Pages without language links
Jump to navigation
Jump to search
The following pages do not link to other language versions.
Showing below up to 232 results in range #21 to #252.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
- 102.13 Consideration of Bids
- 102.14 Execution and Award of Contract
- 102.15 Requirements of Contract Bonds
- 102.16 Bid Guaranty Payment
- 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)
- 102.18 - OJT Program
- 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 103.01 Intent of the Contract
- 103.02 Contract Revisions
- 103.03 Contractor Engineer Communication
- 104.01 Authority of the Department
- 104.02 Plans and Working Drawings
- 104.03 Deviations from the Plans
- 104.04 Conformity with the Contrat
- 104.05 Removal of Unauthorized Work
- 104.06 Coordination of Drawing Dimensions and Contract Documentation
- 104.07 Contractor Obligations
- 104.08 Cooperation by the Contractor
- 104.09 Lines, Grades, and Elevations
- 104.10 Claim for Extra Compensation or Extension of Time
- 104.11 Work Zone Safety and Mobility
- 104.12 Approval for Use of the Right of Way
- 105.01 Quality and Scope of Supply
- 105.02 Natural Material Sources Found Within the Excavation Limits
- 105.03 Borrow Materials
- 105.04 Miscellameous Quantities
- 105.05 Approval of Materials Incorporated into the Work
- 105.06 Storage of Materials
- 105.07 Handling and Transporting Materials
- 105.08 Nonconforming Materials
- 105.09 Materials not Incorporated into the Work
- 105.10 Buy America Source of Steel and Iron
- 106 - Quality Assurance Acceptance Program
- 107.01 Laws to be Observed
- 107.02 Permits and Licenses
- 107.03 Patented Process and Materials
- 107.04 Federal Aid Participation
- 107.05 Sanitary Provisions
- 107.06 Furnishing Right-of-Way
- 107.07 Protection and Restoration of Property
- 107.08 Land Monuments and Property Corners
- 107.09 Archeological and Historical Findings
- 107.10 Indemnification, Damage Liability, and Insurance
- 107.11 Contractor's Responsibility for the Work
- 107.12 Contractor's Responsibility for Utility Property and Services
- 107.13 Personal Liability of Public Officials
- 107.14 No Waiver of Legal Rights
- 107.15 Compliance with Laws; Environmental Protection
- 107.16 Forest Protection
- 107.17 Use of Explosives
- 107.18 Work over Navigable Waters
- 107.19 Hauling on Local Roads and Streets
- 107.20 Private Railroad Crossing for Haul Purposes
- 107.21 Open to Traffic
- 108.01 Subcontracting of Contract Work
- 108.02 Limitations of Operations
- 108.03 Competence of Workers
- 108.04 Adequacy of Methods and Equipment
- 108.05 Progress Schedule
- 108.06 Determination of Contract Time for Work Day Contracts
- 108.07 Extension of Time on Work Day Contracts
- 108.08 Extension of Time on Calendar Day Contracts
- 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
- 108.10 Liquidated Damages
- 108.11 Default of Contract
- 108.12 Termination of Contract
- 109.01 Measurement of Quantities
- 109.02 Scope of Payment
- 109.03 Payments for Increased or Decreased Quantities
- 109.04 Progress and Partial Payments
- 109.05 Payment for Contract Revisions
- 109.06 Source of Supply and Carrier Rates on Materials
- 109.07 Final Inspection, Acceptance, and Final Payment
- 109.08 Prompt Payment
- 150 - Mobilization
- 201 - Clearing
- 202 - Removing Trees, Stumps, and Corduroy
- 203 - Removing Drainage Structures, Culverts, and Sewers
- 204 - Removing Miscellaneous Structures and Materials
- 205 - Roadway Earthwork
- 206 - Excavation and Backfill for Structures
- 207 - Obliterating Roadway
- 208 - Soil Erosion and Sedimentation Control (NPDES)
- 209 - Project Cleanup
- 301 - Subbase
- 302 - Aggregate Base Courses
- 303 - Open Graded Drainage Course
- 304 - Rubbilizing Existing PCC Pavement
- 305 - HMA Base Crushing and Shaping
- 306 - Aggregate Surface Course
- 307 - Aggregate Shoulders and Approaches
- 308 - Geotextiles for Base
- 401 - Culverts
- 402 - Storm Sewers
- 403 - Drainage Structures
- 404 - Underdrain
- 405 - Pump Station Construction
- 406 - Precast Three-Sided, Arch, and Box Culverts
- 501 - Plant Produced Hot Mix Asphalt
- 502 - HMA Crack Treatment
- 503 - Paver Placed Surface Seal
- 504 - Micro-Surfacing
- 505 - Chip Seals
- 506 - Slurry Seal
- 602 - Concrete Pavement Construction
- 603 - Concrete Pavement Restoration
- 700 - Closure of Unsafe Structures
- 701 - Portland Cement Concrete for Structures
- 702 - Mortar and Grout
- 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes
- 704 - Steel Sheet Piling and Cofferdams
- 705 - Foundation Piling
- 706 - Structural Concrete
- 707 - Structural Steel
- 708 - Prestressed Concrete
- 709 - Timber Sturctures
- 710 - Waterproofing and Protective Covers
- 711 - Bridge Railings
- 712 - Bridge Rehabilitation, Concrete
- 713 - Bridge Rehabilitation, Steel
- 714 - Temporary Structures and Approaches
- 715 - Cleaning and Coating Existing Structural Steel
- 716 - Shop Cleaning and Coating Structural Steel
- 717 - Downspouts and Drains
- 718 - Drilled Shafts
- 719 - Earth Retaining Structures
- 801 - Concrete Driveways
- 802 - Concrete Curb, Gutter, and Dividers
- 803 - Concrete Sidewalk, Ramps, and Steps
- 804 - Concrete Barriers and Glare Screens
- 805 - Hot Mix Asphalt Curb
- 806 - Bicycle Paths
- 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts
- 808 - Fencing
- 809 - Field Office
- 810 - Permanent Traffic Signs and Supports
- 811 - Permanent Pavement Markings
- 812 - Temporary Traffic Control for Construction Zone Operations
- 813 - Slope Protection
- 814 - Paved Ditches
- 815 - Landscaping
- 816 - Turf Establishment
- 817 - Landscape Mowing
- 819 - Electrical and Lighting
- 820 - Traffic Signals
- 821 - Preservation of Land Monuments and Property Corners
- 822 - Ground or Cut Centerline and Shoulder Corrugations
- 823 - Water Mains
- 824 - Contractor Staking
- 825 - Sanitary Sewer Systems
- 826 – Intelligent Transportation Systems
- 900 - Materials
- CONSTRUCTION MANUAL CONTENT TEMPLATE
- Certified Engineer Process
- Certified Office Technician Process
- Construction Field Services Indirect Testing Charges
- Construction Manual Wiki Tips
- Construction Technology Support Resources
- Construction Value Engineering Change Proposal (VECP)
- Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects
- Contract Administration and Oversight Guidelines for Projects Containing Warranty Work
- Contractor's Equipment and Traffic Control
- Density Training Videos
- Dev Page
- Digital Calculations for Payment
- Disadvantaged Business Enterprises (DBE)
- Dispute Review Board (DRB)
- Invalid title with namespace "(Main)" and text "Division_1_–_General_Provisions"
- Division 2 Supplemental Information
- Division 3 Supplemental Information
- Division 4 Supplemental Information
- Division 7 Supplemental Information
- E-Construction
- E-Signature
- Extending Project Limits
- FHWA CAP Action Plans
- FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- FPR Frequently Asked Questions
- FieldManager
- Final Project Review
- Final Project Review Report
- Force Account Work
- Frequently Searched Items
- Holiday Traffic Safety Provisions
- Hot Mix Asphalt Production Manual
- Information Sharing About Construction Contractors and Consultants
- Interim File Review
- Letter to File
- Local Agency Program (LAP)
- MDOT Construction Manual Content Revision Procedures
- MDOT Construction Manual Style Guide
- MDOT DENSITY TESTING AND INSPECTION MANUAL
- Main Page
- Mandrel Testing of Plastic Pipe
- Materials Quality Assurance Procedures Manual
- Module:Arguments
- Module:Category handler
- Module:Documentation
- Module:Documentation/config
- Module:HtmlBuilder
- Module:Message box
- Module:Message box/configuration
- Module:Namespace detect
- Module:Namespace detect/config
- Module:Namespace detect/data
- Module:Yesno
- New CM Format Code
- Notice of Non-Compliance with Contract Requirements
- Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System
- Pavement Historical Database
- Plans, Proposal, Input, Review and Evaluation
- Preconstruction Meeting
- Prevailing Wage
- Process for Documenting Certified Materials in FieldManager
- Processing Sewage/Storm Water Damage Claims
- Project Closeout Escalation of Accountability
- Project Delays Due to a Utility Company
- Project with Consultant Oversight
- Projects with Incentive Provisions
- Quality Initiatives and Adjustments
- Railroad Highway Projects
- Section 601 - Portland Cement Concrete for Pavements
- Section 701 - Portland Cement Concrete for Structures
- Standard Naming Convention
- Standard Rounding Convention Guidance
- Structural Fabrication Quality Manual
- Table of Contents Division 1
- Table of Contents Division 1 Supplemental
- Table of Contents by Project Phase
- Underground or Above Ground Fuel Storage Tanks
- Weight Limit Waivers
- Work Order