applies to local agencies (for local agency-owned ROW). This requirement applies regardless of how the ROW is owned, i
    9 KB (1,330 words) - 14:21, 23 September 2021
  • ...ngineer in coordinating and understanding the Contractor's work with other projects working within or near the contract limits. * Provides a means to report progress to the travelling public, local communities, government officials, and other stakeholders.
    8 KB (1,206 words) - 14:27, 29 February 2024
  • *Withhold further Federal awards for the project or Local Agency program ...be submitted to the TSC Designated Representative and the Statewide Local Agency Construction Engineer at Construction Field Services.
    13 KB (1,768 words) - 11:05, 13 July 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)