- 16:22, 27 July 2023 diff hist 0 N File:501-Unacceptable side gouging.jpg current
- 16:20, 27 July 2023 diff hist 0 N File:501-Unacceptable measurement.jpg current
- 16:19, 27 July 2023 diff hist +251 501 - Plant Produced Hot Mix Asphalt →Cold-Milled Surface
- 16:19, 27 July 2023 diff hist 0 N File:501-Unacceptable gouging and grooves.jpg current
- 16:16, 27 July 2023 diff hist 0 N File:501-Fine Texture Milling.jpg current
- 16:15, 27 July 2023 diff hist 0 501 - Plant Produced Hot Mix Asphalt →Cold-Milled Surface
- 16:14, 27 July 2023 diff hist +14 501 - Plant Produced Hot Mix Asphalt →Cold-Milled Surface
- 16:13, 27 July 2023 diff hist +4 501 - Plant Produced Hot Mix Asphalt →Cold-Milled Surface
- 16:10, 27 July 2023 diff hist +56 501 - Plant Produced Hot Mix Asphalt →Cold-Milled Surface
- 16:05, 27 July 2023 diff hist 0 N File:501-Stringline Milling.jpg current
- 16:04, 27 July 2023 diff hist +172 501 - Plant Produced Hot Mix Asphalt →Cold-Milled Surface
- 16:03, 27 July 2023 diff hist +92 501 - Plant Produced Hot Mix Asphalt →Cold-Milled Surface
- 16:00, 27 July 2023 diff hist 0 N File:501-Profile Milling.jpg current
- 15:59, 27 July 2023 diff hist 0 N File:501-Concrete cold milling.jpg current
- 09:48, 24 July 2023 diff hist +151 MDOT DENSITY TESTING AND INSPECTION MANUAL
- 13:52, 20 July 2023 diff hist -44 102.01 Prequalification of Bidders
- 13:42, 20 July 2023 diff hist +22 Main Page →Recent Minor Changes
- 13:41, 20 July 2023 diff hist +22 E-Signature
- 13:40, 20 July 2023 diff hist +1 E-Signature
- 13:39, 20 July 2023 diff hist -38 Main Page →Recent Minor Changes
- 17:25, 18 July 2023 diff hist -7 102.19 Evaluation of Contractor Performance and Contract Non-Compliance →1165 Health and Safety Example 2
- 17:24, 18 July 2023 diff hist -65 102.19 Evaluation of Contractor Performance and Contract Non-Compliance →Contractor Performance Evaluation (CPE) for Local Agency Jobs
- 14:09, 18 July 2023 diff hist +22 Main Page →Recent Major Changes
- 14:08, 18 July 2023 diff hist +364 Main Page →Recent Major Changes
- 14:03, 18 July 2023 diff hist +267 Structural Fabrication Quality Manual
- 14:02, 18 July 2023 diff hist -300 Structural Fabrication Quality Manual
- 14:02, 18 July 2023 diff hist 0 Structural Fabrication Quality Manual
- 14:01, 18 July 2023 diff hist 0 Structural Fabrication Quality Manual
- 14:00, 18 July 2023 diff hist +17 Structural Fabrication Quality Manual
- 13:58, 18 July 2023 diff hist +79 Structural Fabrication Quality Manual
- 16:01, 13 July 2023 diff hist +73 Structural Fabrication Quality Manual
- 15:31, 13 July 2023 diff hist +1 109.07 Final Inspection, Acceptance, and Final Payment →Timely Progress Payments to Contractors
- 11:49, 13 July 2023 diff hist -1 Main Page →Recent Minor Changes
- 11:47, 13 July 2023 diff hist +686 Main Page →Recent Minor Changes
- 11:34, 13 July 2023 diff hist +433 Main Page →Recent Minor Changes
- 11:33, 13 July 2023 diff hist +525 Main Page →Recent Major Changes
- 11:30, 13 July 2023 diff hist +381 Main Page →Recent Major Changes
- 11:22, 13 July 2023 diff hist -59 208 - Soil Erosion and Sedimentation Control (NPDES) →Non-Compliance of SESC
- 11:20, 13 July 2023 diff hist -255 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →Construction Guidance
- 11:18, 13 July 2023 diff hist -180 104.07 Contractor Obligations →Equipment Back-Up Warning current
- 11:17, 13 July 2023 diff hist -4 104.07 Contractor Obligations →Workplace Conduct Expectation
- 11:15, 13 July 2023 diff hist +1 104.07 Contractor Obligations →Worker Visibility
- 11:14, 13 July 2023 diff hist -18 104.07 Contractor Obligations →Worker Visibility
- 11:13, 13 July 2023 diff hist +2 104.07 Contractor Obligations →Worker Visibility
- 11:12, 13 July 2023 diff hist -187 104.07 Contractor Obligations →Worker Visibility
- 11:10, 13 July 2023 diff hist +85 104.07 Contractor Obligations →Project & Worksite Safety
- 11:07, 13 July 2023 diff hist -277 FieldManager →Documenting Procedures for Live and Shadow Contracts
- 11:06, 13 July 2023 diff hist -169 Local Agency Program (LAP) →Construction Manual index/links for ‘LAP Project Considerations’
- 11:05, 13 July 2023 diff hist -183 Project Closeout Escalation of Accountability →Potential Closeout Problems with Remedies current
- 11:01, 13 July 2023 diff hist -49 Project Closeout Escalation of Accountability →Resolution of Identified File Deficiencies
- 16:30, 12 July 2023 diff hist +50 Prevailing Wage →Contractor Performance Evaluation (CPE)
- 16:30, 12 July 2023 diff hist +126 Prevailing Wage →Contractor Performance Evaluation (CPE)
- 16:28, 12 July 2023 diff hist -358 Prevailing Wage →Contractor Performance Evaluation (CPE)
- 16:25, 12 July 2023 diff hist -18 102.01 Prequalification of Bidders
- 16:24, 12 July 2023 diff hist +13 102.01 Prequalification of Bidders →Contractor Performance Evaluation (CPE) and 1165 Form for Non-Compliance Transition
- 16:23, 12 July 2023 diff hist +286 102.01 Prequalification of Bidders →Contractor Performance Evaluation (CPE) and 1165 Form for Non-Compliance Transition
- 16:20, 12 July 2023 diff hist -7,302 102.01 Prequalification of Bidders
- 16:19, 12 July 2023 diff hist -22 102.01 Prequalification of Bidders →Contractor Performance Evaluation (CPE) and 1165 form for Non-Compliance Transition
- 16:19, 12 July 2023 diff hist +1,351 102.01 Prequalification of Bidders
- 16:04, 12 July 2023 diff hist +137 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 16:01, 12 July 2023 diff hist -5 102.19 Evaluation of Contractor Performance and Contract Non-Compliance →1165 Contract Compliance Example 1
- 16:00, 12 July 2023 diff hist 0 102.19 Evaluation of Contractor Performance and Contract Non-Compliance →1165 Contract Compliance Example 1
- 15:57, 12 July 2023 diff hist +135 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:54, 12 July 2023 diff hist 0 N File:1165 Example Safety.png current
- 15:53, 12 July 2023 diff hist 0 N File:1165 Example.png current
- 15:48, 12 July 2023 diff hist 0 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:40, 12 July 2023 diff hist +32 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:39, 12 July 2023 diff hist -11 102.19 Evaluation of Contractor Performance and Contract Non-Compliance →LAP Project Considerations
- 15:39, 12 July 2023 diff hist -2,229 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:34, 12 July 2023 diff hist +61 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:33, 12 July 2023 diff hist +83 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:28, 12 July 2023 diff hist +2 102.19 Evaluation of Contractor Performance and Contract Non-Compliance →Non-Compliance: Other
- 15:26, 12 July 2023 diff hist +419 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:23, 12 July 2023 diff hist +94 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:20, 12 July 2023 diff hist 0 102.19 Evaluation of Contractor Performance and Contract Non-Compliance →Notice of Non-Compliance with Contract Requirements for MDOT Trunkline Projects
- 15:19, 12 July 2023 diff hist -22 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:18, 12 July 2023 diff hist +11,238 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:11, 12 July 2023 diff hist +22 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 15:10, 12 July 2023 diff hist +7,974 m 102.01 Prequalification of Bidders Reverted edits by Clarkj25 (talk) to last revision by SchaeferS Tag: Rollback
- 15:09, 12 July 2023 diff hist -8,222 102.01 Prequalification of Bidders Blanked the page Tag: Blanking
- 15:09, 12 July 2023 diff hist +8,222 N 102.19 Evaluation of Contractor Performance and Contract Non-Compliance Created page with "<center><span STYLE="font: 30pt arial;">'''102.01'''</span></center> <center><span STYLE="font: 20pt arial;">102 Bid Submission, Award, and Execution of Contract</span></cente..."
- 09:22, 11 July 2023 diff hist +84 109.04 Progress and Partial Payments →Payment for Delivered Materials current
- 15:51, 10 July 2023 diff hist -2 Main Page →Recent Minor Changes
- 15:50, 10 July 2023 diff hist 0 Main Page →Recent Minor Changes
- 15:47, 10 July 2023 diff hist +435 Main Page →Recent Minor Changes
- 15:45, 10 July 2023 diff hist -1,452 Division 3 Supplemental Information Replaced content with "<center><span STYLE="font: 40pt arial;">'''Division 3 Supplemental Information'''</span></center> No additional content at this time. {{Top}}" Tag: Replaced
- 15:25, 10 July 2023 diff hist +35 Main Page →Recent Minor Changes
- 15:24, 10 July 2023 diff hist +349 Main Page →Recent Minor Changes
- 15:21, 10 July 2023 diff hist -39 Main Page →Recent Minor Changes
- 15:19, 10 July 2023 diff hist -1 102.01 Prequalification of Bidders →Processing of Contractor Performance Evaluations
- 15:18, 10 July 2023 diff hist 0 N File:CPE pic2.png current
- 15:16, 10 July 2023 diff hist +2 102.01 Prequalification of Bidders →Processing of Contractor Performance Evaluations
- 15:16, 10 July 2023 diff hist +247 102.01 Prequalification of Bidders →Processing of Contractor Performance Evaluations
- 15:14, 10 July 2023 diff hist 0 N File:CPE pic1.png current
- 15:09, 10 July 2023 diff hist +412 Main Page →Recent Minor Changes
- 11:00, 10 July 2023 diff hist +1 Main Page →Recent Minor Changes
- 11:00, 10 July 2023 diff hist +314 Main Page →Recent Minor Changes
- 10:45, 10 July 2023 diff hist +74 Prevailing Wage →Wage Rate Interviews
- 10:42, 10 July 2023 diff hist 0 N File:PW approval stamp.png current
- 10:40, 10 July 2023 diff hist +158 E-Signature →Transition to OneSpan
- 10:39, 10 July 2023 diff hist -3 E-Signature →Transition to OneSpan
- 10:38, 10 July 2023 diff hist +470 E-Signature →Transition to OneSpan
- 10:23, 22 June 2023 diff hist -10 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates
- 10:22, 22 June 2023 diff hist -10 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates
- 10:21, 22 June 2023 diff hist +5 109.07 Final Inspection, Acceptance, and Final Payment →LAP Project Considerations
- 10:19, 22 June 2023 diff hist +52 109.07 Final Inspection, Acceptance, and Final Payment →Progress Payment Topics to be discussed at the Pre-Construction Meeting
- 13:03, 21 June 2023 diff hist +4 Certified Engineer Process →Current Certified Engineers
- 13:02, 21 June 2023 diff hist 0 N File:Engineer certification list - JUNE 2023-2.jpg current
- 12:59, 21 June 2023 diff hist 0 N File:Engineer certification list - JUNE 2023-2.pdf current
- 17:31, 6 June 2023 diff hist +18 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch) current
- 17:29, 6 June 2023 diff hist -77 Force Account Work →Equipment
- 15:46, 6 June 2023 diff hist 0 Prevailing Wage →Wage Rate Interviews
- 15:45, 6 June 2023 diff hist -4 Prevailing Wage →Wage Rate Interviews
- 15:44, 6 June 2023 diff hist +123 Prevailing Wage →Wage Rate Interviews
- 15:43, 6 June 2023 diff hist +306 Prevailing Wage →Wage Rate Interviews
- 15:41, 6 June 2023 diff hist 0 N File:Fraud and abuse card.jpg current
- 15:40, 6 June 2023 diff hist 0 N File:Sample Business Card.jpg current
- 15:28, 6 June 2023 diff hist -2 103.02 Contract Revisions →Contract Modification Item Type
- 15:27, 6 June 2023 diff hist +554 103.02 Contract Revisions →Contract Modification Item Type
- 15:22, 6 June 2023 diff hist 0 103.02 Contract Revisions →Contract Modification Item Type
- 15:22, 6 June 2023 diff hist +4 103.02 Contract Revisions →Contract Modification Item Type
- 15:21, 6 June 2023 diff hist -54 103.02 Contract Revisions →Contract Modification Item Type
- 15:20, 6 June 2023 diff hist +117 103.02 Contract Revisions →Contract Modification Item Type
- 15:19, 6 June 2023 diff hist 0 N File:WAUP.png current
- 15:17, 6 June 2023 diff hist +15 103.02 Contract Revisions →Contract Modification Item Type
- 15:16, 6 June 2023 diff hist +17 103.02 Contract Revisions →Contract Modification Item Type
- 15:16, 6 June 2023 diff hist +1 103.02 Contract Revisions →Contract Modification Item Type
- 15:15, 6 June 2023 diff hist -21 103.02 Contract Revisions /* Contract Modification Item Type *
- 15:14, 6 June 2023 diff hist +1,039 103.02 Contract Revisions →Contract Modification Item Type
- 14:03, 6 June 2023 diff hist +23 Materials Quality Assurance Procedures Manual
- 13:35, 6 June 2023 diff hist 0 103.02 Contract Revisions →Contract Modification Item Type
- 13:35, 6 June 2023 diff hist -153 103.02 Contract Revisions →Contract Modification Item Type
- 13:33, 6 June 2023 diff hist +1 103.02 Contract Revisions →Contract Modification Item Type
- 13:33, 6 June 2023 diff hist +113 103.02 Contract Revisions →Contract Modification Item Type
- 13:28, 6 June 2023 diff hist -69 103.02 Contract Revisions →Revisions to the Contract
- 13:26, 6 June 2023 diff hist -4 103.02 Contract Revisions →Revisions to the Contract
- 13:25, 6 June 2023 diff hist +8 103.02 Contract Revisions →Revisions to the Contract
- 13:19, 6 June 2023 diff hist +212 109.05 Payment for Contract Revisions →Negotiated Prices (109.05.C) current
- 10:02, 6 June 2023 diff hist 0 E-Signature →Transition to OneSpan
- 09:58, 6 June 2023 diff hist -3 E-Signature →Transition to OneSpan
- 09:58, 6 June 2023 diff hist +49 E-Signature →Transition to OneSpan
- 09:57, 6 June 2023 diff hist +34 E-Signature →Transition to OneSpan
- 09:57, 6 June 2023 diff hist 0 N File:1165 Signature Process.pdf current
- 09:55, 6 June 2023 diff hist +4 E-Signature →Transition to OneSpan
- 09:55, 6 June 2023 diff hist -3 E-Signature →Transition to OneSpan
- 09:54, 6 June 2023 diff hist +4 E-Signature →Transition to OneSpan
- 09:50, 6 June 2023 diff hist -1 E-Signature →#Transition to OneSpan
- 09:49, 6 June 2023 diff hist -1,746 E-Signature →Please note guidance listed in Construction Manual Inspector’s Daily Report. Note that the text stating (Signature) is legacy text associated with FieldManager and will not/can not be removed. A pdf review stamp is the mandatory review marking for this document. Transition to AASHTOWare Project will negate the need for this instruction as the Department moves away from FieldManager.
- 09:47, 6 June 2023 diff hist +1,985 E-Signature →#Transition to OneSpan
- 09:46, 6 June 2023 diff hist +10 E-Signature →#Transition to OneSpan
- 09:45, 6 June 2023 diff hist +29 E-Signature →#Transition to OneSpan
- 09:44, 6 June 2023 diff hist +145 E-Signature →#Transition to OneSpan
- 09:44, 6 June 2023 diff hist -11 E-Signature →#Transition to OneSpan
- 09:43, 6 June 2023 diff hist +3,100 E-Signature →Guidance for Non-MDOT Users
- 16:05, 1 June 2023 diff hist 0 Certified Engineer Process →Current Certified Engineers
- 16:04, 1 June 2023 diff hist 0 N File:Engineer certification list - JUNE 2023.jpg current
- 16:01, 1 June 2023 diff hist 0 Certified Engineer Process
- 15:57, 1 June 2023 diff hist 0 Certified Engineer Process →Current Certified Engineers
- 15:56, 1 June 2023 diff hist -2 Certified Engineer Process →Current Certified Engineers
- 15:55, 1 June 2023 diff hist -1 Certified Engineer Process →Current Certified Engineers
- 15:54, 1 June 2023 diff hist 0 N File:Engineer certification list - JUNE 2023.pdf current
- 15:46, 1 June 2023 diff hist +1 FieldManager →FieldManager
- 15:45, 1 June 2023 diff hist 0 FieldManager →Documenting Procedures for Live and Shadow Contracts
- 15:44, 1 June 2023 diff hist +1 FieldManager →MDOT Read-Only Files for Consultant Contracts
- 15:43, 1 June 2023 diff hist +1 FieldManager →Inspector's Daily Report (IDR)
- 08:45, 24 May 2023 diff hist +1 Main Page →Recent Major Changes
- 08:44, 24 May 2023 diff hist +212 Main Page →Recent Major Changes
- 08:36, 24 May 2023 diff hist +5 Prevailing Wage →Jobsite Postings
- 08:36, 24 May 2023 diff hist +8 Prevailing Wage →Jobsite Postings
- 08:35, 24 May 2023 diff hist +5 Prevailing Wage →Jobsite Postings
- 08:35, 24 May 2023 diff hist +8 Prevailing Wage →Jobsite Postings
- 08:35, 24 May 2023 diff hist +15 Prevailing Wage →Jobsite Postings
- 08:34, 24 May 2023 diff hist -1 Prevailing Wage →Jobsite Postings
- 08:34, 24 May 2023 diff hist 0 N File:107.01 - Jobsite Post Fig 1.png current
- 08:33, 24 May 2023 diff hist 0 Prevailing Wage →Jobsite Postings
- 08:33, 24 May 2023 diff hist 0 N File:107.01 - Jobsite Post Fig 2B.png current
- 08:31, 24 May 2023 diff hist 0 File:107.01 - Jobsite Post Fig 2.png Clarkj25 uploaded a new version of File:107.01 - Jobsite Post Fig 2.png current
- 08:28, 24 May 2023 diff hist 0 N File:107.01 - Jobsite Post Fig 2.png
- 08:27, 24 May 2023 diff hist +4 Prevailing Wage →Jobsite Postings
- 08:27, 24 May 2023 diff hist +3 Prevailing Wage →Jobsite Postings
- 08:27, 24 May 2023 diff hist +2 Prevailing Wage →Jobsite Postings
- 08:26, 24 May 2023 diff hist -1 Prevailing Wage →Jobsite Postings
- 08:26, 24 May 2023 diff hist 0 N File:107.01 - Jobsite Post Fig 3.png current
- 08:21, 24 May 2023 diff hist 0 N File:107.01 - Jobsite Post Fig. 3.png current
- 11:59, 22 May 2023 diff hist +278 107.06 Furnishing Right-of-Way current
- 16:50, 18 May 2023 diff hist -2 Main Page →Recent Major Changes
- 16:50, 18 May 2023 diff hist -7 Main Page →Recent Major Changes
- 16:49, 18 May 2023 diff hist -67 Main Page →Recent Major Changes
- 16:46, 18 May 2023 diff hist +427 Main Page →Recent Major Changes
- 16:44, 18 May 2023 diff hist +116 107.06 Furnishing Right-of-Way
- 16:43, 18 May 2023 diff hist +140 107.06 Furnishing Right-of-Way →DOCUMENTING PRICE NEGOTIATIONS
- 16:42, 18 May 2023 diff hist +3,212 107.06 Furnishing Right-of-Way
- 13:06, 17 May 2023 diff hist +109 205 - Roadway Earthwork →Controlled Density Method
- 13:03, 17 May 2023 diff hist +148 N Density Training Videos Created page with " [https://f.io/5DDMalFG In-Place Density Test] [https://f.io/jHIqBv4H Michigan One-Point Cone Test] [https://f.io/l_VzUeaV One-Point T99 Test]" current
- 11:00, 17 May 2023 diff hist -1 Force Account Work →FORCE ACCOUNT WORK
- 10:59, 17 May 2023 diff hist +75 Force Account Work →FORCE ACCOUNT WORK
- 10:57, 17 May 2023 diff hist +273 Force Account Work →FORCE ACCOUNT WORK
- 10:49, 17 May 2023 diff hist 0 103.02 Contract Revisions →Revisions to the Contract
- 10:48, 17 May 2023 diff hist +10 103.02 Contract Revisions →Revisions to the Contract
- 10:47, 17 May 2023 diff hist +196 103.02 Contract Revisions →Revisions to the Contract
- 09:34, 16 May 2023 diff hist +427 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 23:38, 10 May 2023 diff hist +175 204 - Removing Miscellaneous Structures and Materials →Vertical Exploratory Investigation for Relocation
- 23:37, 10 May 2023 diff hist -6 204 - Removing Miscellaneous Structures and Materials →Vertical Exploratory Investigation for Relocation
- 23:35, 10 May 2023 diff hist +1,397 204 - Removing Miscellaneous Structures and Materials →CONSTRUCTION
- 13:11, 10 May 2023 diff hist -338 109.07 Final Inspection, Acceptance, and Final Payment →Compliance
- 10:05, 2 May 2023 diff hist +41 Quality Initiatives and Adjustments →Traf Control Quality and Compliance Adjustment current
- 10:02, 2 May 2023 diff hist +48 Quality Initiatives and Adjustments →Open Graded Drainage Course Adjustment
- 09:59, 2 May 2023 diff hist +66 Quality Initiatives and Adjustments →Soil Erosion and Sedimentation Control Adjustment
- 09:56, 2 May 2023 diff hist +18 Quality Initiatives and Adjustments →Jobsite Poster Compliance Adjustment
- 11:46, 25 April 2023 diff hist 0 715 - Cleaning and Coating Existing Structural Steel →Warranty on Bridge Coating current
- 11:44, 25 April 2023 diff hist +33 715 - Cleaning and Coating Existing Structural Steel →Lead Awareness Training
- 11:40, 25 April 2023 diff hist -211 718 - Drilled Shafts →Concrete, Grade S2, and Grade T current
- 11:34, 25 April 2023 diff hist +71 208 - Soil Erosion and Sedimentation Control (NPDES) →Non-Compliance of SESC
- 11:17, 25 April 2023 diff hist +376 105.01 Quality and Scope of Supply
- 11:10, 25 April 2023 diff hist +1 105.01 Quality and Scope of Supply
- 11:09, 25 April 2023 diff hist -4 105.01 Quality and Scope of Supply
- 11:08, 25 April 2023 diff hist -301 107.12 Contractor's Responsibility for Utility Property and Services →MDOT Freeway Lighting and ITS Staking Request current
- 11:03, 25 April 2023 diff hist 0 109.08 Prompt Payment →Prompt Payment current
- 11:01, 25 April 2023 diff hist -141 819 - Electrical and Lighting →Electrical and Lighting Conduit
- 10:52, 25 April 2023 diff hist +75 102.02 Contents of Proposal - Progress Clause →Progress Clause
- 10:49, 25 April 2023 diff hist +51 102.02 Contents of Proposal - Progress Clause →Progress Clause
- 10:15, 24 April 2023 diff hist +205 105.10 Buy America Source of Steel and Iron
- 10:12, 24 April 2023 diff hist -3 105.10 Buy America Source of Steel and Iron
- 10:11, 24 April 2023 diff hist -84 105.10 Buy America Source of Steel and Iron
- 16:17, 18 April 2023 diff hist +333 Main Page →Recent Major Changes
- 15:45, 18 April 2023 diff hist -1 208 - Soil Erosion and Sedimentation Control (NPDES) →CONSTRUCTION
- 15:42, 18 April 2023 diff hist 0 208 - Soil Erosion and Sedimentation Control (NPDES) →CONSTRUCTION
- 15:41, 18 April 2023 diff hist +328 208 - Soil Erosion and Sedimentation Control (NPDES) →CONSTRUCTION
- 15:36, 18 April 2023 diff hist 0 N File:SESC Pocket Guide.png current
- 15:33, 18 April 2023 diff hist +296 208 - Soil Erosion and Sedimentation Control (NPDES) →CONSTRUCTION
- 15:32, 18 April 2023 diff hist +90 208 - Soil Erosion and Sedimentation Control (NPDES) →CONSTRUCTION
- 15:27, 18 April 2023 diff hist -1 Main Page →Recent Major Changes
- 15:27, 18 April 2023 diff hist 0 Main Page →Recent Major Changes
- 15:26, 18 April 2023 diff hist +293 Main Page →Recent Major Changes
- 15:20, 18 April 2023 diff hist +2 FieldManager →Inspector's Daily Report (IDR)
- 15:19, 18 April 2023 diff hist +210 FieldManager →Inspector's Daily Report (IDR)
- 13:51, 18 April 2023 diff hist -19 FieldManager →Inspector's Daily Report (IDR)
- 13:45, 18 April 2023 diff hist -17 FieldManager →Inspector's Daily Report (IDR)
- 13:42, 18 April 2023 diff hist -20 FieldManager →Bi-Annual FieldManager User Account Verification Process
- 13:37, 18 April 2023 diff hist +15 FieldManager →Inspector's Daily Report (IDR)
- 13:32, 18 April 2023 diff hist +13 FieldManager →Inspector's Daily Report (IDR)
- 13:29, 18 April 2023 diff hist 0 N File:IDR3.png current
- 13:29, 18 April 2023 diff hist 0 N File:IDR2.png current
- 13:29, 18 April 2023 diff hist 0 N File:IDR1.png current
- 09:35, 18 April 2023 diff hist +155 FieldManager →Inspector's Daily Report (IDR)
- 09:27, 18 April 2023 diff hist +1 FieldManager →Inspector's Daily Report (IDR)
- 09:27, 18 April 2023 diff hist 0 N File:Figure 101.04-1 stamp example2.png current
- 09:25, 18 April 2023 diff hist 0 FieldManager →Inspector's Daily Report (IDR)
- 09:25, 18 April 2023 diff hist 0 File:Figure 101.04-1 stamp example.png Clarkj25 uploaded a new version of File:Figure 101.04-1 stamp example.png current
- 09:23, 18 April 2023 diff hist +87 FieldManager →Inspector's Daily Report (IDR)
- 09:21, 18 April 2023 diff hist 0 N File:Figure 101.04-1 stamp example.png
- 09:01, 18 April 2023 diff hist -4 FieldManager →Inspector's Daily Report (IDR)
- 08:59, 18 April 2023 diff hist 0 N File:Figure 101.04-1cont stamp.png current
- 08:55, 18 April 2023 diff hist 0 File:Figure 101.04-1cont E-Signed.png Clarkj25 uploaded a new version of File:Figure 101.04-1cont E-Signed.png current
- 08:52, 18 April 2023 diff hist 0 File:Figure 101.04-1cont E-Signed.png Clarkj25 uploaded a new version of File:Figure 101.04-1cont E-Signed.png
- 08:47, 18 April 2023 diff hist 0 File:Figure 101.04-1cont E-Signed.png Clarkj25 uploaded a new version of File:Figure 101.04-1cont E-Signed.png
- 16:27, 13 April 2023 diff hist -197 Certified Engineer Process →Certified Engineer Application Requirements
- 09:03, 13 April 2023 diff hist +59 Certified Engineer Process →Certified Engineer Application Requirements
- 17:29, 10 April 2023 diff hist -74 713 - Bridge Rehabilitation, Steel →Column Type current
- 17:28, 10 April 2023 diff hist +31 713 - Bridge Rehabilitation, Steel →Column Type
- 15:50, 6 April 2023 diff hist -362 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts →Routing of Form 1100A current
- 09:24, 6 April 2023 diff hist -31 205 - Roadway Earthwork →Controlled Density Method
- 09:23, 6 April 2023 diff hist +166 205 - Roadway Earthwork →Controlled Density Method
- 11:42, 5 April 2023 diff hist +87 Force Account Work →Guidelines to submit Force Account Work – Contractor’s Field Documentation
- 11:38, 5 April 2023 diff hist +35 Force Account Work →FORCE ACCOUNT WORK
- 11:37, 5 April 2023 diff hist -848 109.05 Payment for Contract Revisions
- 11:31, 5 April 2023 diff hist -40,984 109.05 Payment for Contract Revisions →FORCE ACCOUNT WORK
- 11:27, 5 April 2023 diff hist +35 109.05 Payment for Contract Revisions →FORCE ACCOUNT WORK
- 11:05, 5 April 2023 diff hist +125 Prevailing Wage →Jobsite Postings
- 09:18, 4 April 2023 diff hist +2 Prevailing Wage →Additional Information
- 14:09, 3 April 2023 diff hist +5 FieldManager →FieldManager
- 14:07, 3 April 2023 diff hist 0 Prevailing Wage →Multiple Wage Decisions
- 08:52, 3 April 2023 diff hist +48 Final Project Review →Final Project Review Package
- 08:49, 3 April 2023 diff hist +30 Final Project Review →Review Findings
- 08:46, 3 April 2023 diff hist -9 Final Project Review →Materials Review
- 08:45, 3 April 2023 diff hist +4 Final Project Review →Review Teams
- 11:44, 29 March 2023 diff hist -722 812 - Temporary Traffic Control for Construction Zone Operations →CONSTRUCTION current
- 11:36, 29 March 2023 diff hist +1 208 - Soil Erosion and Sedimentation Control (NPDES) →Contractor Obligation
- 10:25, 29 March 2023 diff hist 0 File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx current
- 10:24, 29 March 2023 diff hist 0 File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx current
- 12:21, 28 March 2023 diff hist +87 204 - Removing Miscellaneous Structures and Materials →CONSTRUCTION
- 12:07, 28 March 2023 diff hist +96 203 - Removing Drainage Structures, Culverts, and Sewers →CONSTRUCTION
- 12:05, 28 March 2023 diff hist +204 202 - Removing Trees, Stumps, and Corduroy →MEASUREMENT AND PAYMENT
- 12:01, 28 March 2023 diff hist +204 201 - Clearing →CONSTRUCTION current
- 11:59, 28 March 2023 diff hist +247 201 - Clearing →GENERAL
- 11:52, 28 March 2023 diff hist +182 201 - Clearing →GENERAL
- 10:04, 28 March 2023 diff hist 0 File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 10:03, 28 March 2023 diff hist 0 File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 17:08, 27 March 2023 diff hist +117 815 - Landscaping →GENERAL current
- 17:05, 27 March 2023 diff hist 0 815 - Landscaping →Unacceptable Plants
- 17:03, 27 March 2023 diff hist +33 815 - Landscaping →CONSTRUCTION
- 16:48, 27 March 2023 diff hist +66 815 - Landscaping →Unacceptable Plants
- 14:07, 23 March 2023 diff hist +79 109.05 Payment for Contract Revisions →Statements
- 17:17, 22 March 2023 diff hist -9 Certified Engineer Process →Current Certified Engineers
- 17:16, 22 March 2023 diff hist 0 N File:Engineer certification list - MARCH 2023.jpg current
- 17:11, 22 March 2023 diff hist 0 N File:Engineer certification list - MARCH 2023.pdf current
- 16:02, 20 March 2023 diff hist -9 Prevailing Wage →Additional Information
- 16:01, 20 March 2023 diff hist 0 N File:107.01 Laws to be Observed - MDOT Deficient-Notice-1.docx current
- 14:44, 20 March 2023 diff hist +364 Main Page →Recent Major Changes
- 14:39, 20 March 2023 diff hist -14 E-Signature →Guidance for Non-MDOT Users
- 14:38, 20 March 2023 diff hist +59 E-Signature →Guidance for Non-MDOT Users
- 14:38, 20 March 2023 diff hist -327 E-Signature →Guidance for Non-MDOT Users
- 14:35, 20 March 2023 diff hist -1,855 E-Signature →Adoption at MDOT and Acceptable Uses
- 14:17, 20 March 2023 diff hist +1 Main Page →Recent Major Changes
- 14:16, 20 March 2023 diff hist +286 Main Page →Recent Major Changes
- 14:13, 20 March 2023 diff hist +20 Preconstruction Meeting →Trunkline Boilerplate Preconstruction Meeting Minutes
- 14:13, 20 March 2023 diff hist 0 N File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 14:12, 20 March 2023 diff hist +11 Preconstruction Meeting →LAP Project Considerations
- 14:11, 20 March 2023 diff hist 0 N File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 13:10, 20 March 2023 diff hist -99 Prevailing Wage →Additional Information
- 13:04, 20 March 2023 diff hist -8 Prevailing Wage →Additional Information
- 12:58, 20 March 2023 diff hist +152 Prevailing Wage →Additional Information
- 15:59, 15 March 2023 diff hist -79 MDOT Construction Manual Content Revision Procedures →Construction Manual Change Process
- 15:32, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 15:31, 15 March 2023 diff hist 0 N File:2023 ACEC Presentation - Contract Mods2.pdf current
- 13:04, 15 March 2023 diff hist +52 Final Project Review →Further Information on Final Project Review
- 11:41, 15 March 2023 diff hist 0 N File:2023 ACEC Presentation - File Reviews.pdf current
- 11:09, 15 March 2023 diff hist +209 Final Project Review →FAQs for Final Project Review
- 09:34, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 09:31, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 09:28, 15 March 2023 diff hist +7 103.02 Contract Revisions →General Contract Modification Information
- 09:27, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 09:27, 15 March 2023 diff hist +48 103.02 Contract Revisions →General Contract Modification Information
- 09:24, 15 March 2023 diff hist -2 103.02 Contract Revisions →General Contract Modification Information
- 09:23, 15 March 2023 diff hist +48 103.02 Contract Revisions →General Contract Modification Information
- 09:21, 15 March 2023 diff hist +199 103.02 Contract Revisions →Generating Contract Modifications
- 09:17, 15 March 2023 diff hist 0 N File:2023 ACEC Presentation - Contract Mods.pdf current
- 16:02, 8 March 2023 diff hist -15 Dev Page →Recent Minor Changes current
- 10:02, 8 March 2023 diff hist +462 Main Page →Recent Major Changes
- 09:54, 8 March 2023 diff hist -7,588 108.07 Extension of Time on Work Day Contracts Replaced content with "<span style=color:red>There is no further content, see Spec Book and 108.09_Request_for_Time_Extensions_on_Work_Day,_Calendar_Day,_and_Calendar_Date_Contracts.</span>..." current Tag: Replaced
- 09:52, 8 March 2023 diff hist +98 108.08 Extension of Time on Calendar Day Contracts current
- 09:49, 8 March 2023 diff hist +77 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts →LAP Project Considerations
- 09:48, 8 March 2023 diff hist +7,729 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
- 09:39, 8 March 2023 diff hist +8 Main Page →Recent Minor Changes
- 09:39, 8 March 2023 diff hist +360 Main Page →Recent Minor Changes
- 09:32, 8 March 2023 diff hist 0 104.10 Claim for Extra Compensation or Extension of Time →General
- 13:59, 7 March 2023 diff hist -11 Main Page →Recent Minor Changes
- 13:59, 7 March 2023 diff hist +397 Main Page →Recent Minor Changes
- 13:51, 7 March 2023 diff hist +3 m 103.02 Contract Revisions →Contract Revisions - See Also
- 13:50, 7 March 2023 diff hist 0 N File:Appendix A - Approval Path Flow Chart UPDATED 3-7-23 Final.pdf current
- 17:10, 2 March 2023 diff hist -726 108.07 Extension of Time on Work Day Contracts →Routing of Form 1100A
- 09:42, 1 March 2023 diff hist +5 103.02 Contract Revisions →Contract Revisions - See Also
- 09:41, 1 March 2023 diff hist 0 N File:Appendix A - Approval Path Flow Chart UPDATED 2022 ver2.pdf current
- 09:36, 1 March 2023 diff hist 0 N File:Appendix A-2023.jpg current
- 11:44, 16 February 2023 diff hist +25 103.02 Contract Revisions →Contract Revisions - See Also
- 11:42, 16 February 2023 diff hist 0 N File:Appendix A - Approval Path Flow Chart UPDATED 2022.pdf current
- 18:32, 23 January 2023 diff hist 0 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 18:30, 23 January 2023 diff hist 0 N File:MI S&O RPI S O Plan Mound INFRA Zachary 2023.pdf current
- 18:24, 23 January 2023 diff hist -4 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 18:23, 23 January 2023 diff hist 0 N File:FHWA RBPI 2023.jpg current
- 18:19, 23 January 2023 diff hist +149 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:15, 12 January 2023 diff hist +476 Main Page
- 09:29, 12 December 2022 diff hist +377 107.09 Archeological and Historical Findings
- 14:15, 5 December 2022 diff hist -33 Certified Engineer Process →Certified Engineer Renewal Process
- 14:14, 5 December 2022 diff hist -1 Certified Engineer Process →Certified Engineer Review Audits
- 14:14, 5 December 2022 diff hist -32 Certified Engineer Process →Certified Engineer Application Requirements
- 14:13, 5 December 2022 diff hist +2 Certified Engineer Process →Certified Engineer Renewal Process
- 14:12, 5 December 2022 diff hist +83 Certified Engineer Process →Certified Engineer Application Requirements
- 14:11, 5 December 2022 diff hist +15 Certified Engineer Process →Certified Engineer Application Requirements
- 14:09, 5 December 2022 diff hist +17 Certified Engineer Process →Certified Engineer Application Requirements
- 16:51, 23 November 2022 diff hist -58 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 10:47, 22 November 2022 diff hist -226 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:32, 10 November 2022 diff hist +363 Main Page →Recent Minor Changes
- 13:25, 10 November 2022 diff hist +704 109.05 Payment for Contract Revisions →Labor
- 12:51, 2 November 2022 diff hist +22 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 12:47, 2 November 2022 diff hist +4 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 12:47, 2 November 2022 diff hist +11 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 12:46, 2 November 2022 diff hist -2 Force Account Work
- 12:44, 2 November 2022 diff hist +1 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 12:42, 2 November 2022 diff hist +135 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 12:40, 2 November 2022 diff hist 0 N File:CFS Blue Book.jpg current
- 17:30, 13 October 2022 diff hist +533 Prevailing Wage →LCPtracker
- 14:02, 11 October 2022 diff hist +347 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:59, 11 October 2022 diff hist 0 N File:PW Folder All RBPI.jpg current
- 13:50, 11 October 2022 diff hist +348 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:46, 11 October 2022 diff hist 0 N File:JN 128908 Bay (Lafayette Bascule) - RBPI S&O Plan.pdf current
- 13:46, 11 October 2022 diff hist 0 N File:FHWA RBPI Actions.jpg current
- 13:43, 11 October 2022 diff hist -46 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:42, 11 October 2022 diff hist 0 N File:PW Folder.jpg current
- 10:56, 5 October 2022 diff hist +397 Main Page →Recent Minor Changes
- 10:52, 5 October 2022 diff hist -650 811 - Permanent Pavement Markings →Uniform Price Adjustment, Regular Dry Paint and Low Temperature Waterborne Paint
- 10:50, 5 October 2022 diff hist +216 m 811 - Permanent Pavement Markings →MEASUREMENT AND PAYMENT
- 15:12, 3 October 2022 diff hist -40 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →Disadvantaged Business Enterprise (DBE) Participation as Regular Dealers of Liquid Asphalt
- 09:54, 26 September 2022 diff hist +250 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 09:53, 26 September 2022 diff hist +53 N File:00 Michigan Risk Based Project Involvement Guidance September 2021 FINAL.pdf FHWA Michigan Division Guidance on RBPI current
- 14:28, 7 September 2022 diff hist +202 109.07 Final Inspection, Acceptance, and Final Payment →Final Marked Plans
- 10:00, 30 August 2022 diff hist -43 FieldManager →MDOT Read-Only Files for Consultant Contracts
- 09:59, 30 August 2022 diff hist +40 FieldManager →Inspector's Daily Report (IDR)
- 09:58, 30 August 2022 diff hist +35 FieldManager →FieldManager
- 09:57, 30 August 2022 diff hist +38 FieldManager →FieldManager
- 09:54, 30 August 2022 diff hist +41 Main Page →AASHTOWare Project Construction & Materials Software Manual
- 09:53, 30 August 2022 diff hist +48 Main Page →AASHTOWare Project Construction & Materials Software Manual
- 09:49, 30 August 2022 diff hist +84 Main Page →AASHTOWare Project Construction & Materials Software Manual
- 12:26, 22 August 2022 diff hist 0 Help:Contents →Sign Up for Updates current
- 09:14, 17 August 2022 diff hist +29 Local Agency Program (LAP) →Construction Engineering Requirements
- 09:11, 17 August 2022 diff hist +14 Local Agency Program (LAP) →Construction Engineering Requirements
- 14:53, 16 August 2022 diff hist +352 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 14:44, 16 August 2022 diff hist +302 104.10 Claim for Extra Compensation or Extension of Time →General
- 15:15, 2 August 2022 diff hist +184 Construction Value Engineering Change Proposal (VECP)
- 15:08, 2 August 2022 diff hist -3,761 103.02 Contract Revisions
- 14:57, 2 August 2022 diff hist -3,397 103.02 Contract Revisions
- 14:52, 2 August 2022 diff hist +6,179 103.02 Contract Revisions
- 14:41, 2 August 2022 diff hist +3 103.02 Contract Revisions →Construction Contract Modification Process Overview
- 14:36, 2 August 2022 diff hist +151 103.02 Contract Revisions →Revisions to the Contract
- 14:26, 2 August 2022 diff hist +180 103.02 Contract Revisions →Construction Contract Modification Process Overview
- 14:22, 2 August 2022 diff hist -167 103.02 Contract Revisions →LAP Project Considerations
- 14:15, 2 August 2022 diff hist -141 103.02 Contract Revisions →FHWA Approval
- 14:14, 2 August 2022 diff hist -4,448 103.02 Contract Revisions →Requirements for FHWA Review on Projects of Division Interest (PoDI)
- 14:13, 2 August 2022 diff hist +554 N FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) Created page with "FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) Various Federal Highway Administration (FHWA) involvement activities may be necessary..."
- 14:09, 2 August 2022 diff hist +2,904 103.02 Contract Revisions →Revisions to the Contract
- 13:58, 2 August 2022 diff hist +14 103.02 Contract Revisions →Construction Contract Modification Process Overview
- 13:57, 2 August 2022 diff hist +760 103.02 Contract Revisions →Construction Contract Modification Process Overview
- 10:17, 27 July 2022 diff hist +82 811 - Permanent Pavement Markings
- 10:14, 27 July 2022 diff hist +82 811 - Permanent Pavement Markings →Moisture Test
- 10:13, 27 July 2022 diff hist +238 811 - Permanent Pavement Markings →Binder and Bead Plate Sample
- 10:12, 27 July 2022 diff hist +165 811 - Permanent Pavement Markings →Field Inspection Checklist
- 10:11, 27 July 2022 diff hist +160 811 - Permanent Pavement Markings →Pavement Marking Inspection Frequently Asked Questions
- 10:10, 27 July 2022 diff hist +164 811 - Permanent Pavement Markings →Construction Guidance for Pavement Marking Projects
- 10:01, 27 July 2022 diff hist +548 108.10 Liquidated Damages current
- 09:57, 27 July 2022 diff hist +76 108.10 Liquidated Damages
- 09:52, 27 July 2022 diff hist -22 108.10 Liquidated Damages
- 13:51, 26 July 2022 diff hist +56 108.05 Progress Schedule →Progress Schedule
- 13:39, 26 July 2022 diff hist +64 Materials Quality Assurance Procedures Manual →2019 Summary of Revisions to the MQAP
- 13:38, 26 July 2022 diff hist +65 Materials Quality Assurance Procedures Manual →2019 Summary of Revisions to the MQAP
- 13:37, 26 July 2022 diff hist -5 Materials Quality Assurance Procedures Manual →2021 Summary of Revisions to the MQAP
- 13:35, 26 July 2022 diff hist -9 Digital Calculations for Payment →Digital Calculations for Payment
- 13:22, 26 July 2022 diff hist -5 103.02 Contract Revisions →Construction Contract Modification Process Overview
- 13:22, 26 July 2022 diff hist -5 707 - Structural Steel →Additional Specifications current
- 13:21, 26 July 2022 diff hist -10 Section 601 - Portland Cement Concrete for Pavements current
- 13:21, 26 July 2022 diff hist -27 Dev Page →Preamble
- 13:20, 26 July 2022 diff hist -4 109.05 Payment for Contract Revisions →Subcontracting or Hiring Services by Others
- 13:20, 26 July 2022 diff hist -4 109.05 Payment for Contract Revisions →Equipment not listed on Blue Book (EquipmentWatch)
- 13:20, 26 July 2022 diff hist -5 109.05 Payment for Contract Revisions →Equipment listed in the Blue Book (EquipmentWatch)
- 13:19, 26 July 2022 diff hist -5 109.05 Payment for Contract Revisions →FORCE ACCOUNT WORK
- 13:18, 26 July 2022 diff hist -4 Force Account Work →Subcontracting or Hiring Services by Others
- 13:18, 26 July 2022 diff hist -4 Force Account Work →Equipment not listed on Blue Book (EquipmentWatch)
- 13:18, 26 July 2022 diff hist -5 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 13:17, 26 July 2022 diff hist -5 Force Account Work →FORCE ACCOUNT WORK
- 13:16, 26 July 2022 diff hist -10 811 - Permanent Pavement Markings →Field Inspection Checklist
- 13:16, 26 July 2022 diff hist -5 811 - Permanent Pavement Markings →Binder and Bead Plate Sample
- 13:15, 26 July 2022 diff hist -6 811 - Permanent Pavement Markings →Recertification after Revocation
- 13:15, 26 July 2022 diff hist -6 811 - Permanent Pavement Markings →Step 3
- 13:15, 26 July 2022 diff hist -5 811 - Permanent Pavement Markings →Equipment Certification Guidelines
- 13:14, 26 July 2022 diff hist -10 Local Agency Program (LAP) →Local Agency Cost Reimbursement for Liquidated Damages
- 13:13, 26 July 2022 diff hist +12 Final Project Review →Review Findings
- 13:12, 26 July 2022 diff hist -4 816 - Turf Establishment →Use of Soluble and Insoluble Fertilizers current
- 13:11, 26 July 2022 diff hist -10 Section 701 - Portland Cement Concrete for Structures current
- 14:04, 25 July 2022 diff hist +21 104.10 Claim for Extra Compensation or Extension of Time
- 11:32, 21 July 2022 diff hist 0 Disadvantaged Business Enterprises (DBE) →Questions
- 11:31, 21 July 2022 diff hist -1 Construction Value Engineering Change Proposal (VECP)
- 11:30, 21 July 2022 diff hist 0 Disadvantaged Business Enterprises (DBE) →Questions
- 13:29, 17 May 2022 diff hist +15 Main Page →Current News
- 13:24, 17 May 2022 diff hist -292 Main Page →Current News
- 13:21, 17 May 2022 diff hist +68 Main Page →Current News
- 13:19, 17 May 2022 diff hist +131 Main Page →New FieldManager Helpdesk Number
- 10:58, 4 May 2022 diff hist +201 Project Delays Due to a Utility Company current
- 15:35, 11 April 2022 diff hist +17 Notice of Non-Compliance with Contract Requirements
- 15:33, 11 April 2022 diff hist 0 Notice of Non-Compliance with Contract Requirements
- 13:05, 7 April 2022 diff hist -80 m Main Page
- 14:04, 23 March 2022 diff hist +1 E-Signature →Adoption at MDOT and Acceptable Uses
- 14:04, 23 March 2022 diff hist +231 E-Signature →Guidance for Non-MDOT Users
- 13:57, 23 March 2022 diff hist +67 E-Signature
- 13:55, 23 March 2022 diff hist +379 E-Signature
- 10:17, 16 March 2022 diff hist +304 m Main Page →Recent Major Changes
- 12:33, 14 March 2022 diff hist 0 Holiday Traffic Safety Provisions current
- 12:27, 14 March 2022 diff hist -3 Holiday Traffic Safety Provisions
- 12:08, 14 March 2022 diff hist 0 Holiday Traffic Safety Provisions
- 12:03, 14 March 2022 diff hist 0 Holiday Traffic Safety Provisions
- 12:02, 14 March 2022 diff hist +1,270 Holiday Traffic Safety Provisions
- 11:29, 10 March 2022 diff hist -51 Holiday Traffic Safety Provisions
- 11:27, 10 March 2022 diff hist -1,520 m Holiday Traffic Safety Provisions
- 17:13, 14 February 2022 diff hist +21 m 208 - Soil Erosion and Sedimentation Control (NPDES) minor edit change MDOT to Construction engineer */
- 12:36, 13 January 2022 diff hist +10 N Category:Division 5 Created page with "Division 5"
- 11:46, 21 December 2021 diff hist +6 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 11:45, 21 December 2021 diff hist -23 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 11:43, 21 December 2021 diff hist +112 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 11:41, 21 December 2021 diff hist +41 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 11:32, 21 December 2021 diff hist +139 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 11:29, 21 December 2021 diff hist +41 107.09 Archeological and Historical Findings →ARCHEOLOGICAL AND HISTORICAL FINDINGS
- 15:04, 14 December 2021 diff hist -146 208 - Soil Erosion and Sedimentation Control (NPDES)
- 17:13, 30 November 2021 diff hist -1 208 - Soil Erosion and Sedimentation Control (NPDES) →Sediment Discharge into Waters of the State of Michigan
- 11:27, 26 October 2021 diff hist -43 105.10 Buy America Source of Steel and Iron
- 11:26, 26 October 2021 diff hist +83 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →Disadvantaged Business Enterprise (DBE) Participation as Regular Dealers of Liquid Asphalt
- 11:24, 26 October 2021 diff hist +81 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →Disadvantaged Business Enterprise (DBE) Participation as Regular Dealers of Liquid Asphalt
- 11:23, 26 October 2021 diff hist +83 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →Prompt Payment
- 11:21, 26 October 2021 diff hist -21 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)
- 11:20, 26 October 2021 diff hist +79 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →DISADVANTAGED BUSINESS ENTERPRISES (DBE’s)
- 11:19, 26 October 2021 diff hist +101 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →DBE Commercially Useful Function (CUF) Requirements
- 11:17, 26 October 2021 diff hist +80 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →SUBLETTING CONTRACT WORK TO DISADVANTAGED BUSINESS ENTERPRISES (DBE)
- 11:15, 26 October 2021 diff hist +74 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →SUBLETTING CONTRACT WORK TO DISADVANTAGED BUSINESS ENTERPRISES (DBE)
- 11:13, 26 October 2021 diff hist +118 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) →DISADVANTAGED BUSINESS ENTERPRISES (DBE’s)
- 11:10, 26 October 2021 diff hist +77 109.05 Payment for Contract Revisions →Small Tools
- 11:04, 26 October 2021 diff hist -4 Local Agency Program (LAP) →MDOT Construction Oversight of Local Agency Program (LAP) Projects
- 11:03, 26 October 2021 diff hist -44 Materials Quality Assurance Procedures Manual
- 11:00, 26 October 2021 diff hist -45 108.01 Subcontracting of Contract Work →SUBCONTRACTING OF CONTRACT WORK
- 11:58, 25 October 2021 diff hist 0 109.05 Payment for Contract Revisions
- 11:28, 25 October 2021 diff hist -1 Force Account Work →Small Tools
- 11:26, 25 October 2021 diff hist -11 104.10 Claim for Extra Compensation or Extension of Time
- 11:23, 25 October 2021 diff hist 0 109.04 Progress and Partial Payments
- 10:53, 25 October 2021 diff hist 0 m 109.08 Prompt Payment