Pages with the fewest revisions

Jump to navigation Jump to search

Showing below up to 232 results in range #21 to #252.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 107.03 Patented Process and Materials‏‎ (1 revision)
  2. 108.04 Adequacy of Methods and Equipment‏‎ (1 revision)
  3. 102.04 Examination of Plans, Specifications, and Work Site‏‎ (1 revision)
  4. 104.03 Deviations from the Plans‏‎ (1 revision)
  5. 107.04 Federal Aid Participation‏‎ (1 revision)
  6. 108.06 Determination of Contract Time for Work Day Contracts‏‎ (1 revision)
  7. 104.04 Conformity with the Contrat‏‎ (1 revision)
  8. 107.05 Sanitary Provisions‏‎ (1 revision)
  9. 108.11 Default of Contract‏‎ (1 revision)
  10. 102.06 Irregular Bids‏‎ (1 revision)
  11. 104.05 Removal of Unauthorized Work‏‎ (1 revision)
  12. 107.07 Protection and Restoration of Property‏‎ (1 revision)
  13. 108.12 Termination of Contract‏‎ (1 revision)
  14. 102.07 Delivery of Bid‏‎ (1 revision)
  15. 104.06 Coordination of Drawing Dimensions and Contract Documentation‏‎ (1 revision)
  16. 107.08 Land Monuments and Property Corners‏‎ (1 revision)
  17. 109.06 Source of Supply and Carrier Rates on Materials‏‎ (1 revision)
  18. Projects with Incentive Provisions‏‎ (1 revision)
  19. 102.08 Withdrawal or Revision of Bid‏‎ (1 revision)
  20. 104.08 Cooperation by the Contractor‏‎ (1 revision)
  21. 107.10 Indemnification, Damage Liability, and Insurance‏‎ (1 revision)
  22. 107.21 Open to Traffic‏‎ (1 revision)
  23. Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System‏‎ (1 revision)
  24. Pavement Historical Database‏‎ (1 revision)
  25. 102.09 Downloading of Bids‏‎ (1 revision)
  26. 104.11 Work Zone Safety and Mobility‏‎ (1 revision)
  27. 107.11 Contractor's Responsibility for the Work‏‎ (1 revision)
  28. 102.18 - OJT Program‏‎ (1 revision)
  29. Information Sharing About Construction Contractors and Consultants‏‎ (1 revision)
  30. Underground or Above Ground Fuel Storage Tanks‏‎ (1 revision)
  31. 102.10 Bid Review‏‎ (1 revision)
  32. 104.12 Approval for Use of the Right of Way‏‎ (1 revision)
  33. 107.13 Personal Liability of Public Officials‏‎ (1 revision)
  34. New CM Format Code‏‎ (1 revision)
  35. 102.11 Bid Rejection‏‎ (1 revision)
  36. 105.02 Natural Material Sources Found Within the Excavation Limits‏‎ (1 revision)
  37. 107.14 No Waiver of Legal Rights‏‎ (1 revision)
  38. 825 - Sanitary Sewer Systems‏‎ (2 revisions)
  39. Module:Documentation‏‎ (2 revisions)
  40. 108.08 Extension of Time on Calendar Day Contracts‏‎ (2 revisions)
  41. 102.14 Execution and Award of Contract‏‎ (2 revisions)
  42. 826 – Intelligent Transportation Systems‏‎ (2 revisions)
  43. Module:Message box/configuration‏‎ (2 revisions)
  44. 102.15 Requirements of Contract Bonds‏‎ (2 revisions)
  45. 102.16 Bid Guaranty Payment‏‎ (2 revisions)
  46. Module:HtmlBuilder‏‎ (2 revisions)
  47. 103.01 Intent of the Contract‏‎ (2 revisions)
  48. Project with Consultant Oversight‏‎ (2 revisions)
  49. 102.03 Interpretation of Bid Items in the Proposal‏‎ (2 revisions)
  50. Module:Message box‏‎ (2 revisions)
  51. Module:Yesno‏‎ (2 revisions)
  52. 700 - Closure of Unsafe Structures‏‎ (2 revisions)
  53. 102.05 Preparation of Bid Items in the Proposal‏‎ (2 revisions)
  54. Module:Namespace detect‏‎ (2 revisions)
  55. Module:Arguments‏‎ (2 revisions)
  56. 1001 - Concrete Production Equipment and Facilities‏‎ (2 revisions)
  57. Module:Category handler‏‎ (2 revisions)
  58. Module:Documentation/config‏‎ (2 revisions)
  59. Module:Namespace detect/config‏‎ (2 revisions)
  60. Module:Namespace detect/data‏‎ (2 revisions)
  61. Table of Contents by Project Phase‏‎ (3 revisions)
  62. Final Project Review Report‏‎ (3 revisions)
  63. Plans, Proposal, Input, Review and Evaluation‏‎ (3 revisions)
  64. Railroad Highway Projects‏‎ (3 revisions)
  65. Hot Mix Asphalt Production Manual‏‎ (3 revisions)
  66. 1005 - Mortar and Grout Mixtures‏‎ (3 revisions)
  67. 1006 - Patching, Repair, & Overlay Mixtures‏‎ (3 revisions)
  68. Table of Contents Division 1‏‎ (3 revisions)
  69. 900 - Materials‏‎ (3 revisions)
  70. 104.09 Lines, Grades, and Elevations‏‎ (3 revisions)
  71. 109.03 Payments for Increased or Decreased Quantities‏‎ (4 revisions)
  72. 1004 - Portland Cement Concrete Mixtures‏‎ (4 revisions)
  73. 107.19 Hauling on Local Roads and Streets‏‎ (4 revisions)
  74. Division 3 Supplemental Information‏‎ (4 revisions)
  75. Division 4 Supplemental Information‏‎ (4 revisions)
  76. Invalid title with namespace "(Main)" and text "101.4_INSPECTORS_DAILY_REPORT_(IDR)"
  77. 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts‏‎ (4 revisions)
  78. FPR Frequently Asked Questions‏‎ (4 revisions)
  79. Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects‏‎ (4 revisions)
  80. Section 701 - Portland Cement Concrete for Structures‏‎ (4 revisions)
  81. 105.07 Handling and Transporting Materials‏‎ (4 revisions)
  82. FHWA CAP Action Plans‏‎ (4 revisions)
  83. 104.01 Authority of the Department‏‎ (4 revisions)
  84. 109.02 Scope of Payment‏‎ (4 revisions)
  85. 503 - Paver Placed Surface Seal‏‎ (5 revisions)
  86. Letter to File‏‎ (5 revisions)
  87. 107.06 Furnishing Right-of-Way‏‎ (5 revisions)
  88. 406 - Precast Three-Sided, Arch, and Box Culverts‏‎ (5 revisions)
  89. 308 - Geotextiles for Base‏‎ (5 revisions)
  90. MDOT DENSITY TESTING AND INSPECTION MANUAL‏‎ (5 revisions)
  91. Weight Limit Waivers‏‎ (5 revisions)
  92. 109.01 Measurement of Quantities‏‎ (5 revisions)
  93. 305 - HMA Base Crushing and Shaping‏‎ (6 revisions)
  94. Processing Sewage/Storm Water Damage Claims‏‎ (6 revisions)
  95. Work Order‏‎ (6 revisions)
  96. Digital Calculations for Payment‏‎ (6 revisions)
  97. Construction Technology Support Resources‏‎ (6 revisions)
  98. 405 - Pump Station Construction‏‎ (6 revisions)
  99. 303 - Open Graded Drainage Course‏‎ (6 revisions)
  100. 306 - Aggregate Surface Course‏‎ (6 revisions)
  101. Contractor's Equipment and Traffic Control‏‎ (6 revisions)
  102. 107.12 Contractor's Responsibility for Utility Property and Services‏‎ (6 revisions)
  103. 822 - Ground or Cut Centerline and Shoulder Corrugations‏‎ (7 revisions)
  104. 824 - Contractor Staking‏‎ (7 revisions)
  105. 404 - Underdrain‏‎ (7 revisions)
  106. 808 - Fencing‏‎ (7 revisions)
  107. 107.01 Laws to be Observed‏‎ (7 revisions)
  108. 821 - Preservation of Land Monuments and Property Corners‏‎ (7 revisions)
  109. 801 - Concrete Driveways‏‎ (7 revisions)
  110. 107.15 Compliance with Laws; Environmental Protection‏‎ (7 revisions)
  111. 1002 - Contractor Quality Control for Concrete‏‎ (7 revisions)
  112. 817 - Landscape Mowing‏‎ (7 revisions)
  113. Interim File Review‏‎ (7 revisions)
  114. 505 - Chip Seals‏‎ (8 revisions)
  115. Section 601 - Portland Cement Concrete for Pavements‏‎ (8 revisions)
  116. Extending Project Limits‏‎ (8 revisions)
  117. 209 - Project Cleanup‏‎ (8 revisions)
  118. 809 - Field Office‏‎ (8 revisions)
  119. 203 - Removing Drainage Structures, Culverts, and Sewers‏‎ (8 revisions)
  120. 814 - Paved Ditches‏‎ (8 revisions)
  121. 101 - Terms, Format, and Conditions‏‎ (8 revisions)
  122. 506 - Slurry Seal‏‎ (8 revisions)
  123. 403 - Drainage Structures‏‎ (8 revisions)
  124. 805 - Hot Mix Asphalt Curb‏‎ (8 revisions)
  125. Division 7 Supplemental Information‏‎ (9 revisions)
  126. 150 - Mobilization‏‎ (9 revisions)
  127. 816 - Turf Establishment‏‎ (9 revisions)
  128. 301 - Subbase‏‎ (9 revisions)
  129. 402 - Storm Sewers‏‎ (9 revisions)
  130. 302 - Aggregate Base Courses‏‎ (9 revisions)
  131. 207 - Obliterating Roadway‏‎ (9 revisions)
  132. 717 - Downspouts and Drains‏‎ (9 revisions)
  133. 804 - Concrete Barriers and Glare Screens‏‎ (9 revisions)
  134. 806 - Bicycle Paths‏‎ (9 revisions)
  135. 504 - Micro-Surfacing‏‎ (10 revisions)
  136. Mandrel Testing of Plastic Pipe‏‎ (10 revisions)
  137. 1003 - Quality Assurance (Acceptance) for Concrete‏‎ (10 revisions)
  138. 813 - Slope Protection‏‎ (10 revisions)
  139. 106 - Quality Assurance Acceptance Program‏‎ (10 revisions)
  140. 201 - Clearing‏‎ (10 revisions)
  141. 108.05 Progress Schedule‏‎ (10 revisions)
  142. 202 - Removing Trees, Stumps, and Corduroy‏‎ (10 revisions)
  143. 304 - Rubbilizing Existing PCC Pavement‏‎ (10 revisions)
  144. 206 - Excavation and Backfill for Structures‏‎ (11 revisions)
  145. 105.01 Quality and Scope of Supply‏‎ (11 revisions)
  146. 711 - Bridge Railings‏‎ (11 revisions)
  147. 108.10 Liquidated Damages‏‎ (11 revisions)
  148. 307 - Aggregate Shoulders and Approaches‏‎ (11 revisions)
  149. Process for Documenting Certified Materials in FieldManager‏‎ (11 revisions)
  150. 109.04 Progress and Partial Payments‏‎ (11 revisions)
  151. Project Delays Due to a Utility Company‏‎ (11 revisions)
  152. 108.07 Extension of Time on Work Day Contracts‏‎ (12 revisions)
  153. 802 - Concrete Curb, Gutter, and Dividers‏‎ (12 revisions)
  154. Holiday Traffic Safety Provisions‏‎ (12 revisions)
  155. Construction Field Services Indirect Testing Charges‏‎ (12 revisions)
  156. Quality Initiatives and Adjustments‏‎ (13 revisions)
  157. 719 - Earth Retaining Structures‏‎ (13 revisions)
  158. FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)‏‎ (13 revisions)
  159. Contract Administration and Oversight Guidelines for Projects Containing Warranty Work‏‎ (13 revisions)
  160. Construction Value Engineering Change Proposal (VECP)‏‎ (13 revisions)
  161. 109.08 Prompt Payment‏‎ (14 revisions)
  162. 401 - Culverts‏‎ (14 revisions)
  163. Division 2 Supplemental Information‏‎ (14 revisions)
  164. Project Closeout Escalation of Accountability‏‎ (14 revisions)
  165. 108.01 Subcontracting of Contract Work‏‎ (15 revisions)
  166. 819 - Electrical and Lighting‏‎ (15 revisions)
  167. Structural Fabrication Quality Manual‏‎ (15 revisions)
  168. 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts‏‎ (15 revisions)
  169. 204 - Removing Miscellaneous Structures and Materials‏‎ (16 revisions)
  170. MDOT Construction Manual Style Guide‏‎ (16 revisions)
  171. Notice of Non-Compliance with Contract Requirements‏‎ (16 revisions)
  172. 502 - HMA Crack Treatment‏‎ (16 revisions)
  173. 716 - Shop Cleaning and Coating Structural Steel‏‎ (16 revisions)
  174. 105.10 Buy America Source of Steel and Iron‏‎ (16 revisions)
  175. 713 - Bridge Rehabilitation, Steel‏‎ (16 revisions)
  176. 107.09 Archeological and Historical Findings‏‎ (16 revisions)
  177. 815 - Landscaping‏‎ (17 revisions)
  178. 104.07 Contractor Obligations‏‎ (17 revisions)
  179. 205 - Roadway Earthwork‏‎ (18 revisions)
  180. 803 - Concrete Sidewalk, Ramps, and Steps‏‎ (19 revisions)
  181. 812 - Temporary Traffic Control for Construction Zone Operations‏‎ (19 revisions)
  182. 702 - Mortar and Grout‏‎ (20 revisions)
  183. 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes‏‎ (21 revisions)
  184. 709 - Timber Sturctures‏‎ (21 revisions)
  185. 710 - Waterproofing and Protective Covers‏‎ (23 revisions)
  186. Force Account Work‏‎ (23 revisions)
  187. Invalid title with namespace "(Main)" and text "Division_1__General_Provisions"
  188. 823 - Water Mains‏‎ (23 revisions)
  189. Materials Quality Assurance Procedures Manual‏‎ (25 revisions)
  190. Dispute Review Board (DRB)‏‎ (25 revisions)
  191. 102.19 Evaluation of Contractor Performance and Contract Non-Compliance‏‎ (26 revisions)
  192. Final Project Review‏‎ (26 revisions)
  193. Construction Manual Wiki Tips‏‎ (28 revisions)
  194. 701 - Portland Cement Concrete for Structures‏‎ (30 revisions)
  195. 706 - Structural Concrete‏‎ (30 revisions)
  196. 714 - Temporary Structures and Approaches‏‎ (30 revisions)
  197. 104.10 Claim for Extra Compensation or Extension of Time‏‎ (31 revisions)
  198. Certified Office Technician Process‏‎ (31 revisions)
  199. Preconstruction Meeting‏‎ (31 revisions)
  200. MDOT Construction Manual Content Revision Procedures‏‎ (32 revisions)
  201. 708 - Prestressed Concrete‏‎ (34 revisions)
  202. 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)‏‎ (34 revisions)
  203. Frequently Searched Items‏‎ (34 revisions)
  204. 102.01 Prequalification of Bidders‏‎ (35 revisions)
  205. 109.05 Payment for Contract Revisions‏‎ (35 revisions)
  206. Prevailing Wage‏‎ (39 revisions)
  207. 718 - Drilled Shafts‏‎ (40 revisions)
  208. 820 - Traffic Signals‏‎ (46 revisions)
  209. 704 - Steel Sheet Piling and Cofferdams‏‎ (46 revisions)
  210. 810 - Permanent Traffic Signs and Supports‏‎ (46 revisions)
  211. CONSTRUCTION MANUAL CONTENT TEMPLATE‏‎ (50 revisions)
  212. Dev Page‏‎ (55 revisions)
  213. Disadvantaged Business Enterprises (DBE)‏‎ (56 revisions)
  214. 208 - Soil Erosion and Sedimentation Control (NPDES)‏‎ (58 revisions)
  215. 603 - Concrete Pavement Restoration‏‎ (59 revisions)
  216. 707 - Structural Steel‏‎ (64 revisions)
  217. 705 - Foundation Piling‏‎ (65 revisions)
  218. 102.02 Contents of Proposal - Progress Clause‏‎ (66 revisions)
  219. FieldManager‏‎ (69 revisions)
  220. 109.07 Final Inspection, Acceptance, and Final Payment‏‎ (72 revisions)
  221. Certified Engineer Process‏‎ (74 revisions)
  222. 715 - Cleaning and Coating Existing Structural Steel‏‎ (79 revisions)
  223. 811 - Permanent Pavement Markings‏‎ (83 revisions)
  224. E-Signature‏‎ (100 revisions)
  225. Local Agency Program (LAP)‏‎ (110 revisions)
  226. 602 - Concrete Pavement Construction‏‎ (110 revisions)
  227. 103.02 Contract Revisions‏‎ (120 revisions)
  228. 712 - Bridge Rehabilitation, Concrete‏‎ (123 revisions)
  229. E-Construction‏‎ (152 revisions)
  230. 501 - Plant Produced Hot Mix Asphalt‏‎ (176 revisions)
  231. Standard Naming Convention‏‎ (248 revisions)
  232. Main Page‏‎ (632 revisions)

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)