==Construction Technology News==
 +
 +
====May 22, 2025====
 +
 +
Promise and possibility define the next few summery months in Michigan, with the sun shining endlessly, making our Great Lakes glisten and sparkle, some of our best journeys are when we take unexpected detours. So switch over to a read only role within APCM, make a few new clicks, generate a few new reports, and see where the journey takes you.
 +
 +
'''System Configurations and Guidance Updates'''
 +
 +
*'''''New Home Dashboards for Estimate and Change Order Approvers ''''' – The home screen has been updated for roles that approve estimates and change orders. The home screen for these roles now show a section for Estimates and Change Orders needing approval that are ready for that role's approval (contractors should only see change orders ready for contractor approval, construction engineers see only ones ready for the construction engineer approval, etc.)
 +
 +
*'''''A New Role Established For MDOT LAP Designated Reps ''''' – A new role has been created for those MDOT users who are responsible for overseeing local agency contracts with APCM, the new role is: “MDOT_CONSTRDESGREP.”  This role will allow the user to update certain aspects of the contract data, along with receive notifications when an LAP Change Order is submitted for Approval, an LAP Estimate is submitted for Approval, an LAP Change Order is submitted for Review (as part of review tracking). The user access request form has been update to include this new addition.  Please follow the link [https://forms.office.com/pages/responsepage.aspx?id=h3D71Xc3rUKWaoku9HIl0TsTFVcjU7lJvehSkBH9U3JUNjlTT0pOOFFSVzdKRkI3RERHSk4yOFRKTy4u MDOT AASHTOWare Project Construction & Materials User Account Request Form] to request this role.
 +
 +
 +
'''Did you know?...'''
 +
 +
You now can easily, print the page you are viewing in APCM, by simply pressing the CTRL + P on your keyboard. This printing keyboard shortcut brings up the Print dialogue, where you can set how you want to print. In the past when trying to print the screen you were viewing within APCM the system would overlap text and data fields, which made it nearly impossible to read.
 +
 +
 +
To view previous news articles, visit the [[Construction Technology News Archive]].
  
 
=Recent Updates=
 
=Recent Updates=
Line 21: Line 41:
 
{| class="wikitable" style=color:black"
 
{| class="wikitable" style=color:black"
 
!Updated!! Page!! Summary !! What Changed
 
!Updated!! Page!! Summary !! What Changed
 +
|-
 +
 +
|<center>05/07/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Daily_Work_Reports#DAILY_WORK_REPORTS Daily Work Reports]||Removed Material Comments and Sources section and updated New section related to [https://mdotwiki.state.mi.us/aashtoware/index.php?title=Daily_Work_Reports#Posting_Item_and_Material_Quantities_to_a_Daily_Work_Report Posting Item and Material Quantities to a Daily Work Report]
 +
||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Daily_Work_Reports&type=revision&diff=332&oldid=322 See what changed here.]
 +
|-
 +
|<center>04/15/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Contract_Administration#Adding_Subcontracts Contract Administration]||New section related to [https://mdotwiki.state.mi.us/aashtoware/index.php?title=Contract_Administration#Adding_Subcontracts Adding Subcontracts]||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Contract_Administration&type=revision&diff=321&oldid=315 See what changed here.]
 
|-
 
|-
 
|<center>4/1/2022</center>||<center>[[Materials_Acceptance|Materials Acceptance]]</center>||Created new page for related content||N/A
 
|<center>4/1/2022</center>||<center>[[Materials_Acceptance|Materials Acceptance]]</center>||Created new page for related content||N/A
Line 35: Line 61:
 
|-
 
|-
 
!Updated!! Page !! Summary !! What Changed
 
!Updated!! Page !! Summary !! What Changed
 +
|-
 +
|<center>3/20/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Materials_Acceptance#Copying_Material_Approvals_.28Sample_Records.29 Materials Acceptance]||Added content for how to Copy Material Approvals when working with Sample Records.
 +
||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Materials_Acceptance&type=revision&diff=379&oldid=359 See what changed here.]
 +
|-
 +
|<center>12/26/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Materials_Acceptance#Generating_Materials_and_Acceptance_Actions Generating Materials and Acceptance Actions]||Updated Generating Materials and Acceptance Actions.
 +
||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Materials_Acceptance&type=revision&diff=359&oldid=311 See what changed here.]
 +
|-
 +
|<center>09/12/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Main_Page Main Page]||Updated the Construction Technology News section for Fiscal Year-End updates.
 +
||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Main_Page&type=revision&diff=347&oldid=343 See Main Page changes here.]
 +
|-
 +
|<center>08/29/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Main_Page Main Page]||Updated the Construction Technology News section for August system updates. Updated guidance on entering subcontracts for trucking.
 +
||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Main_Page&type=revision&diff=342&oldid=337 See Main Page changes here.]
 +
[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Contract_Administration&type=revision&diff=341&oldid=321 See Subcontract changes here.]
 +
|-
 +
|<center>06/20/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php/Change_Orders Change Orders]||Updated content related to verifying funding source. Funding field is no longer shown on the screen in APCM, Related bullet point removed from following Change Order Sections:
 +
*[[Change_Orders#Adding_New_Items_to_a_Contract_with_a_Change_Order|Adding New Items to a Contract with a Change Order]]
 +
*[[Change_Orders#Adding_Unattached_Items|Adding Unattached Items]]
 +
*[[Change_Orders#Modifying_Contract_Items_.28Modified_Originals.29|Modifying Contract Items (Modified Originals)]]
 +
||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Change_Orders&type=revision&diff=336&oldid=325 See what changed here.]
 
|-
 
|-
 
|<center>04/15/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php/Change_Orders Change Orders]||Updated content related to verifying funding source in the following Change Order Sections:
 
|<center>04/15/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php/Change_Orders Change Orders]||Updated content related to verifying funding source in the following Change Order Sections:
Line 44: Line 89:
 
|<center>04/15/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Daily_Work_Reports#Approving_a_Daily_Work_Report Daily Work Reports]||Added note specifically related to [https://mdotwiki.state.mi.us/aashtoware/index.php?title=Daily_Work_Reports#Approving_a_Daily_Work_Report Approving Daily Work Reports]||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Daily_Work_Reports&type=revision&diff=322&oldid=198 See what changed here.]
 
|<center>04/15/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Daily_Work_Reports#Approving_a_Daily_Work_Report Daily Work Reports]||Added note specifically related to [https://mdotwiki.state.mi.us/aashtoware/index.php?title=Daily_Work_Reports#Approving_a_Daily_Work_Report Approving Daily Work Reports]||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Daily_Work_Reports&type=revision&diff=322&oldid=198 See what changed here.]
 
|-
 
|-
|<center>04/15/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Contract_Administration#Adding_Subcontracts Contract Administration]||New section related to [https://mdotwiki.state.mi.us/aashtoware/index.php?title=Contract_Administration#Adding_Subcontracts Adding Subcontracts]||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Contract_Administration&type=revision&diff=321&oldid=315 See what changed here.]
+
|<center>04/15/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Main_Page Main Page]||Update related to the release of AASHTOWare Project 5.00||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Main_Page#Construction_Technology_News See Construction Technology News]
|-
 
|<center>04/15/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Main_Page Main Page]||Update related to the release of AASHTOWare Project 5.00||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Main_Page#Construction_Technology_News See Construction Technology News below]
 
 
|-
 
|-
 
|<center>03/01/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php/Special_Topics Special Topics]||Created new Special Topics Page for [https://mdotwiki.state.mi.us/aashtoware/index.php?title=Final_Project_Review_Reporting_(Phase_Financial_Closeout_Information) Final Project Review Reporting]||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Special_Topics&type=revision&diff=314&oldid=283 See what changed here.]
 
|<center>03/01/2024</center>||[https://mdotwiki.state.mi.us/aashtoware/index.php/Special_Topics Special Topics]||Created new Special Topics Page for [https://mdotwiki.state.mi.us/aashtoware/index.php?title=Final_Project_Review_Reporting_(Phase_Financial_Closeout_Information) Final Project Review Reporting]||[https://mdotwiki.state.mi.us/aashtoware/index.php?title=Special_Topics&type=revision&diff=314&oldid=283 See what changed here.]
Line 70: Line 113:
 
! Issue Number !! Area of Impact !! Description !! Date Identified !! Workaround !! Fix Plan !! Fix Status !! Manual Reference Link  
 
! Issue Number !! Area of Impact !! Description !! Date Identified !! Workaround !! Fix Plan !! Fix Status !! Manual Reference Link  
 
|-
 
|-
| 3 || System Wide || When running a report that outputs in an Microsoft Excel file or other Microsoft Office file format, the report does not download and the system provides an ".htm" file that shows an error || 6/15/2022 || N/A || User needs to udpate Microsoft Edge settings || Closed || [https://mdotwiki.state.mi.us/aashtoware/index.php/Updating_Microsoft_Edge_Settings_for_Reports Updating Microsoft Edge Settings for Reports]
+
| 8 || Unattached Items || Currently, the system will incorrectly pay the entire posted quantity of an Unattached Item, up to that Payment Estimate period end date and does not account for any overrun based on related agency options settings. || 7/28/2023 || Currently running a SQL statement weekly, to proactively identify which contracts are affected, once identified Contracts will be manualy adjusted to assure proper payment. || Escalated APR-26692 to Critical status, will be a patch for APCM 4.8 || Open  ||
 
|-
 
|-
| 4 || Payments, Insufficient Materials || An update appears to have cause some materials that previously were approved to now show as insufficient. || 9/1/2022 || Office Technicians are advised to override the insufficent material exceptions as needed to prevent improper payment. || The issues has been verified to be inconsistent sources listed on DWRs and Sample Records. Office Technicians and Inspectors are advised to take note and care when recording material sources in the system. Reports are being developed to assist with data verification. || Closed ||  
+
| 9 || Materials Section within the Wiki || Please remove the phone number for the help desk as noted, below. || 2/29/2024 || ||  || Open  ||[https://mdotwiki.state.mi.us/aashtoware/index.php/Materials_Acceptance Materials Acceptance - AASHTOWare Wiki (state.mi.us)]
 
|-
 
|-
| 5 || Payments, $0 priced items || $0 priced items can cause the create payment estimate process to stop when a $0 priced item has any type of payment estimate exception that causes a payment item adjustment (insufficient material, overrun, etc.). || 11/2/2022 || Office Technicians are encouraged to process all material approvals and change orders prior to creating estimates. A DWR temporarily backing out the posting of the $0 priced item, with a negative posting, can temporarily allow estimates to be created until the proper material approvals and change orders for the $0 priced items can be processed. Once material approvals and change orders are processed to avoid payment exceptions, a followup DWR can be made to restore the original item posting. || TBD || Pending ||
+
| 10 || Pay Estimate Exception, Item/Material being flagged as insufficient || A new known issue has been discovered within APCM and we are working with InfoTech to correct the issue.If materials are posted to the wrong source, our guidance has been to back out the posting with an opposite/negative posting if a DWR revision is not possible. This guidance is still valid, however we have discovered that in some instances the system is getting locked up and not resetting the insufficient flag, thus continuing to claim the material is insufficient even after the user has corrected the issue by posting a negative material / source posting.  || 8/20/2024 || If you believe you are experiencing this known issue, please double check your materials, sources, and approval documentation to ensure that the item should be paid.  An override for the exception can be used to force payment remembering that you must add a comment when overriding the exception. || Other states have also reported this issue and we are working with InfoTech to get a patch to fix this issue. || Open ||
|-
 
| 6 || DWR, Item Quantities || On a DWR, an error is being returned when trying to post item quantities to the third decimal place. (example: 0.123) || 3/15/2023 || N/A || An emergency ticket has been submitted to DTMB to allow three decimal places for postings. || Pending  ||
 
|-
 
| 7 || Subcontracts, Approval Dates, DWR, Item Quantities || The 4.8 upgrade process appears to have caused data loss of the already entered approval dates for subcontracts. This is preventing the posting of quantities to subcontractors. || 3/15/2023 || The approval date can be manually re-entered to allow postings. || An emergency Ticket has been submitted to DTMB to restore the missing data. || Pending ||  
 
 
|}
 
|}
  
 
====Tracked Issues Complete List====
 
====Tracked Issues Complete List====
 
The complete list of tracked known issues can be found on the [https://mdotwiki.state.mi.us/aashtoware/index.php/Known_Issues_List Known Issues List] page.
 
The complete list of tracked known issues can be found on the [https://mdotwiki.state.mi.us/aashtoware/index.php/Known_Issues_List Known Issues List] page.
 
==Construction Technology News==
 
AASHTOWare Project 5.00 is here!
 
 
On April 15th MDOT upgraded to the 5.00 version of AASHTOWare Project software. By upgrading from version 4.8 to 5.00, MDOT is now able to take advantage of the more than 180 fixes and enhancements that were resolved or added across the system. Many of the fixes were behind the scenes and won’t be directly apparent to you as a user. However, there were a few that we would like to point out that will show up in the new version. We have compiled the list below with some matching updates to this manual.
 
 
 
 
*The drop-down options on the funding field in the change order area have been simplified and should only now show the correct funding for the new item based on the project category chosen when adding new items to the contract.
 
**[[Change_Orders#Adding_New_Items_to_a_Contract_with_a_Change_Order|Adding New Items to a Contract with a Change Order]]
 
**[[Change_Orders#Adding_Unattached_Items|Adding Unattached Items]]
 
**[[Change_Orders#Modifying_Contract_Items_.28Modified_Originals.29|Modifying Contract Items (Modified Originals)]]
 
 
 
*The policy that creators of DWRs cannot approve their own DWR has now fully been implemented in the system and the office tech role is being changed back to allow them to see their own DWRs under the Office Technician roles.
 
**[[Daily_Work_Reports#Approving_a_Daily_Work_Report|Approving a Daily Work Report]]
 
 
 
*Some estimate errors that occur while the estimate is being created will now be shown to the user in a pop-up message like other errors and warnings.
 
 
 
*The blue bar that contains the save button and corresponding action menu will now travel with you as you scroll long pages. This should make navigation and saving on pages with long lists easier.
 
 
 
*A new tab in the subcontract entry area has been added. This tab contains a scrollable grid similar to an excel spreadsheet and should make subcontract entry easier.
 
**[[Contract_Administration#Adding_Subcontracts|Adding Subcontracts]]
 
  
 
=Support Information=
 
=Support Information=

Latest revision as of 07:40, 23 May 2025

  • MDOT LOGO.png
  • AW Project Logo Construction & Materials.png
AASHTOWare Project Construction & Materials
Software Manual

Introduction

Welcome to the MDOT AASHTOWare Project Construction & Materials Software Manual!

AASHTOWare Project Construction & Materials is a fast, easy-to-use, web-based system for documenting construction progress, initiating contractor payment, and communicating with your agency's central office administration applications. Construction & Materials focuses on refining the work flow of construction contract management at all agency levels. With Construction & Materials, the field office can manage field-gathered data and then interface with a central office. Construction & Materials allows several users to update contract information, and it implements a shared database to expand an agency's data sharing ability. This user's guide is the key to discovering Construction & Materials’ vast capabilities and is a valuable resource both for novice and experienced users.

For more background information regarding AASHTOWare Project software visit the AASHTOWare Project webpage or the AASHTOWare Project Construction & Materials webpage.

Construction Technology News

May 22, 2025

Promise and possibility define the next few summery months in Michigan, with the sun shining endlessly, making our Great Lakes glisten and sparkle, some of our best journeys are when we take unexpected detours. So switch over to a read only role within APCM, make a few new clicks, generate a few new reports, and see where the journey takes you.

System Configurations and Guidance Updates

  • New Home Dashboards for Estimate and Change Order Approvers – The home screen has been updated for roles that approve estimates and change orders. The home screen for these roles now show a section for Estimates and Change Orders needing approval that are ready for that role's approval (contractors should only see change orders ready for contractor approval, construction engineers see only ones ready for the construction engineer approval, etc.)
  • A New Role Established For MDOT LAP Designated Reps – A new role has been created for those MDOT users who are responsible for overseeing local agency contracts with APCM, the new role is: “MDOT_CONSTRDESGREP.” This role will allow the user to update certain aspects of the contract data, along with receive notifications when an LAP Change Order is submitted for Approval, an LAP Estimate is submitted for Approval, an LAP Change Order is submitted for Review (as part of review tracking). The user access request form has been update to include this new addition. Please follow the link MDOT AASHTOWare Project Construction & Materials User Account Request Form to request this role.


Did you know?...

You now can easily, print the page you are viewing in APCM, by simply pressing the CTRL + P on your keyboard. This printing keyboard shortcut brings up the Print dialogue, where you can set how you want to print. In the past when trying to print the screen you were viewing within APCM the system would overlap text and data fields, which made it nearly impossible to read.


To view previous news articles, visit the Construction Technology News Archive.

Recent Updates

Recent Major Changes

The table below is a list of Major changes.

Updated Page Summary What Changed
05/07/2024
Daily Work Reports Removed Material Comments and Sources section and updated New section related to Posting Item and Material Quantities to a Daily Work Report See what changed here.
04/15/2024
Contract Administration New section related to Adding Subcontracts See what changed here.
4/1/2022
Materials Acceptance
Created new page for related content N/A
6/16/2021
-
Uploaded manual. N/A

Recent Minor Changes

The table below is a list of Minor changes.

Updated Page Summary What Changed
3/20/2024
Materials Acceptance Added content for how to Copy Material Approvals when working with Sample Records. See what changed here.
12/26/2024
Generating Materials and Acceptance Actions Updated Generating Materials and Acceptance Actions. See what changed here.
09/12/2024
Main Page Updated the Construction Technology News section for Fiscal Year-End updates. See Main Page changes here.
08/29/2024
Main Page Updated the Construction Technology News section for August system updates. Updated guidance on entering subcontracts for trucking. See Main Page changes here.

See Subcontract changes here.

06/20/2024
Change Orders Updated content related to verifying funding source. Funding field is no longer shown on the screen in APCM, Related bullet point removed from following Change Order Sections: See what changed here.
04/15/2024
Change Orders Updated content related to verifying funding source in the following Change Order Sections: See what changed here.
04/15/2024
Daily Work Reports Added note specifically related to Approving Daily Work Reports See what changed here.
04/15/2024
Main Page Update related to the release of AASHTOWare Project 5.00 See Construction Technology News
03/01/2024
Special Topics Created new Special Topics Page for Final Project Review Reporting See what changed here.
01/30/2024
Contract Administration Created section related to Transferring Contracts Between Offices See what changed here.
01/08/2024
Contract Administration - Closing and Archiving a Contract Updated steps for Closing and Archiving a Contract. See what changed here.
01/09/2023
Mobile Applications Provided content related to Syncing Contracts with Mobile Inspector Next section added [here]
09/29/2022
Change Orders Minor updates to clarify use of New Items tab for a change order. Changed title of Contract Items section and added explanation note to adding new items.
03/29/2022
Access and Roles - Available Roles Added page to main menu and added role names and descriptions to page. Tables for abbreviations and role names
03/24/2022
Contract Administration - Closing and Archiving a Contract Updated the Workflow Phase selection when archiving a contract. "Archived Contract" was changed to "Finance Closeout"

Tracked Known Issues

Most Recent Identified Known Issues
Issue Number Area of Impact Description Date Identified Workaround Fix Plan Fix Status Manual Reference Link
8 Unattached Items Currently, the system will incorrectly pay the entire posted quantity of an Unattached Item, up to that Payment Estimate period end date and does not account for any overrun based on related agency options settings. 7/28/2023 Currently running a SQL statement weekly, to proactively identify which contracts are affected, once identified Contracts will be manualy adjusted to assure proper payment. Escalated APR-26692 to Critical status, will be a patch for APCM 4.8 Open
9 Materials Section within the Wiki Please remove the phone number for the help desk as noted, below. 2/29/2024 Open Materials Acceptance - AASHTOWare Wiki (state.mi.us)
10 Pay Estimate Exception, Item/Material being flagged as insufficient A new known issue has been discovered within APCM and we are working with InfoTech to correct the issue.If materials are posted to the wrong source, our guidance has been to back out the posting with an opposite/negative posting if a DWR revision is not possible. This guidance is still valid, however we have discovered that in some instances the system is getting locked up and not resetting the insufficient flag, thus continuing to claim the material is insufficient even after the user has corrected the issue by posting a negative material / source posting. 8/20/2024 If you believe you are experiencing this known issue, please double check your materials, sources, and approval documentation to ensure that the item should be paid.  An override for the exception can be used to force payment remembering that you must add a comment when overriding the exception. Other states have also reported this issue and we are working with InfoTech to get a patch to fix this issue. Open

Tracked Issues Complete List

The complete list of tracked known issues can be found on the Known Issues List page.

Support Information

MI MDOT Software Support.png

AASHTOWare Construction & Materials Helpdesk
MDOT-ConstructionSoftware@michigan.gov

Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


Additional information about MDOT Construction Practices and Policies can be found on the Wiki Construction Manual.

For additional information about the AASHTOWare Wiki and to submit revision suggestions, please contact the AASHTOWare Construction & Materials Helpdesk.