Pages with the most revisions

Jump to navigation Jump to search

Showing below up to 201 results in range #51 to #251.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 702 - Mortar and Grout‏‎ (20 revisions)
  2. 803 - Concrete Sidewalk, Ramps, and Steps‏‎ (19 revisions)
  3. 812 - Temporary Traffic Control for Construction Zone Operations‏‎ (19 revisions)
  4. 205 - Roadway Earthwork‏‎ (18 revisions)
  5. 815 - Landscaping‏‎ (17 revisions)
  6. 104.07 Contractor Obligations‏‎ (17 revisions)
  7. 713 - Bridge Rehabilitation, Steel‏‎ (16 revisions)
  8. MDOT Construction Manual Style Guide‏‎ (16 revisions)
  9. Notice of Non-Compliance with Contract Requirements‏‎ (16 revisions)
  10. 502 - HMA Crack Treatment‏‎ (16 revisions)
  11. 716 - Shop Cleaning and Coating Structural Steel‏‎ (16 revisions)
  12. 105.10 Buy America Source of Steel and Iron‏‎ (16 revisions)
  13. 107.09 Archeological and Historical Findings‏‎ (16 revisions)
  14. 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts‏‎ (15 revisions)
  15. 108.01 Subcontracting of Contract Work‏‎ (15 revisions)
  16. 204 - Removing Miscellaneous Structures and Materials‏‎ (15 revisions)
  17. 819 - Electrical and Lighting‏‎ (15 revisions)
  18. Structural Fabrication Quality Manual‏‎ (15 revisions)
  19. 401 - Culverts‏‎ (14 revisions)
  20. Project Closeout Escalation of Accountability‏‎ (14 revisions)
  21. 109.08 Prompt Payment‏‎ (14 revisions)
  22. Quality Initiatives and Adjustments‏‎ (13 revisions)
  23. 719 - Earth Retaining Structures‏‎ (13 revisions)
  24. FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)‏‎ (13 revisions)
  25. Contract Administration and Oversight Guidelines for Projects Containing Warranty Work‏‎ (13 revisions)
  26. Construction Value Engineering Change Proposal (VECP)‏‎ (13 revisions)
  27. 108.07 Extension of Time on Work Day Contracts‏‎ (12 revisions)
  28. 802 - Concrete Curb, Gutter, and Dividers‏‎ (12 revisions)
  29. Holiday Traffic Safety Provisions‏‎ (12 revisions)
  30. Construction Field Services Indirect Testing Charges‏‎ (12 revisions)
  31. 105.01 Quality and Scope of Supply‏‎ (11 revisions)
  32. Project Delays Due to a Utility Company‏‎ (11 revisions)
  33. 206 - Excavation and Backfill for Structures‏‎ (11 revisions)
  34. 307 - Aggregate Shoulders and Approaches‏‎ (11 revisions)
  35. 108.10 Liquidated Damages‏‎ (11 revisions)
  36. Process for Documenting Certified Materials in FieldManager‏‎ (11 revisions)
  37. 711 - Bridge Railings‏‎ (11 revisions)
  38. 109.04 Progress and Partial Payments‏‎ (11 revisions)
  39. 504 - Micro-Surfacing‏‎ (10 revisions)
  40. 813 - Slope Protection‏‎ (10 revisions)
  41. 1003 - Quality Assurance (Acceptance) for Concrete‏‎ (10 revisions)
  42. 106 - Quality Assurance Acceptance Program‏‎ (10 revisions)
  43. 201 - Clearing‏‎ (10 revisions)
  44. 108.05 Progress Schedule‏‎ (10 revisions)
  45. 202 - Removing Trees, Stumps, and Corduroy‏‎ (10 revisions)
  46. 304 - Rubbilizing Existing PCC Pavement‏‎ (10 revisions)
  47. 150 - Mobilization‏‎ (9 revisions)
  48. Division 7 Supplemental Information‏‎ (9 revisions)
  49. 301 - Subbase‏‎ (9 revisions)
  50. 816 - Turf Establishment‏‎ (9 revisions)
  51. Mandrel Testing of Plastic Pipe‏‎ (9 revisions)
  52. 402 - Storm Sewers‏‎ (9 revisions)
  53. 302 - Aggregate Base Courses‏‎ (9 revisions)
  54. 207 - Obliterating Roadway‏‎ (9 revisions)
  55. 717 - Downspouts and Drains‏‎ (9 revisions)
  56. 806 - Bicycle Paths‏‎ (9 revisions)
  57. 804 - Concrete Barriers and Glare Screens‏‎ (9 revisions)
  58. Division 2 Supplemental Information‏‎ (9 revisions)
  59. 505 - Chip Seals‏‎ (8 revisions)
  60. Extending Project Limits‏‎ (8 revisions)
  61. Section 601 - Portland Cement Concrete for Pavements‏‎ (8 revisions)
  62. 209 - Project Cleanup‏‎ (8 revisions)
  63. 809 - Field Office‏‎ (8 revisions)
  64. 203 - Removing Drainage Structures, Culverts, and Sewers‏‎ (8 revisions)
  65. 814 - Paved Ditches‏‎ (8 revisions)
  66. 101 - Terms, Format, and Conditions‏‎ (8 revisions)
  67. 506 - Slurry Seal‏‎ (8 revisions)
  68. 403 - Drainage Structures‏‎ (8 revisions)
  69. 805 - Hot Mix Asphalt Curb‏‎ (8 revisions)
  70. 822 - Ground or Cut Centerline and Shoulder Corrugations‏‎ (7 revisions)
  71. 824 - Contractor Staking‏‎ (7 revisions)
  72. 404 - Underdrain‏‎ (7 revisions)
  73. 808 - Fencing‏‎ (7 revisions)
  74. 107.01 Laws to be Observed‏‎ (7 revisions)
  75. 821 - Preservation of Land Monuments and Property Corners‏‎ (7 revisions)
  76. 801 - Concrete Driveways‏‎ (7 revisions)
  77. 107.15 Compliance with Laws; Environmental Protection‏‎ (7 revisions)
  78. 1002 - Contractor Quality Control for Concrete‏‎ (7 revisions)
  79. 817 - Landscape Mowing‏‎ (7 revisions)
  80. Interim File Review‏‎ (7 revisions)
  81. Work Order‏‎ (6 revisions)
  82. Processing Sewage/Storm Water Damage Claims‏‎ (6 revisions)
  83. Digital Calculations for Payment‏‎ (6 revisions)
  84. 405 - Pump Station Construction‏‎ (6 revisions)
  85. Construction Technology Support Resources‏‎ (6 revisions)
  86. 303 - Open Graded Drainage Course‏‎ (6 revisions)
  87. 306 - Aggregate Surface Course‏‎ (6 revisions)
  88. 107.12 Contractor's Responsibility for Utility Property and Services‏‎ (6 revisions)
  89. Contractor's Equipment and Traffic Control‏‎ (6 revisions)
  90. 305 - HMA Base Crushing and Shaping‏‎ (6 revisions)
  91. 109.01 Measurement of Quantities‏‎ (5 revisions)
  92. Letter to File‏‎ (5 revisions)
  93. 107.06 Furnishing Right-of-Way‏‎ (5 revisions)
  94. 503 - Paver Placed Surface Seal‏‎ (5 revisions)
  95. 406 - Precast Three-Sided, Arch, and Box Culverts‏‎ (5 revisions)
  96. 308 - Geotextiles for Base‏‎ (5 revisions)
  97. MDOT DENSITY TESTING AND INSPECTION MANUAL‏‎ (5 revisions)
  98. Weight Limit Waivers‏‎ (5 revisions)
  99. 109.02 Scope of Payment‏‎ (4 revisions)
  100. 109.03 Payments for Increased or Decreased Quantities‏‎ (4 revisions)
  101. 1004 - Portland Cement Concrete Mixtures‏‎ (4 revisions)
  102. Invalid title with namespace "(Main)" and text "101.4_INSPECTORS_DAILY_REPORT_(IDR)"
  103. 107.19 Hauling on Local Roads and Streets‏‎ (4 revisions)
  104. Division 3 Supplemental Information‏‎ (4 revisions)
  105. 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts‏‎ (4 revisions)
  106. FPR Frequently Asked Questions‏‎ (4 revisions)
  107. Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects‏‎ (4 revisions)
  108. Section 701 - Portland Cement Concrete for Structures‏‎ (4 revisions)
  109. FHWA CAP Action Plans‏‎ (4 revisions)
  110. 105.07 Handling and Transporting Materials‏‎ (4 revisions)
  111. 104.01 Authority of the Department‏‎ (4 revisions)
  112. 104.09 Lines, Grades, and Elevations‏‎ (3 revisions)
  113. Table of Contents by Project Phase‏‎ (3 revisions)
  114. Final Project Review Report‏‎ (3 revisions)
  115. Plans, Proposal, Input, Review and Evaluation‏‎ (3 revisions)
  116. Hot Mix Asphalt Production Manual‏‎ (3 revisions)
  117. Railroad Highway Projects‏‎ (3 revisions)
  118. 1005 - Mortar and Grout Mixtures‏‎ (3 revisions)
  119. 1006 - Patching, Repair, & Overlay Mixtures‏‎ (3 revisions)
  120. Table of Contents Division 1‏‎ (3 revisions)
  121. 900 - Materials‏‎ (3 revisions)
  122. 825 - Sanitary Sewer Systems‏‎ (2 revisions)
  123. Module:Documentation‏‎ (2 revisions)
  124. 826 – Intelligent Transportation Systems‏‎ (2 revisions)
  125. Division 4 Supplemental Information‏‎ (2 revisions)
  126. 108.08 Extension of Time on Calendar Day Contracts‏‎ (2 revisions)
  127. Module:Message box/configuration‏‎ (2 revisions)
  128. 102.14 Execution and Award of Contract‏‎ (2 revisions)
  129. Module:HtmlBuilder‏‎ (2 revisions)
  130. 102.15 Requirements of Contract Bonds‏‎ (2 revisions)
  131. 102.16 Bid Guaranty Payment‏‎ (2 revisions)
  132. Project with Consultant Oversight‏‎ (2 revisions)
  133. 103.01 Intent of the Contract‏‎ (2 revisions)
  134. 700 - Closure of Unsafe Structures‏‎ (2 revisions)
  135. Module:Yesno‏‎ (2 revisions)
  136. Module:Message box‏‎ (2 revisions)
  137. 102.03 Interpretation of Bid Items in the Proposal‏‎ (2 revisions)
  138. 1001 - Concrete Production Equipment and Facilities‏‎ (2 revisions)
  139. Module:Namespace detect/config‏‎ (2 revisions)
  140. Module:Namespace detect‏‎ (2 revisions)
  141. Module:Arguments‏‎ (2 revisions)
  142. 102.05 Preparation of Bid Items in the Proposal‏‎ (2 revisions)
  143. Module:Category handler‏‎ (2 revisions)
  144. Module:Documentation/config‏‎ (2 revisions)
  145. Module:Namespace detect/data‏‎ (2 revisions)
  146. 102.10 Bid Review‏‎ (1 revision)
  147. 104.12 Approval for Use of the Right of Way‏‎ (1 revision)
  148. 107.13 Personal Liability of Public Officials‏‎ (1 revision)
  149. 102.11 Bid Rejection‏‎ (1 revision)
  150. 105.02 Natural Material Sources Found Within the Excavation Limits‏‎ (1 revision)
  151. 107.14 No Waiver of Legal Rights‏‎ (1 revision)
  152. 102.12 Bid Rejection Appeal‏‎ (1 revision)
  153. 105.03 Borrow Materials‏‎ (1 revision)
  154. 107.16 Forest Protection‏‎ (1 revision)
  155. 102.13 Consideration of Bids‏‎ (1 revision)
  156. 105.04 Miscellameous Quantities‏‎ (1 revision)
  157. 107.17 Use of Explosives‏‎ (1 revision)
  158. 105.05 Approval of Materials Incorporated into the Work‏‎ (1 revision)
  159. 107.18 Work over Navigable Waters‏‎ (1 revision)
  160. 105.06 Storage of Materials‏‎ (1 revision)
  161. 105.08 Nonconforming Materials‏‎ (1 revision)
  162. 107.20 Private Railroad Crossing for Haul Purposes‏‎ (1 revision)
  163. Standard Rounding Convention Guidance‏‎ (1 revision)
  164. Table of Contents Division 1 Supplemental‏‎ (1 revision)
  165. 105.09 Materials not Incorporated into the Work‏‎ (1 revision)
  166. 108.02 Limitations of Operations‏‎ (1 revision)
  167. Density Training Videos‏‎ (1 revision)
  168. 103.03 Contractor Engineer Communication‏‎ (1 revision)
  169. 107.02 Permits and Licenses‏‎ (1 revision)
  170. 108.03 Competence of Workers‏‎ (1 revision)
  171. 104.02 Plans and Working Drawings‏‎ (1 revision)
  172. 107.03 Patented Process and Materials‏‎ (1 revision)
  173. 108.04 Adequacy of Methods and Equipment‏‎ (1 revision)
  174. 102.04 Examination of Plans, Specifications, and Work Site‏‎ (1 revision)
  175. 104.03 Deviations from the Plans‏‎ (1 revision)
  176. 107.04 Federal Aid Participation‏‎ (1 revision)
  177. 108.06 Determination of Contract Time for Work Day Contracts‏‎ (1 revision)
  178. 104.04 Conformity with the Contrat‏‎ (1 revision)
  179. 107.05 Sanitary Provisions‏‎ (1 revision)
  180. 108.11 Default of Contract‏‎ (1 revision)
  181. Projects with Incentive Provisions‏‎ (1 revision)
  182. 102.06 Irregular Bids‏‎ (1 revision)
  183. 104.05 Removal of Unauthorized Work‏‎ (1 revision)
  184. 107.07 Protection and Restoration of Property‏‎ (1 revision)
  185. 108.12 Termination of Contract‏‎ (1 revision)
  186. Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System‏‎ (1 revision)
  187. Pavement Historical Database‏‎ (1 revision)
  188. 102.07 Delivery of Bid‏‎ (1 revision)
  189. 104.06 Coordination of Drawing Dimensions and Contract Documentation‏‎ (1 revision)
  190. 107.08 Land Monuments and Property Corners‏‎ (1 revision)
  191. 109.06 Source of Supply and Carrier Rates on Materials‏‎ (1 revision)
  192. Information Sharing About Construction Contractors and Consultants‏‎ (1 revision)
  193. 102.08 Withdrawal or Revision of Bid‏‎ (1 revision)
  194. 104.08 Cooperation by the Contractor‏‎ (1 revision)
  195. 107.10 Indemnification, Damage Liability, and Insurance‏‎ (1 revision)
  196. 107.21 Open to Traffic‏‎ (1 revision)
  197. New CM Format Code‏‎ (1 revision)
  198. 102.09 Downloading of Bids‏‎ (1 revision)
  199. 104.11 Work Zone Safety and Mobility‏‎ (1 revision)
  200. 107.11 Contractor's Responsibility for the Work‏‎ (1 revision)
  201. 102.18 - OJT Program‏‎ (1 revision)

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)