Search results

Jump to navigation Jump to search

Page title matches

  • ...">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/E-Construction Email this Page]</div> ...: right; padding-right: 1px;">{{#ev:youtube|JbwlvmOTUrI|350|right|MDOT's e-Construction Process}}</div>
    12 KB (1,824 words) - 16:49, 18 April 2024
  • <center><span STYLE="font: 40pt arial;">'''Pump Station Construction'''</span></center> .../405%20Pump%20Station%20Constr.pdf 405] of the Standard Specifications for Construction, the plans and all other specifications should be closely followed. It is
    1 KB (201 words) - 17:47, 12 January 2022
  • ...TWzH0mNI|350|center|Click here to learn how to email links within the Wiki Construction Manual}}</div>
    1 KB (204 words) - 12:22, 7 May 2018
  • <center><span STYLE="font: 40pt arial;">'''Concrete Pavement Construction'''</span></center> *A curing compound should not be used when stored from one construction season to the next without resampling and testing.
    87 KB (13,988 words) - 15:30, 8 May 2024
  • ...://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page AASHTOWare Project Construction and Materials Software Manual]
    347 bytes (42 words) - 10:57, 22 August 2023
  • <center><span STYLE="font: 60pt arial;">'''CONSTRUCTION MANUAL CONTENT TEMPLATE'''</span></center> CONSTRUCTION MANUAL CONTENT TEMPLATE:
    14 KB (2,089 words) - 09:11, 11 April 2024
  • 39 bytes (5 words) - 09:15, 11 September 2013
  • #REDIRECT [[Construction Value Engineering Change Proposal (VECP)]]
    67 bytes (7 words) - 09:37, 8 June 2017
  • 90 bytes (7 words) - 10:22, 26 October 2017
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Construction_Value_Engineering_Change_Proposal_(VECP) Email this ...n the contract. Furthermore, federal documentation has defined VECPs as “a construction contract provision which encourages the contractor to propose changes in th
    9 KB (1,297 words) - 14:57, 11 October 2022
  • <center><span STYLE="font: 40pt arial;">'''MDOT Construction Manual Style Guide'''</span></center> ==[[#MDOT Construction Manual Style Guide|MDOT Construction Manual Style Guide]]==
    2 KB (326 words) - 15:30, 2 April 2024
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges Email this P ==[[#Construction Field Services Indirect Testing Charges|Construction Field Services Indirect Testing Charges]]==
    5 KB (701 words) - 08:12, 16 October 2023
  • ==Construction Manual Change Process== Suggested revisions to the MDOT Construction Manual are welcome from all users. The more users help improve the content
    5 KB (787 words) - 14:52, 19 December 2023
  • [[Category:Construction Manual]]
    2 KB (265 words) - 09:41, 3 January 2018
  • <center><span STYLE="font: 40pt arial;">'''Temporary Traffic Control for Construction Zone Operations'''</span></center> 3R/4R freeway work zone. Any alterations in the MOT during construction must take this into consideration along with consultation with Design and T
    6 KB (879 words) - 11:44, 29 March 2023

Page text matches

  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    655 bytes (74 words) - 12:46, 19 January 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    622 bytes (70 words) - 12:47, 19 January 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    627 bytes (71 words) - 17:48, 12 January 2022
  • ...lines will result in settlement and rutting. Rutting of the surface during construction and prior to final grading and shaping should be repaired by scarifying to ==[[#CONSTRUCTION|CONSTRUCTION]]==
    1 KB (153 words) - 16:58, 12 January 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    607 bytes (69 words) - 11:50, 19 January 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]][[Category:Construction Manual]]
    636 bytes (71 words) - 16:59, 12 January 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    609 bytes (68 words) - 13:07, 4 October 2023
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    610 bytes (69 words) - 18:16, 15 December 2021
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    603 bytes (67 words) - 12:45, 19 January 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    596 bytes (67 words) - 18:17, 15 December 2021
  • <center><span STYLE="font: 40pt arial;">'''Pump Station Construction'''</span></center> .../405%20Pump%20Station%20Constr.pdf 405] of the Standard Specifications for Construction, the plans and all other specifications should be closely followed. It is
    1 KB (201 words) - 17:47, 12 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Contractor%27s_Equipment_and_Traffic_Control Email this Page]</di ...s all other vehicles when utilizing an active lane within or adjacent to a construction work zone. The MSP’s Motor Carrier Division and local law enforcement ag
    1 KB (173 words) - 14:44, 19 January 2022
  • ...012/103%20Scope%20of%20Work.pdf 103.07] of the Standard Specifications for Construction for other cleanup items required to take place prior to final acceptance of ==[[#CONSTRUCTION|CONSTRUCTION]]==
    1 KB (205 words) - 10:08, 13 September 2023
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    1 KB (174 words) - 18:17, 15 December 2021
  • ...012/816%20Turf%20Establishment.pdf 816] of the Standard Specifications for Construction. ==[[#CONSTRUCTION|CONSTRUCTION]]==
    2 KB (222 words) - 10:06, 13 September 2023
  • ...ment structure. Test strips are generally required for establishment of a construction method for placement and compaction that will not cause degradation or segr ==[[#CONSTRUCTION|CONSTRUCTION]]==
    2 KB (223 words) - 16:43, 12 January 2022
  • <center><span STYLE="font: 40pt arial;">'''MDOT Construction Manual Style Guide'''</span></center> ==[[#MDOT Construction Manual Style Guide|MDOT Construction Manual Style Guide]]==
    2 KB (326 words) - 15:30, 2 April 2024
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ===[[#Longitudinal Construction Joints |Longitudinal Construction Joints ]]===
    2 KB (272 words) - 18:14, 15 December 2021
  • ...minor deviations from established MDOT procedures are required related to construction documentation the Engineer must document a Letter to the File explaining th #A description of the issue/deficiency, deviation from contract or MDOT Construction Manual, including quantities and costs
    3 KB (387 words) - 15:48, 6 May 2021
  • [[Category:Construction Manual]][[Category:Construction Manual]]
    288 bytes (30 words) - 10:14, 13 September 2023
  • ==[[#CONSTRUCTION|'''CONSTRUCTION''']]== ...er an asset is constructed. Please reference [https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports#INSPECTION_.26_T
    2 KB (199 words) - 15:46, 2 April 2024
  • ==[[#CONSTRUCTION|'''CONSTRUCTION''']]== ...s constructed or installed. Please reference [https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports#INSPECTION_.26_T
    2 KB (214 words) - 16:07, 2 April 2024
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    1 KB (177 words) - 12:47, 19 January 2022
  • :[http://mdotwiki.state.mi.us/construction/index.php/Construction_Contract_Modification_Process_Overview Contract Modi ...Standard-Specifications-Construction.pdf MDOT 2020 Standard Specifications Construction]
    2 KB (328 words) - 08:52, 8 May 2024
  • #REDIRECT [[E-Construction#Standard_Naming_Convention_for_Documents]]
    69 bytes (7 words) - 14:50, 22 August 2018
  • #REDIRECT [[E-Construction#Standard_Naming_Convention_for_Documents]]
    69 bytes (7 words) - 14:53, 22 August 2018
  • #REDIRECT [[E-Construction#General_Procedures_for_Construction_Records_Retention]]
    82 bytes (8 words) - 14:58, 22 August 2018
  • #REDIRECT [[Construction Value Engineering Change Proposal (VECP)]]
    67 bytes (7 words) - 09:37, 8 June 2017
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ...and stumps should be measured according to the Standard Specifications for Construction and the location of each item should be reported on the IDR when completed,
    2 KB (326 words) - 10:07, 13 September 2023
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== Service must be maintained during these construction operations.
    2 KB (304 words) - 10:05, 13 September 2023
  • ...uirements for these projects are the same as any state or federally funded construction project. The same procedures for inspection, pay item documentation, qualit ...tance and submission of the final estimate remain the same as for standard construction projects. In order to process the final estimate, the project records will
    1 KB (157 words) - 09:42, 3 January 2018
  • #REDIRECT [[MDOT Construction Manual Content Revision Procedures]]
    66 bytes (7 words) - 13:01, 28 April 2021
  • ==CONSTRUCTION== ...012/150%20Mobilization.pdf Section 150] of the Standard Specifications for Construction are to be documented on the IDR.
    2 KB (256 words) - 17:42, 12 January 2022
  • <center>[mailto:?body=https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed Email this Page]</center> ...aterial is a combination of background information and actions required by construction administration staff to ensure compliance with all applicable rules and reg
    650 bytes (79 words) - 17:20, 13 July 2021
  • ...://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page AASHTOWare Project Construction and Materials Software Manual]
    347 bytes (42 words) - 10:57, 22 August 2023
  • ...ese concerns, by either party, should be addressed and resolved at the pre-construction meeting. ==[[#CONSTRUCTION|CONSTRUCTION]]==
    2 KB (293 words) - 12:42, 19 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Structural_Fabrication_Quality_Manual Email this Page]</div> ...s [https://www.michigan.gov/mdot/programs/bridges-and-structures/structure-construction/structural-fabrication-unit/structural-fabrication-quality-manual SFQM webs
    1 KB (141 words) - 15:24, 11 January 2024
  • <center>[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting Email this Page]</center> ...representative, sent to all attendees, and placed in projects ProjectWise construction folder in file 107 Preconstruction and Progress Meetings.
    2 KB (320 words) - 11:18, 14 September 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/107.15_Compliance_with_Laws;_Environmental_Protection Email this Dust control is very important, especially during the earthwork phase of construction. Adequate dust control measures will be maintained by the Contractor so as
    686 bytes (98 words) - 17:36, 12 January 2022
  • ...ly under construction is addressed in the MDOT Standard Specifications for Construction, section 103.02.D, which describes the Suspension of Work Ordered by the En ...on 104.01.B describes the Authority of the Engineer to Suspend Work during construction.
    3 KB (442 words) - 17:11, 6 May 2021
  • ...ttp://mdotcf.state.mi.us/public/specbook/2012/ Standard Specifications for Construction]. ...ttp://mdotcf.state.mi.us/public/specbook/2012/ Standard Specifications for Construction], the Standard Plan R-46 Series and special details. Paved ditches will be
    3 KB (428 words) - 12:44, 19 January 2022
  • #REDIRECT [[E-Construction#e-Construction.2FPaper_File_System]]
    63 bytes (6 words) - 15:07, 22 August 2018
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 10:05, 14 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 10:09, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 11:55, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:03, 12 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:41, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 15:38, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 10:10, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 11:57, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 10:11, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 11:59, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 15:52, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:49, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 10:12, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:44, 14 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:32, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:54, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 13:35, 4 October 2023
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 12:03, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 13:27, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 11:18, 12 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:48, 14 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:36, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 13:36, 4 October 2023
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 11:21, 12 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 13:40, 4 October 2023
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:34, 23 October 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:50, 14 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 14:57, 18 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:00, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:05, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 13:37, 4 October 2023
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:52, 14 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 10:03, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:01, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 07:48, 12 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:10, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:10, 12 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:20, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:54, 14 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 10:04, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:05, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 07:52, 12 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:12, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:25, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 10:06, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 14:50, 25 June 2019
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 07:55, 12 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:15, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 13:26, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 10:00, 14 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 10:08, 11 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 09:09, 17 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 07:57, 12 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 18:01, 18 April 2017
  • [[Category:Construction Manual]]
    154 bytes (20 words) - 08:38, 17 April 2017
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Weight_Limit_Waivers Email this Page]</div> ...commercial vehicle safety and size regulation, your assistance in managing construction project equipment traveling on Michigan roadways is requested.
    3 KB (466 words) - 15:52, 19 January 2022
  • [[Category:Construction Manual]]
    164 bytes (21 words) - 15:05, 6 May 2021
  • [[Category:Construction Manual]]
    164 bytes (21 words) - 15:06, 6 May 2021
  • [[Category:Construction Manual]]
    164 bytes (21 words) - 15:06, 6 May 2021
  • [[Category:Construction Manual]]
    253 bytes (34 words) - 09:54, 8 March 2023
  • [[Category:Construction Manual]]
    252 bytes (34 words) - 09:52, 8 March 2023
  • ...gram (CAP) review noted several findings related to field documentation on construction projects. FHWA and MDOT [[media:CAP Action Plan MAD JUN172020.pdf|approved] ...eld documentation, etc. This procedure will be incorporated into the MDOT Construction Manual.
    3 KB (453 words) - 15:43, 6 May 2021
  • <center><span STYLE="font: 60pt arial;">'''CONSTRUCTION MANUAL CONTENT TEMPLATE - WIKI CODE'''</span></center> ==[[#CONSTRUCTION|'''CONSTRUCTION''']]==
    2 KB (163 words) - 15:53, 2 April 2024
  • <span STYLE="font: 15pt arial;">'''Pre-Construction'''</span><br /> [http://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal 102.02 Contents of Proposal]<br />
    7 KB (921 words) - 15:18, 26 July 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/104.01_Authority_of_the_Department Email this Page]</div> ...Work.pdf Section 104], Control of Work, in the Standard Specifications for Construction for details on the authority of MDOT, the Engineer and the inspector. Info
    1 KB (163 words) - 17:28, 12 January 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    2 KB (335 words) - 18:15, 15 December 2021
  • ...abilitation,_Concrete|Section 712 of the Construction Manual]] details the construction specifics in relation to deck patching and substructure patching utilizing ...%20Resurf%20Mixes.pdf subsection 703.02 of the Standard Specifications for Construction.]
    6 KB (791 words) - 11:43, 19 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension The Michigan Department of Transportation Construction Contractor Claims Procedure provides a formalized, tiered process for the s
    4 KB (643 words) - 12:08, 12 March 2024
  • ..._Book_WEB_728364_7.pdf#page=190 304.03] of the Standard Specifications for Construction. The existing pavement condition will determine the size of the shoe the C ..._Book_WEB_728364_7.pdf#page=821 902.05] of the Standard Specifications for Construction.
    4 KB (536 words) - 14:18, 16 February 2022
  • Construction staff are to minimize changes to incentive provisions within construction contracts. The procedures outlined below should be followed when proposing ...with the Region Engineer, Engineer of Construction Field Services, Region Construction Engineer, and the TSC Manager. A consensus must be reached as to the appro
    2 KB (362 words) - 09:34, 3 January 2018
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    3 KB (427 words) - 14:12, 16 February 2022
  • ==Construction Manual Change Process== Suggested revisions to the MDOT Construction Manual are welcome from all users. The more users help improve the content
    5 KB (787 words) - 14:52, 19 December 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges Email this P ==[[#Construction Field Services Indirect Testing Charges|Construction Field Services Indirect Testing Charges]]==
    5 KB (701 words) - 08:12, 16 October 2023
  • ...eptance Form. Refer to the Progress Clause portion of this section of the Construction Manual for instructions on preparation of Progress Clauses. ==[[#Design/Construction Package Evaluation|Design/Construction Package Evaluation]]==
    7 KB (1,055 words) - 11:29, 14 July 2020
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/105.07_Handling_and_Transporting_Materials Email this Page]</div> When transferring construction materials which were tested and accepted for a specific project but are to
    1 KB (163 words) - 17:32, 12 January 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    3 KB (465 words) - 11:50, 19 January 2022
  • Construction of bicycle paths consists of grading, placement of either concrete or HMA m ...ttp://mdotcf.state.mi.us/public/specbook/2012/ Standard Specifications for Construction] for specific mixes or grades of paving materials to be used.
    4 KB (545 words) - 12:41, 19 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/108.01_Subcontracting_of_Contract_Work Email this Page]</div> ...d. The subcontracting process is required on all state and federal funded construction projects. The Michigan Department of Transportation (MDOT) utilizes the fo
    5 KB (744 words) - 17:38, 12 January 2022
  • .../media/Project/Websites/MDOT/Business/Construction/Standard-Specifications-Construction/CFS-Manuals/Density-Testing-Inspection-Manual.pdf?rev=6ea61069b3b649e5bbd93 .../media/Project/Websites/MDOT/Business/Construction/Standard-Specifications-Construction/CFS-Manuals/Density-Testing-Inspection-Manual.pdf?rev=6ea61069b3b649e5bbd93
    2 KB (239 words) - 14:49, 21 September 2023
  • ...esponsible charge is certified under the MDOT [http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process Certified Engineer Process]. ...approving project selection, selecting the review team, and notifying the construction/project engineer.
    4 KB (556 words) - 15:47, 6 May 2021
  • ! '''Construction Year''' !! '''Acceptable Certificate Dates''' ...ons certification is a requirement for the prequalification category of '''Construction Inspection: HMA Pavement.''' No extensions will be allowed beyond the cer
    2 KB (275 words) - 17:05, 7 February 2023
  • .../2020-Standard-Specifications-Construction.pdf Standard Specifications for Construction]. ==[[#CONSTRUCTION|CONSTRUCTION]]==
    6 KB (797 words) - 17:08, 27 March 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Holiday_Traffic_Safety_Provisions Email this Page]</div> Construction and maintenance activity must be coordinated in order that all construction projects are in satisfactory condition for traffic safety during the Memori
    5 KB (579 words) - 12:33, 14 March 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    4 KB (552 words) - 16:44, 12 January 2022
  • <center><span STYLE="font: 40pt arial;">'''Temporary Traffic Control for Construction Zone Operations'''</span></center> 3R/4R freeway work zone. Any alterations in the MOT during construction must take this into consideration along with consultation with Design and T
    6 KB (879 words) - 11:44, 29 March 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Construction_Value_Engineering_Change_Proposal_(VECP) Email this ...n the contract. Furthermore, federal documentation has defined VECPs as “a construction contract provision which encourages the contractor to propose changes in th
    9 KB (1,297 words) - 14:57, 11 October 2022
  • ...20Rel,%20Resp%20to%20Public.pdf 107.07] of the Standard Specifications for Construction (Protection and Restoration of Property), and the Contractor should be so r ==[[#CONSTRUCTION|CONSTRUCTION]]==
    7 KB (999 words) - 17:47, 12 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Material_Source_List_Forms_(501)-Processing_and_Approval_Procedur # This does not relieve the construction/project engineer from verifying in the field that material quantities used
    4 KB (611 words) - 16:09, 25 May 2022
  • ...ons_Book_WEB_728364_7.pdf#page=638 812] of the Standard Specifications for Construction. ==[[#CONSTRUCTION|CONSTRUCTION]]==
    5 KB (803 words) - 11:16, 21 July 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Extending_Project_Limits Email this Page]</div> ...request will be denied or accepted for further processing. The Engineer of Construction and Technology will notify the requestor of a denial or acceptance within f
    4 KB (572 words) - 14:54, 19 January 2022
  • ...sure. Mortars are used to fix small concrete spalls, or in brick or block construction. Grout is used to flow into small voids, anchor dowels and/or provide cove ...tar%20and%20Grout.pdf subsection 702.02 of the Standard Specifications for Construction].
    5 KB (749 words) - 11:43, 19 January 2022
  • ...), in accordance with subsection 909.08 of the Standard Specifications for Construction. ...%20Metal%20Products.pdf subsection 908] of the Standard Specifications for Construction. See Figure 1.
    5 KB (743 words) - 11:48, 19 January 2022
  • ...yle="text-align: center;">[mailto:Change?body=https://mdotwiki.state.mi.us/construction/index.php?title=107.06_Furnishing_Right-of-Way Email this Page]</div> ...e request is outside of the project limits, the Engineer must contact MDOT Construction and Utility Permitting who will then submit the proposal to FHWA.
    4 KB (581 words) - 11:59, 22 May 2023
  • ...truction/Standard-Specifications-Construction/2020-Standard-Specifications-Construction.pdf#page=1075 1005 - Mortar and Grout Mixtures] [[Category:Construction Manual]]
    428 bytes (49 words) - 09:57, 13 September 2023
  • ...truction/Standard-Specifications-Construction/2020-Standard-Specifications-Construction.pdf#page=1079 1006 - Patching, Repair, & Overlay Mixtures] [[Category:Construction Manual]]
    451 bytes (49 words) - 09:57, 13 September 2023
  • ...and tested by the department according to the Standard Specifications for Construction. ...ttp://mdotcf.state.mi.us/public/specbook/2012/ Standard Specifications for Construction] for setting posts and installing fabric are not as restrictive as those fo
    6 KB (864 words) - 12:42, 19 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/107.12_Contractor%27s_Responsibility_for_Utility_Property_and_Ser ...e encourage staff to request certification from the contractor, at the pre-construction meeting, that a licensed electrician will be on site when performing electr
    3 KB (370 words) - 11:08, 25 April 2023
  • ...truction/Standard-Specifications-Construction/2020-Standard-Specifications-Construction.pdf#page=1042 1001 - Concrete Production Equipment and Facilities] [[Category:Construction Manual]]
    466 bytes (51 words) - 09:56, 13 September 2023
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ...sion%20Control%20Matls.pdf Section 916] of the Standard Specifications for Construction.
    4 KB (644 words) - 17:17, 19 September 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/105.01_Quality_and_Scope_of_Supply Email this Page]</div> ...ng and acceptance can be referred to the Region materials staff, or to the Construction and Technology Support Area staff.
    5 KB (767 words) - 14:44, 21 September 2023
  • ...will be as called for on the plans. However, if making adjustments during construction is necessary, the following guidelines should be followed. ==[[#CONSTRUCTION|CONSTRUCTION]]==
    5 KB (706 words) - 11:49, 19 January 2022
  • [[Category:Construction Manual]]
    507 bytes (56 words) - 17:23, 12 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Notice_of_Non-Complience_with_Contract_Requirements Email this Pa ...tion.pdf#page=50 Section 104.01.B] of the MDOT Standard Specifications for Construction and orders corrective action to take place by a certain date.
    2 KB (345 words) - 15:09, 26 September 2023
  • ..._Book_WEB_728364_7.pdf#page=821 902.05] of the Standard Specifications for Construction. 22A is to be used under areas that will be surfaced with Hot Mix Asphalt ==[[#CONSTRUCTION|CONSTRUCTION]]==
    6 KB (873 words) - 14:24, 16 February 2022
  • ...ing of coating surfaces that may be damaged during the erection process or construction. If more than 500 square feet of structural steel is to be shop coated, th ...lean,%20Coat%20Str%20St.pdf section 716 of the Standard Specifications for Construction.]
    8 KB (1,268 words) - 11:47, 19 January 2022
  • [[Category:Construction Manual]]
    390 bytes (44 words) - 17:34, 12 January 2022
  • [[Category:Construction Manual]]
    624 bytes (87 words) - 08:57, 5 January 2022
  • ...Soil Erosion and Sedimentation Control, of the Standard Specifications for Construction, and any applicable supplemental specifications, Michigan Department of Env ...Construction.pdf#page=130 201] Clearing of the Standard Specifications for Construction requires the cutting and removal of all trees, stumps, brush, shrubs and ot
    8 KB (1,133 words) - 12:01, 28 March 2023
  • <center>[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php?title=102.01_Prequalification_of_Bidders Email this Page]</center [https://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders#Contractor_Performance_Evaluat
    3 KB (385 words) - 15:22, 26 September 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/109.08_Prompt_Payment Email this Page]</div> ...the Engineer shall follow the procedures for [http://mdotwiki.state.mi.us/construction/index.php/109.08_Prompt_Payment#Alleged_Prompt_Payment_Complaints Alleged P
    3 KB (367 words) - 11:03, 25 April 2023
  • ...through the construction project closeout process to financial closeout. Construction project closeout is considered complete when the ‘Final Estimate Submitta *A [http://mdotwiki.state.mi.us/construction/index.php/Letter_to_File Letter to File] explaining the situation is create
    13 KB (1,768 words) - 11:05, 13 July 2023
  • ...but addresses those environmental issues that are commonly associated with construction earthwork projects. There is no comparable section of the standard specifi ...o the removal of the tank and preventing the spreading of contamination by construction activities. Any tank encountered within the ROW must be removed. Failure
    9 KB (1,344 words) - 10:51, 16 May 2024
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    6 KB (843 words) - 17:47, 12 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/107.09_Archeological_and_Historical_Findings Email this Page]</di ...ce (such as bones, artifacts or buried foundations) are encountered during construction. '''All project personnel shall treat any discovery as confidential. Phot
    5 KB (738 words) - 13:42, 1 April 2024
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== The importance of the proper construction of bridge abutment embankments cannot be overemphasized. The abutments are
    7 KB (1,044 words) - 10:08, 13 September 2023
  • ...20Guardrail,%20Misc%20Posts.pdf 807.03] of the Standard Specifications for Construction regarding completion of guardrail installations within specified time limit ==[[#CONSTRUCTION|CONSTRUCTION]]==
    7 KB (988 words) - 10:53, 8 April 2024
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ...ttp://mdotcf.state.mi.us/public/specbook/2012/ Standard Specifications for Construction] for details on additional pay items that may be associated with this work.
    6 KB (929 words) - 11:50, 19 January 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ...truction/Standard-Specifications-Construction/2020-Standard-Specifications-Construction.pdf#page=228 501.04] of the Standard Specifications.
    9 KB (1,264 words) - 13:09, 13 May 2024
  • ==[[#CONSTRUCTION|'''CONSTRUCTION''']]== ...s recommended that these notification requirements be discussed at the pre-construction meeting.
    9 KB (1,266 words) - 15:59, 2 April 2024
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual Email this Page]</d https://www.michigan.gov/mdot/business/construction/materials-quality-assurance-procedures
    1 KB (181 words) - 17:52, 22 January 2024
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Weight_Limit_Waivers Email this Page]</div> ...mdotwiki.state.mi.us/images_construction/9/95/2020-Standard-Specifications-Construction.pdf#page=108 subsection 109.01.B.1]. All terrain changes will be defined
    7 KB (1,088 words) - 12:47, 29 January 2024
  • <center>[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Railroad_Highway_Projects Email this Page]</center> ...iencies, evaluation of crossing/separation conditions and proposed highway construction and maintenance projects by the department, railroad companies, or private
    12 KB (1,772 words) - 17:35, 14 December 2023
  • [[Category:Construction Manual]]
    340 bytes (39 words) - 14:23, 17 May 2024
  • ...contact/employment information with the Construction Field Services (CFS) Construction Contracts Unit, Certification Engineer if they wish for their certification ...r items of work from multiple divisions of the Standard Specifications for Construction. Projects with all major work on a single pay item or division will only be
    10 KB (1,464 words) - 13:56, 29 November 2023
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ...face finish. If shown on the plans, ensure the Contractor places vertical construction joints at the required spacing
    7 KB (1,050 words) - 11:46, 19 January 2022
  • ...truction/Standard-Specifications-Construction/2020-Standard-Specifications-Construction.pdf#page=814 Section 901 Cement and Lime] ...truction/Standard-Specifications-Construction/2020-Standard-Specifications-Construction.pdf#page=814 Section 902 Aggregates]
    5 KB (487 words) - 09:41, 13 September 2023
  • [[Category:Construction Manual]]
    409 bytes (48 words) - 10:55, 16 May 2024
  • ...">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/E-Construction Email this Page]</div> ...: right; padding-right: 1px;">{{#ev:youtube|JbwlvmOTUrI|350|right|MDOT's e-Construction Process}}</div>
    12 KB (1,824 words) - 16:49, 18 April 2024
  • <center><span STYLE="font: 60pt arial;">'''CONSTRUCTION MANUAL CONTENT TEMPLATE'''</span></center> CONSTRUCTION MANUAL CONTENT TEMPLATE:
    14 KB (2,089 words) - 09:11, 11 April 2024
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Quality_Initiatives_and_Adjustments Email this Page]</div> ...und in the applicable special provision or the Standard Specifications for Construction.
    9 KB (1,226 words) - 10:05, 2 May 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/109.04_Progress_and_Partial_Payments Email this Page]</div> ...ations-Construction.pdf#page112 109.04] of the Standard Specifications for Construction and as covered by special provision.
    4 KB (456 words) - 09:22, 11 July 2023
  • ...TWzH0mNI|350|center|Click here to learn how to email links within the Wiki Construction Manual}}</div>
    1 KB (204 words) - 12:22, 7 May 2018
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Project_Delays_Due_to_a_Utility_Company Email this Page]</div> ...certifying utility issues are identified, addressed, and resolved prior to construction.
    9 KB (1,295 words) - 10:58, 4 May 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/108.10_Liquidated_Damages Email this Page]</div> ...814fb252b1ed2561 subsection 108.10.C.1] of the Standard Specifications for Construction. These damages represent the additional cost of engineering and supervisio
    9 KB (1,338 words) - 10:01, 27 July 2022
  • <center>[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Disadvantaged_Business_Enterprises_(DBE) Email this Page]</center EO requirements in FHWA, Form 1273, Required Contract Provisions Federal-Aid Construction Contracts, apply to all contractors, subcontractors, vendors and suppliers
    16 KB (2,309 words) - 14:51, 21 March 2024
  • The MDOT Construction Manual has published the following changes: ====[http://mdotwiki.state.mi.us/construction/index.php/Main_Page#Recent_Major_Changes Recent Major Changes]====
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Contract_Administration_and_Oversight_Guidelines_for_Intelligent_ ...ght requirements defined in Michigan Department of Transportation’s (MDOT) construction manual, standard specifications, instructional memorandums, advisories, and
    17 KB (2,411 words) - 15:12, 19 June 2017
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/E-Signature Email this Page]</div> ...lent of the individual's handwritten signature. [https://www.fhwa.dot.gov/construction/cqit/111204dol.cfm Read FHWA Direction on Electronic Signatures] A specific
    8 KB (1,208 words) - 15:30, 20 September 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/109.05_Payment_for_Contract_Revisions Email this Page]</div> ...g methods detailed in Subsection 109.05 of the Standard Specifications for Construction:
    6 KB (868 words) - 13:19, 6 June 2023
  • ...See [[707_-_Structural_Steel#Shop_Drawing_Review_Process|707 of the MDOT Construction Manual]] for shop drawing requirements. ==[[#CONSTRUCTION|CONSTRUCTION]]==
    9 KB (1,409 words) - 11:48, 19 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/104.07_Contractor_Obligations Email this Page]</div> ...ontractor’s accident prevention program (safety plan) as required of every construction employer by the Michigan Occupational Safety and Health Administration (MIO
    13 KB (1,841 words) - 11:18, 13 July 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)_Procedures Email this Page]</div> Please reference the [https://www.michigan.gov/mdot/business/construction/dispute-review-board MDOT - Dispute Review Board (DRB)] website for the cur
    2 KB (249 words) - 15:56, 11 July 2022
  • ...res a State Wetland Permit. Any unavoidable wetland impacts resulting from construction activities in a regulated wetland must be properly mitigated on a no net lo Regulates dam safety. Any construction, enlargement, repair, reconstruction, alteration, removal, or abandonment o
    19 KB (2,830 words) - 17:02, 15 February 2024
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Certification_Programs Email this Page]</div> ...style="text-align: right;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Certification_Programs Email this Page]</div>
    2 KB (218 words) - 09:59, 3 April 2024
  • The Standard Specifications for Construction subsection 108.05 contains the contract provisions for a progress schedule. * Is required to resolve construction disputes and/or claims concerning contract time.
    8 KB (1,206 words) - 14:27, 29 February 2024
  • ...that does not have active certification under [http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process MDOT’s Certified Engineer Program] o For procedures, please proceed to [http://mdotwiki.state.mi.us/construction/index.php/Interim_File_Reviews Interim File Review].
    19 KB (2,779 words) - 17:01, 6 November 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/108.09_Request_for_Time_Extensions_on_Work_Day,_Calendar_Day,_and ...Progress.pdf 108.08, 108.09 and 108.10] of the Standard Specifications for Construction. It is the responsibility of the Contractor to submit an Extension of Cont
    7 KB (1,127 words) - 15:50, 6 April 2023
  • <center>[mailto:Change?body=https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Comp [https://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders#Contractor_Performance_Evaluat
    20 KB (2,842 words) - 13:29, 4 October 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Local_Agency Email this Page]</div> ==[[#MDOT Construction Oversight of Local Agency Program (LAP) Projects|MDOT Construction Oversight of Local Agency Program (LAP) Projects]]==
    30 KB (4,182 words) - 18:40, 13 December 2023
  • ...es/2012/402%20Storm%20Sewers.pdf 402-1] of the Standard Specifications for Construction. Additional materials are now allowed for storm sewer pipe for use on stat ...es/2012/402%20Storm%20Sewers.pdf 402-1] of the Standard Specifications for Construction, the type and size of the sewer will be specified in the proposal or plans.
    16 KB (2,323 words) - 17:47, 12 January 2022
  • Concrete used in bridge construction will typically be one of three grades. Grade T is used for concrete being ...ack of cement. Refer to [[601_-_PCC_Pavement_Mixtures|Section 601 of this Construction Manual]] for equipment requirements for mixing and placing concrete.
    15 KB (2,322 words) - 11:43, 19 January 2022
  • ...OT or the Contractor to convey traffic, or construction equipment during a construction project. Temporary structures also include temporary works type items such * Construction and equipment loads
    19 KB (2,733 words) - 11:47, 19 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal Email this Page]</div> ...le requirements to the contractor. The progress clause is provided by the Construction Engineer at the Omissions and Errors Check (OEC) meeting. This document pr
    14 KB (2,146 words) - 13:54, 29 November 2023
  • [[Category:Construction Manual]]
    2 KB (265 words) - 09:41, 3 January 2018
  • ...mi.us/public/specbook/2012/ section 707 of the Standard Specifications for Construction.] Shop drawings shall be submitted for approval prior to fabrication. ...%20Mortar%20and%20Grout.pdf section 702 of the Standard Specifications for Construction] must be used under hydraulic jacks to provide a smooth and level bearing s
    14 KB (2,289 words) - 17:29, 10 April 2023
  • [[Category:Construction Manual]]
    1 KB (182 words) - 12:15, 1 May 2024
  • ==[[#CONSTRUCTION|'''CONSTRUCTION''']]== =====Construction Procedure=====
    15 KB (2,249 words) - 18:23, 15 February 2024
  • ===[[#DRY CONSTRUCTION METHOD|DRY CONSTRUCTION METHOD]]=== Dry construction methods are generally used when the water table is below the bottom of the
    28 KB (4,324 words) - 11:40, 25 April 2023
  • ...]]!![[File:Related Videos1.png|150px|left|link=http://mdotwiki.state.mi.us/construction/index.php/Construction_Manual_Wiki_Tips]]!![[File:Safety Topics1.png|150px| <center><span STYLE="font: 40pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
    28 KB (3,726 words) - 16:02, 8 March 2023
  • Pipe material is per Section 923 of the Standard Specifications for Construction. Pipe material is typically bituminous and cement lined cast iron material Water service material is per Section 923 of the Standard Specifications for Construction. Water services are a smaller diameter water line, usually made of copper,
    18 KB (2,799 words) - 14:01, 27 September 2023
  • ...y. For identification purposes photos of the [http://mdotwiki.state.mi.us/construction/index.php/Mandrel_Testing_of_Plastic_Pipe#Different_Types_of_Plastic_Pipe d ...being tested before it is used. Photos of a [http://mdotwiki.state.mi.us/construction/index.php/Mandrel_Testing_of_Plastic_Pipe#Nine_Point_Mandrel typical mandre
    5 KB (815 words) - 10:40, 16 May 2024
  • [[Category:Construction Manual]]
    2 KB (253 words) - 09:37, 3 January 2018
  • ...nstruction.pdf#page=541 Section 716.03] of the Standard Specifications for Construction. ...-Construction.pdf#page=211 Table 401-1] of the Standard Specifications for Construction. Additional materials are now allowed for culverts to be used on state tru
    15 KB (2,250 words) - 12:56, 4 October 2023
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ...%20CG%20and%20Dividers.pdf Section 802] of the Standard Specifications for Construction (also see '''''Figure 802-3'''''). When a curb is placed adjacent to a con
    12 KB (1,916 words) - 11:49, 19 January 2022
  • The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Product ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Hot_Mix_Asphalt_Production_Manual Email this Page]</div>
    4 KB (560 words) - 15:14, 19 June 2017
  • <center><span STYLE="font: 30pt arial;">'''Standard Specifications for Construction</span></center> ...ok/files/2012/701%20PCC%20for%20Structures.pdf Standard Specifications for Construction - Section 701].'''</span></center>
    12 KB (1,593 words) - 13:11, 26 July 2022
  • <center>[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php?title=102.18_Subletting_Contract_Work_to_Disadvantaged_Business_E ...style="text-align: right;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterpr
    27 KB (4,137 words) - 14:31, 17 April 2024
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment Email this ...onstruction meeting, as well as provided to the contractor through the pre-construction meeting minute document.
    28 KB (4,153 words) - 15:37, 11 January 2024
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Contract_Administration_and_Oversight_Guidelines_for_Projects_Con ...style="text-align: right;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Contract_Administration_and_Oversight_Guidelines_for_Projects_Con
    6 KB (848 words) - 14:44, 19 January 2022
  • .../files/2012/208%20SESC.pdf Section 208] of the Standard Specifications for Construction. .../917%20Landscaping%20Materials.pdf 917] of the Standard Specifications for Construction, the source of sod material should be an area with soils similar to the pre
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ==BRIDGE CONSTRUCTION AND BRIDGE DECK CONSTRUCTION INSPECTION AND DOCUMENTATION== ...ith the Standard Specifications for Construction, Divisions 6 and 7 of the Construction Manual, Special Provision 12SP604B QUALITY CONTROL AND ACCEPTANCE OF PORTLA
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/FieldManager Email this Page]</div> ...ge construction projects in Michigan. It is used by MDOT’s Region, TSC and construction field offices, local public agencies, and consultants. Business functions a
    25 KB (3,668 words) - 12:17, 1 May 2024
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Work_Order Email this Page]</div> [[Category: Construction Manual]]
    3 KB (424 words) - 15:52, 19 January 2022
  • ...er, boards and timbers. Generally, the preferred species for timber bridge construction are Douglas Fir/Larch and Southern or Mixed Pine. ...-Construction.pdf#page=909 section 912] of the Standard Specifications for Construction. Rules for grading are established by the U.S. Department of Commerce and
    18 KB (2,669 words) - 16:33, 10 January 2024
  • ...truction/Standard-Specifications-Construction/2020-Standard-Specifications-Construction.pdf#page=1062 Please see Stand Specifications section 1003 - Quality Assura ...ook/files/2012/605%20Conc%20QA.pdf 605] of the Standard Specifications for Construction.
    26 KB (3,908 words) - 11:41, 10 January 2024
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions Email this Page]</div> ===[[#Construction Contract Modification Process Overview|Construction Contract Modification Process Overview]]===
    50 KB (7,380 words) - 16:11, 1 April 2024
  • Roadway signage is a critical safety feature and construction staff should ensure all signage is properly constructed & installed correct ...ite large and will require close cooperation between all forces on highway construction projects so the roadway is signed properly when opened to traffic.
    19 KB (2,827 words) - 15:38, 2 April 2024
  • ...meaning the sheeting was designed to support earth pressures during staged construction, and removal of the sheeting may be detrimental to permanent structures. Sh ...50W as required in subsection 906.06.B of the Standard Specifications for Construction
    30 KB (4,732 words) - 15:44, 29 February 2024
  • <center><span STYLE="font: 25pt arial;">'''CONSTRUCTION MANUAL'''</span></center> <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center>
    68 KB (8,871 words) - 10:45, 13 May 2024
  • ...truction/Standard-Specifications-Construction/2020-Standard-Specifications-Construction.pdf#page=1070 Please see 1004 - Portland Cement Concrete Mixtures] All materials used in MDOT’s construction and maintenance projects must be tested and/or approved before incorporatio
    21 KB (3,052 words) - 16:41, 22 November 2023
  • ...chigan.gov/documents/CIS_WSH_part603_35656_7.pdf Part 603 Lead Exposure in Construction] (a MIOSHA regulation) and [https://stateofmichigan.sharepoint.com/:b:/r/si ...chigan.gov/documents/CIS_WSH_part603_35656_7.pdf Part 603 Lead Exposure in Construction] and [http://www.michigan.gov/documents/CIS_WSH_part451_54075_7.pdf Part 45
    33 KB (4,797 words) - 11:46, 25 April 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/105.10_Source_of_Steel_and_Iron Email this Page]</div> ...list can be found at the following https://www.michigan.gov/mdot/business/construction/standard-specifications-and-publications website under the References secti
    14 KB (2,171 words) - 07:32, 19 September 2023
  • ...truction/Standard-Specifications-Construction/2020-Standard-Specifications-Construction.pdf#page=1054 Please See Standard Specifications Section 1002 - Contractor ...01%20PCC%20Pavement%20Mixtures.pdf 601] of the Standard Specifications for Construction related to batch plant certification and concrete mixture criteria will be
    30 KB (4,172 words) - 17:23, 3 January 2024
  • ...to work closely with the fabricator’s QC and the department’s QA to ensure construction goes as smooth as possible. ...spun poles, and other prefabricated bridge elements for accelerated bridge construction. The Department’s quality assurance program is implemented by Bridge Fiel
    27 KB (4,105 words) - 11:45, 19 January 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ...een completed. This includes any work that may result in heavy vehicles or construction equipment turning on the line or tracking material over a recessed area.
    56 KB (7,443 words) - 17:48, 9 October 2023
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ...vt%20Restoration.pdf subsection 603.03] of the Standard Specifications for Construction.
    23 KB (3,714 words) - 10:16, 13 September 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Processing_Sewage/Storm_Water_Damage_Claims Email this Page]</div ...fax, e-mail or through direct contact with an individual in the course of construction or maintenance activities. If the central office in Lansing receives a dra
    20 KB (3,034 words) - 15:47, 19 January 2022
  • ...with preservative per subsection 912.06 of the Standard Specifications for Construction. ...rete, Grade 4000, per subsection 705.02 of the Standard Specifications for Construction.
    32 KB (5,122 words) - 14:16, 29 February 2024
  • ...yle="text-align: center;">[mailto:Change?body=https://mdotwiki.state.mi.us/construction/index.php/Force_Account_Work Email this Page]</div> ...ndard-Specifications-Construction.pdf#page=117 Standard Specifications for Construction subsection 109.05]. Following the [[109.05_Payment_for_Contract_Revisions|p
    41 KB (6,267 words) - 17:31, 6 June 2023
  • <center>[mailto:?body=https://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage Email this Page]</center> ...hese wage rates are compiled into a wage determination and included in the construction bid documents. The terms “laborer” and “mechanic” generally include
    63 KB (9,521 words) - 14:09, 1 April 2024
  • <center><span STYLE="font: 40pt arial;">'''Structural Steel Construction'''</span></center> ...y or secondary members, per 707.01 of the MDOT Standard Specifications for Construction. Structural steel may be in the form of plate, rolled or bent shapes, hollo
    45 KB (7,017 words) - 13:22, 26 July 2022
  • ...n/index.php/E-Construction#e-Construction.2FPaper_File_System Division 1 e-construction tables]. The element sequence and general format are as follows: ...n ProjectWise. ProjectWise allows for a user preference selection to view construction folders in file number format. Contact [mailto:MDOT-ProjectwiseConst@michi
    57 KB (6,792 words) - 10:37, 13 May 2024
  • <center><span STYLE="font: 40pt arial;">'''Structural Concrete Construction'''</span></center> The standard specifications contain details for Structural Concrete Construction.
    49 KB (7,967 words) - 12:41, 27 February 2024
  • ...etailing the excess properties is included (this is especially true in the construction of relocated freeway projects where several properties adjacent to the proj ...2/205%20Roadway%20Earthwork.pdf 205.03] of the Standard Specifications for Construction (Disposing of Surplus and Unsuitable Material) also apply.
    78 KB (12,236 words) - 14:45, 21 September 2023
  • <center><span STYLE="font: 30pt arial;">'''Standard Specifications for Construction</span></center> ...files/2012/601%20PCC%20Pavement%20Mixtures.pdf Standard Specifications for Construction - Section 601].'''</span></center>
    36 KB (5,127 words) - 13:21, 26 July 2022
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ...%20Rehab%20-%20Concrete.pdf section 712 of the Standard Specifications for Construction].
    84 KB (13,299 words) - 11:46, 19 January 2022
  • <center><span STYLE="font: 40pt arial;">'''Concrete Pavement Construction'''</span></center> *A curing compound should not be used when stored from one construction season to the next without resampling and testing.
    87 KB (13,988 words) - 15:30, 8 May 2024
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/104.09_Lines,_Grades,_and_Elevations Email this Page]</div> A large portion of engineering costs is represented by construction staking. If errors occur in staking, the cost can be considerable to MDOT.
    201 KB (30,214 words) - 14:43, 19 June 2017
  • Safety is everyone’s business on a construction project and there is further discussion of this under Pre-Production Meetin ...ations-Construction.pdf#page=844 904-2] of the Standard Specifications for Construction.
    139 KB (21,114 words) - 15:08, 30 January 2024

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)